|
| 1 | Comprehensive maintenance of \\"LABOTEK\\" make 3 phase microprocessor based UPS but without main transformer battery bank, battery circuit breaker and battery software etc including repairing / replacing all defective etc complete as reqd. details as under. |
| 2 | 2 x 10 KVA UPS |
| 3 | 2 x 15 KVA UPS |
| 4 | Supply & Fixing of SMF in the UPS installed at Various location of Bhagwan Mahavir Hospital, Pitampura, Delhi i/c connection with existing leads i/c dismantaling of old battery etc as red. |
| 5 | 12 volt 26 AH SMF batteries with Tow years warranty/Guarantee. |
| 6 | Comprehensive maintenance of \\"LABOTEK\\" make True online double conversion VFI technology, high frequency PWM using IGBT technology, parallel redundant, 3 phase AC input & 3 phase AC output UPS inpurt range should be 360 VAC-450 VAC, dual input (separate input for rectifiier and separate input for bypass etc including repairing / replacing all defective etc complete as reqd. details as under |
| 7 | 120 KVA - 3 Nos. |
| 8 | Comprehensive maintenance of \\"LABOTEK\\" make following rating UPS in paralleling mode at 0.99 input power factor with SNMP card, compatible for BMS connectivity on backnet/MODBUS, as per specification given in the document with following broad features etc complete as reqd. details as under |
| 9 | 200 KVA - 2 Nos. |
| 10 | Comprehensive maintenance of \\"LABOTEK\\" make True online double conversion VFI technology, high frequency PWD using IGBT technology , paralle redundant, 3 Phase AC input & 3 phase AC output UPS input range should be 360 VAC-450 VAC dual input (Separate input for rectifier and separate input for bypass.) etc including repairing / replacing all defective etc complete as reqd. details as under |
| 11 | 30 KVA - 1 No. |
| 12 | Comprehensive maintenance of \\"Datsons\\" make K-13 isolation transformer - cubicle IP-20 with copper winding with H class insulation including specification input - 415 V 3ph, 3W, delta, Output - 415 V, 3Ph, 4W ZIG ZAG, Digital meter to monitor with RS485 port including mannual soft start, natural cooling, LED indicating light for R,Y, & B phase etc including repairing / replacing all defective etc complete as reqd. details as under |
| 13 | 120 KVA - 3 Nos. |
| 14 | 30 KVA - 1 No. |
| 15 | Comprehensive maintenance of \\"MF\\" make static switch module with microprocessor based control and suitable for liner and non linear load at particulars distribution board of critical load in event of short circuit overload or any other fatal condition with built in technical protections like short circuit overload high / low voltage cut off protection of load etc including repairing / replacing all defective etc complete as reqd. details as under |
| 16 | 63A 3 Phase - 72 Nos. |
| 17 | 100A 3 Phase - 73 Nos. |
| 18 | Comprehensive maintenance of \\"MF\\" make static switch module with microprocessor based control and suitable for liner and non linear load at particulars distribution board of critical load in event of short circuit overload or any other fatal condition with built in technical protections like short circuit, overload, high low voltage cut off protection of load from source inclusive of bypass facility static bypass etc including repairing / replacing all defective etc complete as reqd. details as under |
| 19 | 63 A 1 Phase (For OT-1/2/3/ EMOT-4/LSCS OT-1/ICU/NICU) - 8 Nos. |
| 20 | Comprehensive maintenance of \\"ASCO\\" make Microprocessor based transient voltage surge suppression (TVSS) system with reset facility high / low voltage protection etc including repairing / replacing all defective etc complete as reqd. details as under |
| 21 | 50 KA for floor electrical panels - 42 Nos. |
| 22 | 400 KA for electrical substation - 16 Nos. |
| 23 | Comprehensive maintenance of \\"Schneider\\" make Precision air conditioner with horizontal air flow pattern, can be placed in between the racks or at the ends of rows, close to the heat source with 10 KW net sensible load capacity with return air temperature 35 deg C 24% RH & 43.3 deg C ambient) inside of cold aisle should maintain 22+/-1 deg C, 50+/- 5% RH unit should have digital scroll compressor compatiable with R410a refrigerant crancase heater loacking disconnect switch, etc including repairing / replacing all defective etc complete as reqd. details as under |
| 24 | Complete precision air conditioner system (PAC) for server room ( 1 nos. working + 1 No. Standby) |
| 25 | Comprehensive maintenance of \\"Schneider\\" make 3TR wall mounted high performance split type cooling unit suitable for critical technology / equipment room each unit shall faciliate installtion in small areas, shall feature robust design to run 24x7, auto restart function, monitoring with unit to unit communication and ease of service etc including repairing / replacing all defective etc complete as reqd. details as under |
| 26 | Complete 3 TR at 27+/-1 deg. C/40% RH (1 working + 1 Standby) PAC System for battery room |
| 27 | Comprehensive maintenance of \\"Schneider\\" make Floor mounted top flow / bottom flow / front flow, DX type precision air conditioners with microprocessor based controller etc including repairing / replacing all defective etc complete as reqd. details as under |
| 28 | Complete 7Tr at 23+/-1 Deg C (1 working + 1 standby) PAC system for Ups room. |
| 29 | Less credit of old dismantled batteries of followings capacity |
| 30 | 12 volt 26 AH Please Enable Macros to View BoQ information |