|
| 1 | Earth work in aviation in tranches for foundation pipes cable etc ordinary soll (lcan stay of sand) Including lift upto 1.5 m. lead upta 50 m and dressing of sides and ramming of bottom and disposal of surplus excavelion earth as directed by the Engineer incharge with a lead of 50 m. (As per 5.1 no.01,sch 251 of SOR) foundation |
| 2 | Providing and laying in cement concrete 1:4:8 Icement: 4 fine sand graded brick aggregate 40mm nominal size and curing comlete, including cost of Formwork in foundation. (As per 5.1 mm.3,ach 275 of 30R) |
| 3 | Rc.c. Feeting work with cement approved coarse sand and 2 cm gauge approved stone ballast in the propertion 1:2:4 in R.c.c. chuding supply of reinforcement (As per 5.1 no.14,sch 288 of SOR) |
| 4 | RC.C. column in 1:2:4 in cament coarse sand and 20mm gauge grit stone ballast prepared subgrade complete in all. (As per S.1 no.9,sch 283 chap 5) |
| 5 | Mild steel or iron such as in all ric.c. work Including benefit for proper completion of work and Including supply of all metarlais and labour etc. complete in all.(As per 5.1 no.3,sch 504 of 50R) |
| 6 | 12mm thick cement Plaster with cament mortar in proportion of 1:4 cement and fine sand in single coat on fair side of single or half brick wall for interior plastering including arises, Interlor rounded angles chamfers and of rounded angles not exceeding 80 min in grit and finished even and smooth. (As per 5.1 no.2,sch 13.4 of SON) |
| 7 | M.S. or iron work in angle Iron gete and railling frame Inculuding cutting weiding & wastage inculiding supply of all material labour T&P etc required for proper completion work (as per S.l no 1 seh, 502 SOR) |
| 8 | Finishing walls with premium Acrylic smooth exterior sion paint with silicon additives of required shade work (Two or more coats applied @ 1.25 tr/10 naver and Including priming coat of exterior primer led (As per 5.1 no.35 chapter no.15 of SOR) |
| 9 | Residing and fixing stainless steel (Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c thing the ralling with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer In-charge, (for payment purpose only weight of stainless steel members shall be considered excluding fiing accessories such as nuts, bolts, fasteners etc.) (Chapter 10 SL no 18 of SOR) |
| 10 | Providing & fixing UV stabilised fiberglass reinforced plastic sheet roofing up to any pitch, Including fixing with polymer coated ' or 'L' hooks, bolts & nuts amm dla. G.1 plain/bitumen washers complete but excluding the cost of purlins, rafters, trusses etc. The sheets shall be manufactured out of 2400 TEX panel rovigs incorporating minimum 0.3% ultra-violet stabiliser in resin system under approximately 2400 psl and hot cured. They shall be of uniform pigmentation and thickness without air pockets and shall conform to 15 10192 and IS 12866. The sheets shall be opaque or translucent, clear or pigmented, textured or smooth as specified 2 mm thick corrugated (2.5\\" or 4.2 or 6\\") or step-down (2 or 3 or 6\\") as specified. (Chapter 12 S.L no 6 of SOR) |
| 11 | Painting and varnishing new work in small areas of iron or wood work with ane coat (upto one sq. mtr. 1 of ready mixed priming paint and one coat of approved superior quality ready morad paint or varnish including supply of all materials, labour, T&P atc, required for proper completion of work, paint to be used should confirm the 1.S.I no. 103 1950. (Chap-15 5.L.no.6. Please Enable Macros to View BoQ information |