| 1 | Cutting down trees including trunks and branches with griths above 30 cm to 60 cm and stacking the materials neatly with all lifts and lead of 1000 m as directed and earth filling in the depression / pit if any. |
| 2 | Removing grass, gazer grass and disposing off out of building premises including making clean the ground by shovel and phavaras etc. complete. |
| 3 | Dismantling stone masonry in lime or cement mortar inCluding stacking the materials as directed with all leads,lifts etc. |
| 4 | Removing pointing and other epoxy-based hard material from joints and surface area of Basalt stone masonary manually with chisel and hammer or with the help of electric grinders wherever directed by Engineer In charge. Proper care should be taken not to damage the stone during removal. |
| 5 | Removing brick bat coba including stacking the spoils as directed with all leads, lifts etc, complete. |
| 6 | Providing and fixing double scaffolding system (cup lock type) on the exterior side of building / structure including additional rows of scaffolding in stepped manner as per requirement of site, made with 40 mm da V placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with MS Tubes MS condition for execution of work of cleaning and/or pointing and/ or applying chemical and removing it the challis, M.S. clamps and staircase system in the scaffolding for working platform etc, and maintaining feasible, for inspection of work at required locations with essential safety features for the workmen etc. compte a scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever it directions and approval of Engineer-in-charge. Note:-(1) The elevational area of the scaffolding shall be meet t payment purpose. (2) The payment will be made once only for execution of all items for such works |
| 7 | Specialised Stone cleaning to remove oil or emulsion paint,stains or dark patches,layers of impervious coatings,cementious layers,rust stains from surface of stone with chemicals ,thinners,solvents or soft teepol type soap solution or by pressure jet machine (As specified by consulting architect),A gentle use of air abrasive tools may be permitted as long as no damage to the original surface is ensured.it may include usage of mechanical tapping ,chemical surfactant or solvant,patent cleaning product or use of pressurised micro abrasive as necessary.test patches would need to be undertaken to asses efficeincy of technique prior to work.Removal to be followed by water washing.The surface shall finally be cleaned by hand rubbing and rinsing with clean water to obtain nearly original surface,colour and texture |
| 8 | Numbering the monument elements in proper order before lowering down with approved colour and shade as directed by Engineer in-charge, including ladder, scaffolding etc.complete |
| 9 | Lowering down carefully existing stone masonry of the monument manually in proper order including shifting the stone elements up to a distance of 50 meter beyond the monument area and stacking them as directed by Engineer in-charge, removing building rubbish and cleaning the site etc. complete . |
| 10 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 0.00 to 1.50 m.) By Manual Means |
| 11 | Providing dry/ trap/ granite/ quartzite/ gneiss rubble stone soling 15 cm to 20 cm thick including hand packing and compacting etC. complete. |
| 12 | Providing and laying cast in situ 1:2:4 Lime Concrete of trap/ granite/ quartzite/ gneiss metal for foundation and bedding as per detailed specifications and drawings or as directed including bailing out water, centring, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required with fine aggregate, preparing the lime mortar in lime miller and then mixing with coursed aggregate in drum mixer as per specifications including bailing out water, watering etc. complete. |
| 13 | Providing Un-coursed Rubble Masonry of trap / granite stones in lime mortar 1:1½, in foundation and plinth as per detailed specifications and drawings or as directed including the stones to be set in the work as received from the quarry, after merely knocking off weak corners and edges with the masons hammer, the stones shall be carefully laid so as to break joints, no joint shall exceed 12.5 mm. (½″) in thickness, every stone shall be set flush in mortar, the face stone shall be for greater size, and good beds, one through stone shall be inserted at least every 0.80 sq. mete (1 square yard), the joints shall be racked out carefully at least 25 mm. (1″) where pointing or plastering to be done, striking joints where no pointing or plastering is to be done, preparing the lime mortar in lime miller, bailing out water, watering and all exposed masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete. |
| 14 | Providing Un-coursed Rubble Masonry of trap / granite stones in lime mortar 1:1½, in superstructure For Filling as per detailed specifications and drawings or as directed including the stones to be set in the work as received from the quarry, after merely knocking off weak corners and edges with the masons hammer, the stones shall be carefully laid so as to break joints, no joint shall exceed 12.5 mm. (½″) in thickness, every stone shall be set flush in mortar, the face stone shall be for greater size, and good beds, one through stone shall be inserted at least every 0.80 sq. mete (1 square yard), the joints shall be racked out carefully at least 25 mm. (1″) where pointing or plastering to be done, striking joints where no pointing or plastering is to be done, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete. |
