| 1 | Overhauling |
| 2 | OD299128/2024-2025:Dismantling the11-30 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint. |
| 3 | OD299129/2024-2025:Dismantling the 31-60 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint. |
| 4 | OD299130/2024-2025:Dismantling the 61-110 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint. |
| 5 | OD134624/2025-2026:Dismantling the above110 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint. |
| 6 | Lowering |
| 7 | OD299100/2024-2025:" Lowering down and erecting upto 1-3 HP motor/vacuum motor pump set and erecting the motor on the base plate in position giving connections checking correct alignment and trial run on full load" |
| 8 | OD299099/2024-2025:" Lowering down and erecting 5-10 HP motor and erecting the motor on the base plate coupling with pump in position giving connections checking correct alignment and trial run on full load" |
| 9 | OD299098/2024-2025:"Lowering down and erecting 11-30 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load" |
| 10 | OD299101/2024-2025:" Lowering down and erecting 31-60 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load" |
| 11 | OD299097/2024-2025: Lowering down and erecting 61-110 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load |
| 12 | OD134887/2025-2026:Lowering down and erecting above 110 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load |
| 13 | Consumables and supplies |
| 14 | OD299113/2024-2025:Supply and Installing 20 W LED Tube light Fitting. |
| 15 | OD135401/2025-2026:Carrying out control wiring for panel with normal meters and indication lamps for interconnecting the control devices/ equipments including providing suitable size |
| 16 | OD134929/2025-2026:Replacing the damaged bearing , supply and fixing new ball/Roller bearing , SKF / FAG make as per the direction of departmental staff at site - Bearing No 6310 or its equivalent size |
| 17 | OD185276/2025-2026:Replacing the damaged bearing , supply and fixing new ball/Roller bearing , SKF / FAG make as per the direction of departmental staff at site - Bearing No 6314 or its equivalent size |
| 18 | OD139975/2025-2026:Replacing the damaged bearing , supply and fixing new ball/Roller bearing , SKF / FAG make as per the direction of departmental staff at site - Bearing No 6309 or its equivalent size |
| 19 | OD299111/2024-2025:Supply and providing 7W LED Bulb in the existing fitting etc as required |
| 20 | OD299125/2024-2025:Supply & fixing the following Power Capacitors 3 phase delta connected in positon and giving connection 15 KVAr, 3 phase, 440 V, delta connected Metalised Poly Propylene Capacitor, Cylinderical Type, suitable for direct connection to motors. |
| 21 | OD299126/2024-2025:Supply & fixing the following Power Capacitors 3 phase delta connected in positon and giving connection 2KVAr, 3 phase, 440 V, delta connected Metalised Poly Propylene Capacitor, Cylinderical Type, suitable for direct connection to motors. |
| 22 | OD299112/2024-2025:Supply and filling of transformer oil of good quality to the Transformer /starter/ regulator etc as required |
| 23 | OD299110/2024-2025:Supply and providing of LED Indication lamps in panel board-blue colour |
| 24 | OD299108/2024-2025:Supply and providing LED indicators for all voltage ranges - Red, Green, Black, Yellow or Orange Colour |
| 25 | OD299118/2024-2025:supply and providing ABRO PUF -750 Multipurpose Expandable PU Foam insulation Sealant Spray. |
| 26 | OD299127/2024-2025:Supply and renewal of Multifunction meter to read: V, A, F, 3 phase accuracy class 1 in panel board after dismantling the damaged one, L&T or Equivalent make. |
| 27 | OD51899/2025-2026:Supply and fitting Three Phase Ammeter accuracy class 1 |
| 28 | OD51900/2025-2026:Supply and fitting Three Phase Voltmeter accuracy class 1 |
| 29 | OD185273/2025-2026: MCCB AccessoriesSupply and fixing one number earth fault Relay up to 125A to 200A with CBCT. |
| 30 | OD52190/2025-2026:Supply, conveying, erecting, testing and commissioning the 300 mm dia MS pipe in suction/ delivery side having sheet of minimum thickness 6.35 mm and cutting in to required length, facing the cutting edges, painting two coats of synthetic best quality enamel paint over a coats red oxide primer, including conveyance charges to pump house and labor charges for loading, unloading etc. |
| 31 | OD52191/2025-2026:Supply, fabrication, conveyance, fixing, testing and commissioning of 300 mm size MS pipe bend with 12 mm thick flanges at both end, fabricated from 300 mm MS pipe having 6.35 mm sheet thickness, with length not less than 0.45 meter, painting two coats of synthetic enamel paint over a coat of red oxide primer and fixing in position using fresh rubber packing, gasket packing, bolts and nuts etc. in correct alignment and leak proof condition. |
