| 1 | Earth work in excavation of foundation in hard soil within the initial lead and lift including dressing and levelling the bed and depositing the excavated materials away from the work site etc. all complete as directed by the Engineer-in-charge. |
| 2 | Filling foundation and plinth with sand well watered and rammed including all cost, carriage, royality, taxes if any and all labour, T & P etc. all complete as per PW spesification & direction of Engineer-in- charge. |
| 3 | Cement concrete (1:4:8) using 40mm and down gradedhard granite crusher broken metal including all cost , carriage, royality, taxes if any, and all labour involved for completion of item of work as per PW Specification & direction of Engineer- in - charge. |
| 4 | Fly Ash Brick masonry in cement (1:6) in foundation & plinth of brick size 25cmx12cmx8cm having crushing strength not less than 75 kg/cm2 including all cost ,Labour T&P, carriage, royality, taxes if any, all complete as per PW Specification & direction of Engineer- in - charge. |
| 5 | Fly Ash Brick masonry in cement (1:6) in superstructure of brick size 25cmx12cmx8cm having crushing strength not less than 75 kg/cm2 including all cost ,Labour T&P, carriage, royality, taxes if any, all complete as per PW Specification & direction of Engineer- in - charge. GROUND FLOOR |
| 6 | Providing RCC M20 grade concrete ,lifting hoisting and lying asper approved drawing and design,specification using 20mm & down graded CBHG chips including centering and shuttering ,cost, conveyance,labour,t&p,cess,taxes if any etc all complete as per PW specification and direction of Er in Charge.i- Ground Floor a ) Column base |
| 7 | b) Plinth Bend |
| 8 | Column & Roof Beam |
| 9 | d) Lintel |
| 10 | e) Chajja |
| 11 | f) Roof slab |
| 12 | Straightning, cutting ,bending, binding MS rod (confirming to Fe:415,Fe :500 of IS;1786 )tying and placing in position Including cost of binding wire 18 to 20 gauge and cost & conveyance MS rod etc all complete as per design, specification and dirction of Er-in Charge.i- Ground Floor |
| 13 | Filling F & P with excavated material morrum including watering and ramming as per direction of Er in Charge. complete.Ground Floor |
| 14 | 6 mm thick C.P in cement mortor (1:4) including close deep cheeping to the ceiling of the roof including watering & curing with cost & conveyance of all materials & labour with T & P required for the work with all taxes, royalties etc. complete asper PW specification & direction of Er in Charge.i- Ground Floor |
| 15 | 16 mm thick cement plaster in cm (1:6) over brick masonary finished smooth after to inside portion after racking out joints to 12 mm deep including watering & curing,cost & conveyance of all materials & labour with T & P required for the work with all taxes, royalties etc. complete as per PW specification and direction of Er in Charge. etc complete.Ground Floor |
| 16 | 12 mm thick C.P in cement mortor (1:6) finished smooth over brick walls of outside surface after racking out the joints including watering & curing , cost & conveyance of all materials & labour with T & P required for the work with all taxes, royalties etc. complete as per PW specification and direction of Er in Charge.i- Ground Floor Please Enable Macros to View BoQ information |