| 1 | PA Booster Amplifier-480W |
| 2 | Wall Speaker-30W |
| 3 | Cordless mic UHF |
| 4 | 2 core 1.5 sqmm Shielded copper speaker wire |
| 5 | Supply of One No of 3 mtr X 60.3 mm OD X 3.65mm Thick Street Lamp Post (For Post Top Lantern Fitting, 2 Core SMC Fuse Box With Hot Dip Zinc Galvanising) |
| 6 | Cost of Erection & Materials Required For 3 mtr Garden Lamp Pole With Brackets Conventional Foundation(Material Ratio - 1:1.5:3) |
| 7 | Laying of cable along road / street through 50mm OD, HDPE pipe (trench size 45cm width x 75 cm depth) |
| 8 | HDPE PIPE OF SIZE 50 MM O.D X 38MM I.D |
| 9 | Wiring with 2 x 4 sq.mm. PVC insulated SC unsheathed FRLS copper conductor cable of 1100V grade in suitable PVC rigid pipe on wall and ceiling with PVC accessories with 150mm x 100mm x 113mm TW switch box in flush with wall with 3mm thick hylem sheet cover for 15A 3 pin flush type non inter locking wall socket with 15A flush type switch with painting of suitable colour with continuous earth wire connection of 4 sq.mm copper wire for open PVC power plug point |
| 10 | Supply and Installation of 100KVA Diesel Generator Set with acoustic enclosure conforming to CPCB IV+ Norms and BIS Specifications with AMF panel |
| 11 | I.SI.MARKED 31/2X70 SQ.MM CABLE |
| 12 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.- Upto 2.40m Footing Depth. (including Refilling charges) |
| 13 | Plain Cement Concrete 1:2:4 (one cement, two crushed stone sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.-Mixing by mechanical means |
| 14 | Supplying and erecting centering for plane surfaces such as RCC Floor/Roof Beam, Lintels, Cantilever Beams, Bed Blocks etc.. with necessary supports and strutting above 3.60m upto 4.90m height in all floors with all cross bracings using MS Sheets made of 10 gauge thick welded with MS angle of Size 25mm x 25mm x 3mm for boarding laid over Steel adjustable Span of Size 2m x 2m (expandable upto 3.60m) and Silver Oak Joists of Size 10 x 5 cm spaced at 50cm to 60cm c/c and supported by Steel Adjustable Telescopic Props of Size 2.40 x 3.0m (expandable upto 4.90m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick) Spaced at not more than 50 to 60cm c/c and with Cross bracings provided at two levels at a spacing of 1.80m etc complete complying with standard specifications. Steel adjustable span and Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid).BEAM |
| 15 | Providing and laying in position, Standardised Concrete Mix M-25 Grade using In-situ Concrete batching plant/ Ready Mix Concrete (RMC) adopting weigh batch method in accordance with IS:456-2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 350 kg/m3 and maximum water cement ratio of 0.50, including admixture (plasticiser / superplasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5.0 Cu.m) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 Cu.m) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m’) 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including Conveyance of concrete from batching plant to Work site, Electricity charges and other works & labour cost involved for concrete production, laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. (No separate payment will be made by the Department for the excess usage of materials). |
| 16 | Galvalume Colour Sheet of size 0.47mm |
| 17 | Supplying and erecting in position LIGHT DUTY STE... CYCLE STAND, PARKING GARAGE, TEMPORARY ENCLOSERS Please Enable Macros to View BoQ information |