|
| 1 | Jungle clearance in borrow area, building premises, flanks and slopes on the roads, canals and embankment by removing the grass and the jungle bushes from the top including weeding out shrubs including roots and levelling etc. complete as per direction of E/I. (5.1.3.1 WRD, PART- A 2.02 ) |
| 2 | E/W in excavation in canal by the hydraulic excavator as per designed section in all kinds of soil, soil mixed with kankar, pebbles and boulders upto 300 mm size and disposal of spoil upto 10 m with all lifts all complete as per specification and direction of E/I. (7.1.43.1 WRD) |
| 3 | Earth work in excavation of canal by hydraulic excavator as per designed section in all kinds of soil, soil mixed with kankar, pebbles and boulders upto 300mm size and disposal of spoil upto 500 M with all lifts by tipper including construction and maintenance of haul road all complete as per specification and direction of E/I. (7.1.43.2 WRD) |
| 4 | Use rate of 10 H.P. Diesel Pump set for dewatering. ( PM- 29,PG - 83 WRD ) |
| 5 | Providing designated 75 B one brick flat soling work with designatioin 75B bricks joints filled with local sand . including royalty and all taxes etc. all complete as per specification and direction of E/I. (5.6.3 BCD ) |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size). complete job as per specification and direction of E/l. (5.3.1.2 BCD ) |
| 7 | Earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item -A) and disposal of excavated earth as obtained to a distance upto 50 M. including all lifts, levelling, rammimg the foundation trenches, removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/I. (5.1.1 BCD) |
| 8 | Providing coarse clean local sand in filling in foundation treches including ramming and watering in , royalty and taxes all complete as per approved design, building specification and direction of E/I. (7.1.37 Part B WRD) |
| 9 | Providing designation 75 B brick work in C.M.(1;6) in foundation and plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10 mm thick mortar joints, cost of screening materials, raking out joints to 15 mm depth, curing, taxes and royalty all complete as per approved design, building specification and direction of E/I. (5.2.6. BCD) |
| 10 | Providing 12mm thick cement plaster (1:6) with coarse sand of F.M 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per approved design, building specification and direction of E/I. (5.7.3. + 5.7.11. BCD) |
| 11 | Providing 1.5 mm thick cement punning with curing with clean coarse sand of F.M 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per approved design, building specification and direction of E/I. ( 5.7.11. BCD) |
| 12 | Providing G.I. Pipe (TATA mark or equivalent) do…do….. all complete as per approved design, building specification and direction of E/I. 65mm dia. (M930 k(vi)) PART 1 |
| 13 | Cement - |
| 14 | Sand - |
| 15 | Stone Chips - |
| 16 | Bricks - |
| 17 | Goods & Services Tax (G.S.T.) @ 12% |
| 18 | Labour Cess @ 1% Please Enable Macros to View BoQ information |