| 1 | BUILDING WORKS (G) WOOD AND PVC WORKS B. DOOR WINDOW SHUTTER 1. Panel shutters of door and window, as per design (each panel consisting of single plank without joint), including fitting and fixing the same in position but excluding the cost of hinge and other fittings.In ground floor. (In case of non-supply of single plank, penal rate of reduction of 20% will be made) (iii) 35mm thick shutters with 19mm thick panel of size 30 to 45 cm. (b) Sishu, Gamar, Champ,Badam,Bhola, Mogra, Hallak. Note: i) Lifting Charges for upper floors refer item H (2). (ii) In case of panel with Rly. Type batton the rates will be reduced by Rs.20.00 /Sq.m.) |
| 2 | BUILDING WORKS (G) WOOD AND PVC WORKS D. ACCESSORIES 5. Iron butt hinges of approved quality fitted and fixed with steel screws, with ISI mark (viii) 100mm. X 75mm. X 3.50mm.. (Add Extra 30% for Oxidised Fittings) |
| 3 | BUILDING WORKS (G) WOOD AND PVC WORKS D. ACCESSORIES 7. Iron catch hook of approved quality fitted and fixed to shutter and chowkat (d) 10mm dia x 375mm long. |
| 4 | BUILDING WORKS (G) WOOD AND PVC WORKS D. ACCESSORIES 28. Anodised aluminium Aldrop / Sliding bolts of approved quality manufactured from extruded section conforming to I.S. specification (I.S. 2681/66) fitted and fixed complete (iii) 300mm x 16mm dia. bolt. |
| 5 | SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 1 (b) Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. (This item is applicable to new work or old work when the original surface has been exposed by removal of old paint.) |
| 6 | SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 2 (A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :(a) On timber or plastered surface :With super gloss (hi-gloss) -(iv) Two coats (with any shade except white) |
| 7 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc?36..Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor).(When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 m or part thereof).(b) Above 30 mm & upto 37 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.Notes:- For shuttering in shell roof, grid roof with vertical faces folded plate, arched roof the rate in 36 (a), 36 (b) & 37 (c ) of subhead B above to be increased by 100 % . For grid roof with splayed faces, rate is to be increased by 150%.Notes:- For shuttering in shell roof, grid roof with vertical faces folded plate, arched roof the rate in 36 (a), 36 (b) & 37 (c ) of subhead B above to be increased by 100 % . For grid roof with splayed faces, rate is to be increased by 150%. |
| 8 | (B) - SANITARY AND DRAINAGE WORKS.(B)-(III) WATER CLOSETS AND URINALS.a) Original Works.(3)Supplying, fitting and fixing Anglo-Indian W.C. in white glazed vitreous china ware of approved make complete in position with necessary bolts, nuts etc.(b) With 'S' trap (with vent)..N.B. For W.C. with trap without vent the rate will be reduced by Rs.25.00 |
| 9 | BUILDING WORKS(L) GLAZIER'S WORK?..(A)... ORIGINAL WORKS?.(1)Supplying best Indian sheet glass panes set in putty and fitted and fixed with nails and putty complete. (In all floors for internal wall & upto 6m height for external wall)(ii) 4 mm thick |
| 10 | BUILDING WORKS (E) ROOFING, SHEET WALLING &WATERPROOF TREATMENT . A. ROOFING & SHEETWALLING 7. Asbestos corrugated (Trafford or similar approved quality) sheet (6 mm thick) work (excluding the supporting framework) fitted and fixed with 9.5mm. dia. J or L hook-bolt and nuts, limpet and bitumen washers and putty with 150 mm end lap & one corrugation minimum side lap complete. (Payment should be made on area of finished work) (a) In Roof |
| 11 | PLUMBING WORKS (A)-(II) G.I. PIPE WORKS AND FITTINGS (b) Repair Works 22. Dismantling upto 100 mm sluice valve by parts and cutting out worn out bolts and reassembling the same after regrinding valve,rewashering flanges, asbestos diamond packing including studs,bolts, nuts and necessary repairs |