| 15 | Providing Ashlar Rough-tooled Masonry of trap / granite stones in lime mortar 1:1½with size of stone 90 cm. x 40 cm. x 23 cm. in superstructure as per detailed specifications and drawings or as directed including the stones be of approved quality, colour, hard and free from defect of any kind, he face of stones shall be rough-tooled, rustic (with or without chisel draft, except at quoins), or chamfered as specified, the beds and joints of all ashlar stones to be dressed perfectly true, square and full, headers shall not be less in length than breadth of ashlar stone plus 45 cm. (1ꞌ6″), the stones shall be set in mortar, the beds or joints being in no case more than 3 mm. (⅛″), the stone shall be laid in regular course not less than 30 cm. (12″) in height averaging 4½ c. ft., the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete. |
| 16 | Providing/Re-setting Coursed Rubble Masonry Second Sort of reuse-stones in lime mortar 1:1½, in superstructure as per detailed specifications and drawings or as directed including all stones to be set full in mortar, all side joints shall be vertical and beds horizontal and not joints shall be more than 12.5 mm. (½″), the through stones shall be inserted 5 and 6 feet apart in every course, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete. |
| 17 | Providing Coursed Rubble Masonry Second Sort of trap / granite stones in lime mortar 1:1½, size of stone 45 cm. x 30 cm. x 23 cm. in superstructure as per detailed specifications and drawings or as directed including the stones shall be laid in horizontal course, the face of the stones to be hammered and bushing not to be project more than 3.8 cm. (1½″), all stones to be set full in mortar, all side joints shall be vertical and beds horizontal and not joints shall be more than 12.5 mm. (½″), the through stones shall be inserted 5 and 6 feet apart in every course, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete. |
| 18 | Providing Semi-circular Coping Cut-stone Second Sort, 22.5 cm. (9″) height and 52.5 cm. (1ꞌ9″) wide of trap / granite stones in lime mortar 1:1 with size of stone 0.75m. x 0.55m. x 0.20 m. as per detailed specifications and drawings or as directed including the stones be of approved quality, colour, hard and free from defect of any kind, the stone shall be dressed full or to template, exposed face of the stones shall be fine chisel dressed, semi-circular and all joints shall be in line and close and not more than 3 mm. (⅛″) thick, preparing the lime mortar in lime miller, scaffolding, watering and all coping work when handed over to be perfectly clean and free from all mortar stains etc. complete. |
| 19 | Providing and fixing Stone Paving, Second Sort in lime mortar 1:1½, with size of stone 60 cm. x 45 cm. x 15 cm., as per detailed specifications and drawings or as directed including all stone slabs to of approved quality, hard, even, sound, durable and uniform thickness, the stones to be not finely chisel-dressed on the surface and the course to be of prescribed width, true for top 25 mm. (1″), the joints running true, the stones to be laid with joints not exceeding 8 mm. (5/16″) thick and to be evenly and firmly bedded flush in mortar on the concrete and no hollow left, side to be dressed true and as per shape at least half the depth from the face, preparing the lime mortar in lime miller, watering and all paving work when handed over to be perfectly clean and free from all mortar stains etc. complete. |
| 20 | Providing/Re-setting Ashlar Rough-tooled Stone Steps of reuse-stones in lime mortar 1:1½ as per detailed specifications and drawings or as directed including each stone shall rest at least 3.8 cm. (1½″) on that below it, the beds or joints being in no case more than 3 mm. (⅛″), preparing the lime mortar in lime miller, watering and all steps work when handed over to be perfectly clean and free from all mortar stains etc. complete. |
| 21 | Providing Ashlar Rough-tooled Stone Steps of trap / granite stones in lime mortar 1:1½ with size of stone 60cm. x 40cm. x 21cm. as per detailed specifications and drawings or as directed including the stones be of approved quality, colour, hard and free from defect of any kind, the stones shall be of exact size and shape, the shall be rough-tooled on exposed surface, holes for balusters should be cut in the steps before they are laid, each stone shall rest at least 3.8 cm. (1½″) on that below it, the beds or joints being in no case more than 3 mm. (⅛″), preparing the lime mortar in lime miller, watering and all steps work when handed over to be perfectly clean and free from all mortar stains etc. complete. |
| 22 | Providing Ashlar Rough-tooled Stone Steps of trap / granite stones in lime mortar 1:1½ with size of stone 45cm. x 30cm. x 20cm. as per detailed specifications and drawings or as directed including the stones be of approved quality, colour, hard and free from defect of any kind, the stones shall be of exact size and shape, the shall be rough-tooled on exposed surface, holes for balusters should be cut in the steps before they are laid, each stone shall rest at least 3.8 cm. (1½″) on that below it, the beds or joints being in no case more than 3 mm. (⅛″), preparing the lime mortar in lime miller, watering and all steps work when handed over to be perfectly clean and free from all mortar stains etc. complete. |
| 23 | Providing and laying cast in situ 1:2:4 Lime Concrete of trap/ granite/ quartzite/ gneiss metal for coping or slab as per detailed specifications and drawings or as directed including centring, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required with fine aggregate, preparing the lime mortar in lime miller and then mixing with coursed aggregate in drum mixer, the concrete must be bitten for two days with pouring water, scaffolding, watering and all concrete work when handed over to be perfectly clean and free from all mortar stains, etc. complete. |
