| 1 | Overhauling |
| 2 | OD302352/2024-2025:Dismantling the11-30 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint. |
| 3 | OD302350/2024-2025:Dismantling the 31-60 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint. |
| 4 | OD50062/2025-2026:Vacuum Motor pump set up to 5 HP Squirrel cage induction motor with Vacuum pump set, reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , greasing the bearing etc as and when required including overhauling of motor pump transproting to workshop repairs to wornout impeller shaft, pump case, etc. Including lathe works and maintain the motor pump set, base plate, coupling with pump, giving connections to the in position, checking correct alignment, testing and trial run on full load |
| 5 | Lowering |
| 6 | OD302344/2024-2025:" Lowering down and erecting upto 1-3 HP motor/vacuum motor pump set and erecting the motor on the base plate in position giving connections checking correct alignment and trial run on full load" |
| 7 | OD302341/2024-2025:" Lowering down and erecting 5-10 HP motor and erecting the motor on the base plate coupling with pump in position giving connections checking correct alignment and trial run on full load" |
| 8 | OD302340/2024-2025:" Lowering down and erecting 31-60 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load" |
| 9 | OD302343/2024-2025:"Lowering down and erecting 11-30 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load" |
| 10 | Consumables and supplies |
| 11 | OD302358/2024-2025:Supply and providing 7W LED Bulb in the existing fitting etc as required |
| 12 | OD132537/2025-2026: Supply and Installing 20 W LED Tube light Fitting. |
| 13 | OD132262/2025-2026:Replacing the damaged bearing , supply and fixing new ball/Roller bearing , SKF / FAG make as per the direction of departmental staff at site - Bearing No 6310 or its equivalent size |
| 14 | OD132263/2025-2026:Replacing the damaged bearing , supply and fixing new ball/Roller bearing , SKF / FAG make as per the direction of departmental staff at site - Bearing No 6309 or its equivalent size |
| 15 | OD302355/2024-2025:Supply and filling of transformer oil of good quality to the Transformer /starter/ regulator etc as required |
| 16 | OD302353/2024-2025:Supply and providing of LED Indication lamps in panel board-blue colour |
| 17 | OD185559/2025-2026: MCCB AccessoriesSupply and fixing one number earth fault Relay up to 125A to 200A with CBCT. |
| 18 | OD302363/2024-2025: Carrying out control wiring for panel with normal meters and indication lamps for interconnecting the control devices/ equipments including providing suitable size insulated sockets at the termination points or soldered properly, providing numbering ferrules for the proper identification of the wiring, keeping the wiring firm by suitable tie/ tie mounts/ PVC duct etc as required.-1.50 sq mm single run with required sockets. |
| 19 | OD302357/2024-2025:Supply and providing LED indicators for all voltage ranges - Red, Green, Black, Yellow or Orange Colour |
| 20 | OD42417/2025-2026:Supply and renewal of Three Phase Digital Voltmeter accuracy class 1 in panel board after dismantling the damaged one, L&T or Equivalent make. |
| 21 | OD42418/2025-2026:Supply and fixing three phase digital Ammeter accuracy class class 1in exciting panel board |
| 22 | OD42419/2025-2026:Supply and fitting Digital multifunction meter to read VA,PF,KW,KWh, accuracy class-1 LCD |
| 23 | OD302364/2024-2025:Supply & fixing the following Power Capacitors 3 phase delta connected in positon and giving connection 2KVAr, 3 phase, 440 V, delta connected Metalised Poly Propylene Capacitor, Cylinderical Type, suitable for direct connection to motors. |
| 24 | OD50126/2025-2026:Supply & fixing the following Power Capacitors 3 phase delta connected in positon and giving connection.15 KVAr, 3 phase, 440 V, delta connected, standard duty Metalised Poly Propylene Capacitor, Box Type, suitable for direct connection to motors. |
| 25 | OD302366/2024-2025:supply and providing ABRO PUF -750 Multipurpose Expandable PU Foam insulation Sealant Spray. |
| 26 | OD133241/2025-2026:Charges to be paid at kseb actual amount may be reimbursed on production of original documents |
| 27 | OD133243/2025-2026:Charges for preparation of electrical drawing per A3 Sheet first sheet |
| 28 | OD133242/2025-2026:Copying Charges of electrical drawing per A3 Sheet additional Copies |
| 29 | OD135477/2025-2026:Supply and providing Taparia make Combination Plier (210mm)-1no ,insulated screwdriver (250mm)-1no,Line tester(200mm)-1no,Double Ended Spanner Set DEP12 (12 Pcs),6x7, 8x9, 10x11, 12x13, 14x15, 16x17, 18x19, 20x22, 21x23, 24x27, 25x28, 30x32 mm, electrical SafetyRubber hand Gloves-1pair |
| 30 | Pipe works |
| 31 | OD41222/2025-2026:Dismantling the existing MS delivery pipe of size 200mm to 350 mm piece by piece after providing scaffolding supports, with out further damages including MS bent , accessories etc. and stacking at the yard |
