| 1 | Additional rate for providing one discset, PG clamp etc. complete, on any typeof HT pole for making cut point. |
| 2 | Stringing of one km 11kV line withACSR Raccoon (3 conductors) afterfitting insulators and giving jumperconnections including cutting andremoving tree branches wherevernecessary excluding cut point works. |
| 3 | Fitting and erecting one HT A typeSingle Pole in position, including fittingcross arm, digging and back filling pit inordinary soil (as per standards), drawingsufficient length of GI earthing leadsfrom F clamp through V cross arm to theground for earthing (excluding provisionof earthing). |
| 4 | Labour charges for loading HT A typepole from the stacking place andunloading the same at work site(transportation by any vehicle). |
| 5 | Fitting one Additional 75x40mm, 1.8mChannel cross arm in existing single poleincluding conveyance of materials. |
| 6 | Drilling hole of various sizes on existingChannel/Cross Arm. |
| 7 | Cutting trees having girth beyond 120cmbut upto and including 180cm (fellingtrees including cutting of trunks andbranches) and removing the rootcompletely and stacking etc. 1 No. |
| 8 | Cutting trees having girth beyond 60cmbut upto and including 120cm, inbetween the line and Buildings wherespace for falling trees is notavailable/enough (felling trees includingcutting of trunks and branches) andremoving the root completely andstacking etc. 1 No. |
| 9 | Cutting trees having girth beyond 60cm but upto and including 120cm (fellingtrees including cutting of trunks andbranches) and removing the rootcompletely and stacking etc. 1 No. |
| 10 | Cutting trees having girth beyond 30cmbut upto and including 60cm (fellingtrees including cutting of trunks andbranches) and removing the rootcompletely and stacking etc. 1 No. |
| 11 | Providing one Coil Earth using No.8 GIearth wire (50mm dia, 115 turns)including digging separate pit(0.45x0.45x1.5m) at standard distanceaway from the pole/structure in ordinarysoil & backfilling. |
| 12 | Providing one Driven Earth using GIearth pipe of size 38.1mm dia, 2.5mlength at minimum distance of 1.5maway from the pole/structure andmaintaining standard distance betweendifferent earth pipes in loose soil. |
| 13 | Providing one Earth using GI earth pipeof size 38.1mm dia, 2.5m lengthincluding digging separate pit(0.45x0.45x2.5m) at a minimumdistance of 1.5m away from thepole/structure and maintaining standarddistance between different earth pipes inordinary soil & backfilling. |
| 14 | Transporting poles by hired vehicle to adistance upto 5km and carrying upto 4numbers of poles excluding loading&unloading charges. |
| 15 | Fitting and providing one HT Stay for11kV pole, including digging and backfilling pit in ordinary soil. |
| 16 | Dismantling (without damage) one LTPSC/RCC pole after disconnecting stays,strut etc. attached thereon and stackingthe same. |
| 17 | Transferring LT three phase 4/5 wire OHline to newly erected HT/LT poleincluding dismantling existing cross armand insulators, refitting the same on thenew pole, binding etc. complete. |
| 18 | Disconnecting and lowering down thesingle phase WP service connection withguy wire from the OH line andreconnecting the same after completingthe line work. |
| 19 | Reshackling one span LT single phase 2wire OH line including pin binding,jumpering, replacing insulators/cross arms/shackle, tightening stay, cuttingtree branches etc. wherever necessaryincluding conveyance of all materials. |
| 20 | Reshackling one span LT three phase 4wire OH line including pin binding,jumpering, replacing insulators/crossarms/shackle, tightening stay, cuttingtree branches etc. wherever necessaryincluding conveyance of all materials |
| 21 | Dismantling one ordinary streetlight/CFL/LED fitting from existing poleand refitting the same on newly erectedpole including disconnecting andreconnecting wires. |
| 22 | Disconnecting and lowering down thethree phase WP service connection withguy wire from the OH line andreconnecting the same after completingthe line work. |
| 23 | Providing concrete muffing of size0.45x0. 45x1.5m (0.5m above GL and1m below GL). Excavation0.45x0.45x1m, concrete (1:3:6, 20mm)0.45x0.45x1.5m, Plastering (1:3) 12mm0.45x0.45mx5sides. |
| 24 | Labour charges for loading HT PSC polefrom the stacking place and unloadingthe same at work site (transportation byany vehicle). |
| 25 | Fitting and providing one HT Fly stayfor 11kV pole using HT PSC poleincluding digging and back filling pits inordinary soil, drawing sufficient lengthof GI earth leads to the ground forearthing (excluding provision ofearthing). |
| 26 | Providing Fly stay for LT pole using LTPSC pole including digging and backfilling pit in ordinary soil. |
| 27 | Providing Strut using LT PSC poleincluding digging and back filling pit inordinary soil. |
| 28 | Fitting and providing one Strut using HTPSC pole including digging and backfilling pit in ordinary soil. |
| 29 | Dismantling (without damage) one 11kVPSC/RCC pole after disconnecting stays,strut etc. attached thereon and stackingthe same. |
| 30 | Labour charges for loading LT PSC polefrom the stacking place and unloadingthe same at work site (transportation byany vehicle). |
| 31 | Fitting and erecting one HT PSC SinglePole in position, including fitting crossarm, digging and back filling pit inordinary soil (as per standards), drawingsufficient length of GI earthing leadsfrom F clamp through V cross arm to theground for earthing (excluding provisionof earthing). |
| 32 | Fitting one set AB switch on existingDP, giving connection and drawingsufficient length of GI earthing leads tothe ground for earthing, excludingprovision of earthing. |
| 33 | Fitting and erecting one HT Double PoleStructure using PSC pole in positionincluding fitting 2 channel cross arms,digging and back filling pit in ordinarysoil, drawing sufficient length of GIearthing leads through all cross arms tothe ground for earthing (excludingprovision of earthing). |
| 34 | Fitting one Additional 2.4/3m Channelcross arm (75x40x6mm), in existing11kV DP including conveyance ofmaterials. Please Enable Macros to View BoQ information |