| 1 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed in : |
| 2 | All kinds of soil |
| 3 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. |
| 4 | All kinds of soil |
| 5 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. |
| 6 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: |
| 7 | All works upto plinth level |
| 8 | Laterite masonry in neatly dressed stones of size as specified in cement mortar 1: 4 (1 cement : 4 coarse sand) in foundation and basement. |
| 9 | Refilling the pipeline/foundation trenches plinth sides, foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50M andall lifts and disposal of surplus earth as directed by Engineer in Charge. |
| 10 | Supplying and filling in plinth under floors, trenches including watering ramming consolidating, dressing, complete. |
| 11 | moorum |
| 12 | Precast plain cement chequered tiles 22 mm thick of required shades laid in floors, treads of steps and landing on 20 mm thick bed of Cementmortar 1:4 (1cement:4 coarsesand)jointedwith neatcement slurry mixed with pigment to match the shade of tiles including rubbing and cleaning etc. complete. |
| 13 | Dark shades using ordinary cement |
| 14 | Providing and laying 20mm thick cuddapah in shelves over 20 mm thick base of cement mortar 1:3 complete |
| 15 | Kotah stone slab flooring over 20 mm (average) thick base laid over & jointed with grey cement slurry mixed with pigment to match the shade of the slab including rubbing & complete with base of cement mortar 1:4 (1 cement : 4 coarse sand) |
| 16 | 20 mm thick |
| 17 | Providing and fixing Granite stone slabs (mirror polished) 18mm thick in risers of steps, skirting, dado and pillars laid on cement paste and jointed with grey cement slurry mixed with pigment to match the shade of the slabs, including rubbing and polishing complete |
| 18 | Cherry Red |
| 19 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) (Square Hollow Section (SHS) IS4923 /Rectangular Hollow Section (RHS) IS4923/ Circular Hollow Section (CHS) IS1161 closed Structural Steel of (SAIL, TATA. VIZAG, JSW ,APOLLO Steel Ltd.) make (Min Yeild Stress 310 Mpa)) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. |
| 20 | Providing and fixing Colouron Plus galvulium roofing Sheets of 0.5mm thick double ribbed trapezoidal profile coated 1080mm with cover width of 1020mm including all the accessories (JSW or equivalent make) but excluding the cost of purlins, rafters, trusses, flashings etc. complete as per the directions of the Engineer in charge. |
| 21 | Add for providing & fixing Flashings -[Corners, Ridges, valleys, gable end & Trims] (Girth upto 610mm) including all the accessories complete as per the directions of the Engineer in charge. |
| 22 | Providing and fixing Prince or equivalent make PVC SWR half round eaves gutter with bolts, nuts and flat iron brackets 40 x 3 mm size complete. |
| 23 | 250 mm nominal size |
| 24 | Providing & fixing 20 mm caves barge boards 2nd class matti wood |
| 25 | 18mm cement plaster in two coats under layer 12mm thick cement plaster 1:5 ( 1 cement : 5 coarse sand) and top layer 6mm thick with cement plaster 1: 3 (1 cement : 3 coarse sand) finished with sponge. |
| 26 | Painting three or more coats with acryllic exterior paint of approved brand and manufacture (such as weather shield,APEX) including applying one coat of cement primer and one coat of surface treatment etc. complete. |
| 27 | Painting two or more coats (excluding priming coat) with superior quality ready mixed paint for steel work of approved brand & manufacture in all shades on new work to give an even shade. |
| 28 | Providing and fixing rigid PVC S.W.R. (soil, waste & rain water drainage pipes of approved including lubricant etc. complete (single/double) socketed: |
| 29 | 110 mm dia |
| 30 | Providing and fixing prefabricated compound gate of G.I.pipes 40 –50 mm dia (medium) with 12mm M.S. square bars of G.I. pipes grill work as per drawing including providing & fixing locking arrangements, pintals, hold fast embedded in cement concrete 1:2:4 (1 cement: 2 coarse sand : 4 granitic or basaltic aggreate 20mm nominal size) including applying priming coat with ready mixed red lead paint and painting 2 or more coats with superior ready mixed paint of approved brand and manufacture in all shades as per direction complete. |
| 31 | Lettering with black japan paint of approved brand and manufacture |
| 32 | Providing and fixing stainless steel (Grade 304) railing made of Hollow tubes, channels, plates etc.with hairline finish, including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer, ( for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.). |
| 33 | Utility charges ( water & electricity connections) as directed by Engineer in charge. Please Enable Macros to View BoQ information |