| 24 | Providing Lime Pointing to stone work in lime mortar 1:1 in superstructure, as per detailed specifications and drawings or as directed including all face or visible work shall be pointed, unless otherwise specified and shall be done while the mortar is fresh, the mortar shall consists of lime and fine sand shall not be ground fine but sand should be finer, the joints of the pointed work shall be neatly defined by the pointing, the lines shall be regular and uniform in breadth and the joints shall be raised or flat as may directed, preparing the lime mortar with 640 gram pulp of wood apple (Belfruit) per cubic metre of lime mortar as a bonding material, scaffolding, watering and all work when handed over to be perfectly clean and free from all mortar stains etc. complete. |
| 25 | Providing and laying cast in situ 1:1:4 Lime Concrete of broken brick metal for coping or waterproofing as per detailed specifications and drawings or as directed including centring, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required, with fine aggregate, preparing the lime mortar in lime miller and then mixing with coursed aggregate or surkhi in drum mixer, the concrete must be bitten for two days with pouring water as per specifications, scaffolding, watering and all concrete work when handed over to be perfectly clean and free from all mortar stains, etc. complete. |
| 26 | Providing and fixing in position Guard Railling as per Drg. No. 15 Type C dt.20-4-79, with 3rows of 50 mm dia. G.I. pipe 30cm a part and fixed in M.S. channels of section 125 x 65 x 6 mm spaced 2.5 C/c 1:2:4 bedding of size 45 x 30. as per detailed drawing with 3 coats of approved paint including including necessary excavation in any strata. |
| 27 | Providing and grouting with lime and fine screened sand slurry in proporation of (1 : 1) with a proper jet pump pressure including cleaning and washing and packing the existing crack / holes in the brick or stone masnory with lime and finesand paste in proporation of (1:1) properly from down side, filling the slurry in cracks or holes including all necessary actions and required tools and machineries, scaffolding, curing etc. complete. for soil stabilization Non S.S.R. |
| 28 | Disposing of dismantling materials of R.C.C./ stone / brick masonry / derbies, excavated material / soil / murum / rubbish material or vegetation / grass / shrubs etc., from work site beyond the 5km. |
| 29 | Providing and fixing mild steel grill gate with angle iron frame 65mm x 65mm x 10mm with iron bars at 150mm C/C and diagonal flats as per the detailed drawing including hinges, pivot block locking arrangement, welding riveting and oil painting of three coats of approved shade Weight of gate 35 Kilogram/Smt. |
| 30 | Providing Soil Bag Support to the monument with contractor´s soil in proper layers carefully as directed by Engineer in-charge including filling, tying and conveying the bags, removing the soil bags after work up to a distance of 50 meter beyond the monument area and cleaning the site etc. complete. |
| 31 | Supplying and erecting Solar Street Light Non SSR |
| 32 | Public Seating Chair. - 3 Seater Providing and Fixing 3 seater Public seating chair made of complete metal with Legs in Crome finish and seates in silver powder coating finish. |
| 33 | Preparing and carrying out videography, Documentary outdoor and indoor of roads, bridges, other structures and programme, including preliminarys survey, still shots moving shooting, necessary board for video shooting hiring of vehicle, equipment for video shooting, transportation of all equipment, persons, required for shooting, lighting arrangement as may be necessary, editing, mixing, titling, lettering, sounding including cost of coloured cassette of approved quality etc. complete |
| 34 | Preparing and carrying out Shooting of still photographs of Extra copies - 5\\" X 7\\" Size outdoor and indoor of roads, bridges, other structures and programme, including preliminarys survey, still shots moving shooting, necessary board for video shooting hiring of vehicle, equipment for video shooting, transportation of all equipment, persons, required for shooting, lighting arrangement as may be necessary, editing, mixing, titling, lettering, sounding including cost of coloured cassette of approved quality etc. complete |
| 35 | Carrying of detailed topographic survey by using total station along the existing or new road including taking L-section and cross section at every 30 meter ROW ,taking at least 10 spot levels per cross section, picking up all existing details inside the Row like electric telephone line , encroachments, structures etc. connecting all the primary total station control points by G.I.S.Bench marks level or whichever available with department using auto level and preparing Auto CAD plan by using above data taking out 1 set of black and white printout on 50 micron polyster film sheet A2 size and 2 sets of coloured printout on A2 size submitting soft copy all data on CD. Plain Terrain New Alignment |
| 36 | Providing and fixing black stone benches of size 1.80x0.75m with two leg support of thickness 75mm, M20 Concrete with situ finish with backrest to be placed above the platform edjes lines/periphary etc. Complete in all respects as per the Design & Instructions of the Engineer Incharge including all taxes, transportation charges, loading, unloadning etc, complete. Basic Rate (as per market rate) Please Enable Macros to View BoQ information |