|
| 1 | Annual Comprehensive Maintenance of Water Cooler with inbuilt RO +UV of ATSIN Make with capacity 150 Ltr Storage Capacity and 150 ltr cooling capacity with 100 LPH RO System connected with water tank consisting of three mandatory Services, Repair/Replacement of all electrical and electronic spare parts like Speed Pump , Solenoid Valve, high pressure Switch but Except Membrane and Gas Charging) and Attending complaints within 24 working hours with complete overhauling and servicing etc as reqd. (7 Nos For 1 Job) |
| 2 | Annual Comprehensive Maintenanace of Water Cooler with inbuilt RO+UVof ATSIN Make with capacity 80 Ltr Storage Capacity and 60 ltr cooling capacity with 50 LPH RO Water Purifier connected with water tank consisting of three mandatory Services, Repair/Replacement of all electrical and electronic spare parts like Pump , Solenoid Valve, high pressure Switch and including One Time Replacement of Consumables item Once a year but Except Membrane and Gas Charging) and Attending complaints within 24 working hours with complete overhauling and servicing etc as reqd (Qty - (11 Nos For 1 Job) |
| 3 | Annual Comprehensive Maintenanace of Hot, Cold & Normal Water Dispenser with inbuilt RO+UV of ATSIN Make System connected with water tank consisting of three mandatory Services,Repair/Replacement of all electrical and electronic spare parts like Pump , Adaptor , Solenoid Valve and High Pressure Switch and Attending complaints within 24 working hours with complete overhauling and servicing etc as reqd. (Qty - 5 Nos For 1 Job ) |
| 4 | Annual Comprehensive Maintenanace of Existing RO Plant of capacity 500 LPH Capacity RO System connected with water tank consisting of three mandatory Services, repair/Replacement of all electrical and electronic spare parts inculdng consumables but Except RO Membrane and Attending complaints within 24 working hours with complete overhauling and servicing etc as reqd. (1 job For 12 Months) |
| 5 | Providing , Operation and Routine Preventive , Maintenance , of ATSIN Make Exisitng 500 LPH Capacity of RO Plant with allied accessories at PTS Malviya Nagar by deputing One Number of Operator cum technician from 9 AM to 5 PM in all working days excluding Sunday and Holidays For Smooth Operation and Routine checking to ensure proper Functioning of above plant and providing immediate assistance during breakdown situation i/c periodical services and repairing as and when reqd and as per terms and conditions attached and as per direction of Engineer-in-charge etc as reqd. (1 No. For 12 Months) |
| 6 | Skilled Operator - 1 Nos |
| 7 | Annual Repair and Comprehensive maintenance 250 HP Automatic phase corrector of ATSIN Make of following capacity i/c replacement of all types of defective parts such as diodes, transistors , transformers , sensors , indicating lights , reply transistors, PCB's IC's etv to keep in wokring conditions etc complete as reqd at site( Qty 2 Nos For 12 Months) |
| 8 | Supplying and Replacement of Following Spare/Components in the exisiting water Dispenser , Water Purifier with inbuilt RO+UV & RO Plants etc as reqd. |
| 9 | RO Membrane 80 GPD |
| 10 | Particulate Filter 20\\" |
| 11 | Activated Carbon 20\\" |
| 12 | Particulate Filter 10\\" |
| 13 | Activated Carbon 10\\" |
| 14 | Alkaline Filter For Water cooler |
| 15 | Alkaline Filter For Dispenser |
| 16 | RO Membrane 40x40 |
| 17 | RO Membrane 40x21 |
| 18 | Big Blue Filter 20\\" |
| 19 | Antiscalent Chemical |
| 20 | Sand Media |
| 21 | Carbon 1100 ID |
| 22 | Supplying and Charging of R 134 Gas charging in the 150/150 water cooler with inbuilt water purifier after pressure testing leak detection and rectified the breakage(if any ) testing and commissioning etc as reqd. |
| 23 | Supplying and Charging of R 134 A Gas in the water Dispenser of Capacity with inbuilt water purifier after pressure testing leak detection and rectified the breakage (if any ) testing and commissioning complete as reqd. |
| 24 | Supplying and Charging of R 134 A Gas in the water Cooler of Capacity with inbuilt water purifier after pressure testing leak detection and rectified the breakage (if any ) testing and commissioning complete as reqd. 60/80 Please Enable Macros to View BoQ information |