| 1 | Laying and Jointing PVC Pipe. Heading |
| 2 | Providing of E.C bag.(size bag.48 cm x 75 cm) and Nylon rope Crates size (0.90 X0.90X 0.90 M) & Filling of E.C bag.(size bag.48 cm x 75 cm) with local Earth i/c sewing and, Carriage upto 1.00 km. By power transport including laying, packing and tying in Nylon crates with placing in position i/c all cost of material, labour, carriage, T&P etc. Complete but excluding GST. |
| 3 | Dismantling stone pitching including clearing and stacking of material within 60 M. T&P etc. complete. But excluding G.S.T. |
| 4 | Collection of silt/sand from river bed at river bank by mud pump including stacking, T&P, etc for proper completion of work. But excluding G.S.T. |
| 5 | Earth work in cutting or in embankment in ordinary soil excavation to be in the from of regular pits & Earth work in embankment including lift upto 1.5 m and lead upto 30 m. also including labour, T&P etc. complete. But excluding G.S.T. |
| 6 | Laying & packing of Old Boulders (20 to 40 Kg. wt.) and tying in hexagonal. G.I Wire crate (1.50x1.50x0.45 M) Size by head load with placing in position i/c all cost of material, labour, carriage, T&P etc. complete but excluding. GST. |
| 7 | Providing, Laying & packing of New Boulders/Cut Stone (20 to 40 Kg. wt.) and tying in hexagonal G.I. Wire crate (1.50x1.50x0.45 M) Size by head load with placing in position i/c all cost of material, labour, carriage, T&P etc. complete but excluding. GST. |
| 8 | Providing, laying & packing of Boulders/Cut stone (20 to 40 Kg. wt.) and tying in hexagonal G.I Wire crate (3x1.50x1.0 M) Size by head load with placing in position i/c all cost of material, labour, carriage, T&P etc. complete but excluding. GST. |
| 9 | Providing and laying of Geo textile sheet made of 200 gsm woven multifilament polypropylene yarn / Non woven geo Sheet with placing in position i/c all cost of labour, carriage, T&P etc. complete but excluding. GST. |
| 10 | Providing and laying of Boulder Pitching with Boulders (20 to 40 Kg. wt.)in spur/Stud by head load with placing in position i/c all cost of labour, carriage, T&P etc. complete but excluding. GST. |
| 11 | Bricks (S.O.B) on edge pavement on patries laid and dry, joints filled with local sand including preparation of base to proper slope & its ramming. Spreading layer of 1 cm (3/8\\") depth of local sand over the sub-grade and including supply of all materials labour and T&P etc. required for proper completion of the work. But excluding GST. |
| 12 | Earth work in filling of bund including carriage of earth upto 1.00 km & lift 1.5 m with proper levelling dressing manual compaction , cost of earth, labour, T&P etc complete. But excluding G.S.T. Please Enable Macros to View BoQ information |