| 1 | Earth work in hard soil or gravelly soil within 50.0m initial lead and 1.5m initial lift including rough dressing and breaking clods to maximun 5 cm to 7 cm laying in layers not exceeding 0.30m in depth as per direction of E.I.C. |
| 2 | Supplying and filling of sand to the foundation bed of column pit, wall foundation and inside the filling with wellwatered and rammed etc and complete as per the direction of E.I.C |
| 3 | C.C (1:3:6) using 4cm size b.h.g (C.B) metal including cost, conveyance and royalty of all materials, cost of all labour, T&P etc., complete |
| 4 | Brick masonary in fly ash brick in cm (1:6) with all cost, convency, royality etc and complete as per direction of E.I.C |
| 5 | R.C.C work of M-20 grade with 20mm and down grade C.B chips including hoisting & laying including Centaring Shutring, cost, carriage and royalty , tax of materials |
| 6 | Plinth/Base Beam |
| 7 | Beam & culumn |
| 8 | Lintel |
| 9 | CHAJJA FRONT W |
| 10 | Supplying, fitting & placing uncoated HYSD bar reinforcement complete as per drawing and techinical specification with cost, conveyance of rod & binding, wire etc complete. |
| 11 | Brick masonary in fly ash brick in cm (1:6) with all cost, convency, royality etc and complete as per direction of E.I.C Super Structure |
| 12 | 12 mm thick plaster in cm 1:6 per 1 sqm |
| 13 | 16 mm thick plaster in cm 1:6 per 1 sqm |
| 14 | 2.5 cm grading Concrete (1:2:2) on roof slab using 12 mm size downgraded chips with all cost convency rolyality etc and complete |
| 15 | 6mm plaster in cm (1:4) to finish the smooth surface over RCC work including closed deep chipping with all cost, convency, royality etc and complete as per direction of E.I.C |
| 16 | Supplying,fitting & Fixing Veryfying tile in floors of size (600x600)mm |
| 17 | Finishing walls with water profofing cement paint of approved shade on new work two coat to give an even shade. |
| 18 | Fitting fixing of Iron Door and Window including all fittings etc and |
| 19 | Electrification and other unforeseen items Please Enable Macros to View BoQ information |