| 32 | OD52219/2025-2026:Charges for dismantling 50HP vertical Propeller motor pump set from existing foundation and separating motor and pump set, after dismantling column pipe and delivery pipe. Then dismantling the impeller shaft assembly, removing foreign body, repacing the wornout bushes, cleaning and greasing the thrust bearing/bush, correcting the seating, resetting impeller shaft assembly, refitting in position in correct alignment, refitting motor in position checking and correcting alignment, refitting the delivery pipelines in correct position, giving wire connection to the motor, conducting trial run with full load etc. as per the direction of the departmental officer etc. |
| 33 | OD135044/2025-2026:Charges to be paid at electrical kseb actual amount may be reimbursed on production of original documents |
| 34 | OD135045/2025-2026:Copying Charges of electrical drawing per A3 Sheet additional Copies |
| 35 | OD135046/2025-2026:Charges for preparation of electrical drawing per A3 Sheet first sheet |
| 36 | OD135704/2025-2026:Supply and providing Taparia make Combination Plier (210mm)-1no ,insulated screwdriver (250mm)-1no,Line tester(200mm)-1no,Double Ended Spanner Set DEP12 (12 Pcs),6x7, 8x9, 10x11, 12x13, 14x15, 16x17, 18x19, 20x22, 21x23, 24x27, 25x28, 30x32 mm, electrical SafetyRubber hand Gloves-1pair |
| 37 | AMC of motor pump sets |
| 38 | OD299102/2024-2025:Fully Comprehensive Annual Maintenance of upto 5 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts, replacing spares with original make as per sample, dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, overhauling of the motor, maintenance of motor thorughout the AMC period whenver necessary (excluding rewinding) repairs of vaccum pipe line, starter, valves electrical accessories etc as required complete in good working condition including painting the motor pumpset, base plate all time during the period of contract and the faults should be rectified with in the time allowed |
| 39 | OD299104/2024-2025: Fully Comprehensive Annual Maintenance of 11-30 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed . |
| 40 | OD299105/2024-2025: Fully Comprehensive Annual Maintenance of 11-30 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, reconditioning the slipring unit as required, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, carbon brush and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed . |
| 41 | OD299103/2024-2025: Fully Comprehensive Annual Maintenance of 31-60 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed . |
| 42 | OD133515/2025-2026:Fully Comprehensive Annual Maintenance of 31-60 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, reconditioning the slipring unit as required, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, carbon brush and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed . |
| 43 | OD299106/2024-2025: Fully Comprehensive Annual Maintenance of 61-110 HP squirrel cage induction motor with split case / End suction pump set , controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs , overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, base plate, pumpset and maintain the motor pump sets electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed . |
| 44 | OD133703/2025-2026:Fully Comprehensive Annual Maintenance of 61-110 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, reconditioning the slipring unit as required, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, carbon brush and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed . |
| 45 | OD134060/2025-2026:Fully Comprehensive Annual Maintenance of above 110 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, reconditioning the slipring unit as required, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, carbon brush and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed . |
| 46 | Lifting |
| 47 | OD299096/2024-2025: Lifting the upto 1-3 HP motor after disconnecting the wire connection, detaching from the base plate, starters, TP switches etc. and placing them conveniently on the platform. |
| 48 | OD299095/2024-2025: Lifting the 5-10 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. and placing them conveniently on the platform. |
| 49 | OD299094/2024-2025: Lifting the 11-30 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. and placing them conveniently on the platform. |
| 50 | OD299093/2024-2025: Lifting the 31-60 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. and placing them conveniently on the platform. |
| 51 | OD299092/2024-2025:Lifting the 61-110 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. and placing them conveniently on the platform. |
| 52 | OD134911/2025-2026:Lifting the above 110 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. and placing them conveniently on the platform. Please Enable Macros to View BoQ information |