| 12 | BUILDING WORKS (G) WOOD AND PVC WORKS B. DOOR WINDOW SHUTTER 15. Supplying, Fitting & Fixing 30 mm thick Factory made solid Panel PVC Door Shutter consisting of outer frame made out of M.S. tubes of 19 gauge thicknessand size 19 mmx19 mm for styles, top and bottom rails, M.S. frame shall have cost of steel primers of approved make and manufacture, M.S. frame covered with 5 mm th. heat moulded PVC ?C? channel of size 30 mm th, 70 mm width out of which 50 mm shall be flat and 20 mm shall be tapered in 45 degree angle on either sides forming styles; and 5 mm th. 95 mm wide PVC sheet out of which 75 mm shall be flat and 20 mm tapered in 45 degree on the inner side to form top & bottom rail and 115 mm wide PVC sheet out of which 75mm shall be flat and 20 mm shall be tapered on both sides to form lock rail. Top, bottom and lock rails shall be provided either side of the panel with 10 mm (5 mmx2) th.,20 mm wide cross PVC sheet as gap insert for top rail and bottom rail. Paneling of 5 mm th. both side PVC sheet to be fitted in the M.S. frame welded/sealed to the styles &rails with 7 mm (5 mm+2 mm) th.x15 mm wide PVC sheet beading on inner side and joined together with solvent cement adhesive. An additional 5 mm th. PVC strip of 20 mm which is to be stuck on the interior side of the ?C? channel using PVC solvent adhesive etc. complete excluding all necessary hardwares as per direction of Engineer-in-Charge. In ground floor |
| 13 | SECTION (A) - PLUMBING WORKS (A)-(IV) CISTERN, G.I.TANKS WITH PARTS Item No. (a) Original Works Supplying, fitting and fixing 10 litre porcelain low-down cistern of approved make with either side or bottom inlet, side overflow, brackets complete with all internnal PVC fittings. White N.B. Cisterns the rate will enhanced over the corresponding item of white Porcelain cistern as follows. a) Sky blue, Venetian, Min. green, Turquoise, Citrus yellow , Champage, Saphire - By 50% (b) Roman brown, Fern green, Misty lilac, Orange, Sienna gold, Silver grey, Sepia, Alpine, Cornil sorvinto blue - 100% (c) Burgandy, Emerald green coloured - 200% |
| 14 | PLUMBING WORKS (A)-(II) G.I. PIPE WORKS AND FITTINGS 7. Supplying, fitting and fixing bib cock or stop cock. (e) PTMT (Polytetra Bib Cock / Stop Cock ( Prayag or equivalent) 15 mm |
| 15 | PLUMBING WORKS (A)-(II) G.I. PIPE WORKS AND FITTINGS 19(I) Supplying, fitting and fixing PVC pipes of approved make of Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with GI Pipes as per IS : 1239 (Part - I). with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes, making threads,fitting, fixing etc. complete in all respect including cost of all necessary fittings as required,jointing materials and two coats of painting with approved paint in any position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accesories, specials. Payment for painting will be made seperately) (a) For Exposed Work PVC Pipes (Dia) (a)15 mm |
| 16 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages. |
| 17 | BUILDING WORKS (G) WOOD AND PVC WORKS G. WALL PANELLING 3. Supplying, fitting and fixing boiling water resistant ply conforming to IS: 303- 1989 bonded with phenol formaldehyde synthetic resin of approved make and brand fitted and fixed as per design as per approval and direction of Engineer-in- Charge.[excluding the cost of supporting frame work and teak wood batten/Lipping] In Ground Floor (i) 4mm .(Note: For Boiling Water Resistant Block Boards reduce the above rates by 5%). For upper floor refer Item H (4) for item 1, 2, 3, 4 under subhead G |
| 18 | BUILDING WORKS (G) WOOD AND PVC WORKS A. DOOR WINDOW FRAME 1. Wood work in door and window frame fitted and fixed in position complete including a protective coat of painting at the contact surface of the frame exluding cost of concrete, Iron Butt Hinges and M.S clamps. (The quantum should be correted upto three decimals). (f) Sishu, Gamar, Champ, Badam, Bhola, Mogra, Hallak Note: Extra for Lifting Charges for each additional floor, i) Rs. 200/- per Cu.m (upto 4th floor) ii) Rs.250/-(above 4th floor) |
| 19 | PLUMBING WORKS (A)-(II) G.I. PIPE WORKS AND FITTINGS 19(I) Supplying, fitting and fixing PVC pipes of approved make of Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with GI Pipes as per IS : 1239 (Part - I). with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes, making threads,fitting, fixing etc. complete in all respect including cost of all necessary fittings as required,jointing materials and two coats of painting with approved paint in any position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accesories, specials. Payment for painting will be made seperately) (a) For Exposed Work PVC Pipes (Dia) (i)100 mm |
| 20 | Sub Total |
| 21 | GST 18% |
| 22 | CESS 1% Please Enable Macros to View BoQ information |