| 32 | OD41232/2025-2026:Supply, conveying, erecting, testing and commissioning the 200 mm dia MS pipe in suction/ delivery side having sheet of minimumthickness 6.35 mm and cutting in to required length, facing the cutting edges, painting two coats of synthetic best quality enamel paint over a coats red oxide primer, including conveyance charges to pump house and labour charges for loading, unloading,etc. |
| 33 | OD41270/2025-2026:Supply, fabrication, conveyance, fixing, testing and commissioning of 200 mm size MS pipe bend with 12 mm thick flanges at both end, fabricated from 200 mm MS pipe having 6.35 mm sheet thickness, with length not less than 0.45 meter, painting two coats of synthetic enamel paint over a coat of red oxide primer and fixing in position using fresh rubber packing, gaskit packing, bolts and nuts etc. in correct alignment and leakprooof condition. |
| 34 | OD42273/2025-2026:Supply and providing the rough cut flange ring joint 12 mm thick for 200/250 mm MS pipe after facing the cutting edges of flange rings neatly and set out the flange rings in correct position to both vertical and horizontal planes and welding in two rows accurately, painting two coats of synthetic best quality enamel paint over a coats red oxide primer including fixing the pipe using suitable size nuts and bolts , rubber packing grease etc , in correct alignment and leakproof condition. |
| 35 | OD42272/2025-2026:Charges for dismantling old 250mm NRV on existing MS pipe with out any damages after demolishing existing concrete foundation. |
| 36 | OD50014/2025-2026: Charges for leading the 250 mm non Return Valve & 250mm ms pipe 6mtr from road side to inside pump house ( Aprox. 100 mtr )including carrying using manpower ,rope ,chain ,iron rod, iron pipe,reaper etc.as required with out any damages. |
| 37 | OD42343/2025-2026:Supply and installation NON RETURN VALVE cast Iron double flange as per IS/5312 PN 1.6 rating complete with Bronze body & wedge Stainless Steel spindle, Gland packing, Rubber gasket 250mm dia Non Return Valve |
| 38 | OD42349/2025-2026:Supply, fabrication, conveyance, fixing, testing and commissioning of 250 mm size MS pipe bend with 12 mm thick flanges at both end, fabricated from 250 mm MS pipe having 6.35 mm sheet thickness, with length not less than 0.6 meter, painting two coats of synthetic enamel paint over a coat of red oxide primer and fixing in position using fresh rubber packing, gaskit packing, bolts and nuts etc. in correct alignment and leakprooof condition. |
| 39 | OD42361/2025-2026:Supply, conveying, erecting, testing and commissioning the 250 mm dia MS pipe in suction/ delivery side having sheet of minimum thickness 6.35 mm and cutting in to required length, facing the cutting edges, painting two coats of synthetic best quality enamel paint over a coats red oxide primer, including conveyance charges to pump house and labour charges for loading, unloading,etc. |
| 40 | 14.2:Excavation for cable trenches of depth upto 1.2 m in soft soil including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 metres. |
| 41 | 14.7:Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) in foundation of pump, DG set etc including form work etc as required. |
| 42 | OD50132/2025-2026:Charges for reconditioning damage parts 250mm wheel valve replacing spare with original make including lathwork transportation etc. |
| 43 | AMC of motor pump sets |
| 44 | OD302345/2024-2025:Fully Comprehensive Annual Maintenance of up to 5 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts, replacing spares with original make as per sample, dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, overhauling of the motor, maintenance of motor thorughout the AMC period whenver necessary (excluding rewinding) repairs of vaccum pipe line, starter, valves electrical accessories etc as required complete in good working condition including painting the motor pumpset, base plate all time during the period of contract and the faults should be rectified with in the time allowed |
| 45 | OD302346/2024-2025: Fully Comprehensive Annual Maintenance of 11-30 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed . |
| 46 | OD302348/2024-2025: Fully Comprehensive Annual Maintenance of 31-60 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, reconditioning the slipring unit as required, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, carbon brush and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed . |
| 47 | OD302347/2024-2025: Fully Comprehensive Annual Maintenance of 31-60 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed . |
| 48 | Lifting |
| 49 | OD302339/2024-2025: Lifting the upto 1-3 HP motor after disconnecting the wire connection, detaching from the base plate, starters, TP switches etc. and placing them conveniently on the platform. |
| 50 | OD302337/2024-2025: Lifting the 5-10 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. and placing them conveniently on the platform. |
| 51 | OD302335/2024-2025: Lifting the 11-30 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. and placing them conveniently on the platform. |
| 52 | OD302338/2024-2025: Lifting the 31-60 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. and placing them conveniently on the platform. Please Enable Macros to View BoQ information |