|
| 1 | Transporting LT ABC by hired vehicle to a distance up to 5km and carrying up to 2 drum including loading & unloading using crane |
| 2 | Providing one Earth using earth pipeof size 38.1mm dia 2.5m length including digging separate pit at a minimum distance of 1.5 m away from the pole/structure and maintaining standard distance between different earth pipes in ordinary soil and backfilling |
| 3 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11KV DP incl. conveyance of materials. |
| 4 | Transporting poles by hired vehicle to a distance up to 5km and carrying up to 4 poles excluding loading & unloading |
| 5 | Dismantling one ordinary street light /CFL/LED fitting from the existing pole and refitting the same on newly erected pole including disconnecting and reconnecting wires |
| 6 | Conveyance of 11 kV line materials from section store /stacking place to the work site (excluding poles) |
| 7 | Fitting one Additional 75x40mm, 1.8m channel cross arm in existing single pole incl. conveyance of materials |
| 8 | Additional rate for excavation of one earth pit (2.5m depth) in laterite |
| 9 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 10 | Fitting and erecting one HT DP using PSC pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing sufficient length of GI earthing leads through all cross arms to ground for earthing (excluding provision of earthing) |
| 11 | Renewal of existing damaged/broken old 11 kV stay to the existing stay rod |
| 12 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 13 | Fitting and providing one HT stay for 11KV pole incl. digging and back filling pit in ordinary soil |
| 14 | Providing one Coil Earth using No8 GI earth wire (50 mm dia,115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling |
| 15 | Fitting one set AB switch on existing DP giving connection and drawing sufficient length of GI earthing leads to the ground for earthing excluding provision for earthing |
| 16 | Dismantling (without damage) one km 11 kV line (three conductors) including dismantling cross arm,insulators,disc disconnecting jumper connection,rolling the conductor and stacking the materials |
| 17 | Additional rate for refitting/redoing one shackle set including re shackling one span while renewing any type of LT pole |
| 18 | Fitting and providing one strut using HT PSC pole incl. digging and back filling pit in ordinary soil |
| 19 | Stringing one km 3 PH 11 kV line with XLPE Insulated ACSR Racoon or equivalant (3 conductors) after fitting insulators,binding conductors to pin insulators using suitable tie and anchoring with wedge type anchoring clamps including cutting and cremoving tree branches whereever necessary excluding cut point works |
| 20 | Dismantling and lowering down the Single phase WP service connection with guy wire from the OH line incl. reconnecting the same after completing the line work |
| 21 | Dismantling and lowering down the three phase WP service connection with guy wire from the OH line incl. reconnecting the same after completing the line work |
| 22 | Providing bridging at cut points for 3 PH 11 kV line with XLPE Insulated ACSR Racoon or equivalant ( 1 conductors) using IPC and respective conductors |
| 23 | Straightening one slanted 11 kV pole after unbinding the line and binding the line after work |
| 24 | Straightening one slanted 11 kV Cut pole after lowering down the existing line and stringing the line after work |
| 25 | Transferring LT 3 ph 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators refitting the same on the new pole,binding etc complete |
| 26 | Dismantling (without damage) LT stay including digging pit in all classes of soil and backfilling |
| 27 | Additional rate for providing one disc set,PG clamp etc complete on any type of HT pole for making cut point |
| 28 | Fitting and erecting one HT PSC type pole in position incl. fitting cross arm, digging & back filling pit in ordinary soil(as per standards) , drawing sufficient length of GI earthing leads from F clamp through V cross arm to ground for earthing (excluding provision of earthing) |
| 29 | Fitting and erecting one HT A type pole in position incl. fitting cross arm,digging & back filling pit in ordinary soil(as per standards) , drawing sufficient length of GI earthing leads from F clamp through V cross arm to ground for earthing (excluding provision for earthing) |
| 30 | Fitting and providing one HT Fly stay for 11KV Pole using HT PSC pole incl. digging and back filling pit in ordinary soil drawing sufficient length of GI earth leads to the ground for earthing (excluding provision for earthing) |
| 31 | Dismantling (without damage) one 11 kV PSC/RCC pole after disconnecting stays,strut etc attached thereon and stacking the same |
| 32 | Pole numbering using printed Aluminium sheets of 22 SWG having size 20x12 cm or Painting the surface of line supports where numbers are to be inscribed .Pole numbers shall be painted in circular/rectangular background using approved quality anti algal yellow paint in two coat after scrapping and cleaning the surface at a height of 2.5m above ground level.The number and letters should be in black synthetic enamel paint.The size of the number should be atleast 2 cm in height x 1.5 cm in width including cost of paint |
| 33 | Providing concrete muffing (0.45x0.45x1.5m) ( 0.5m above GL and 1m below GL).Excavation 0.45x0.45x1m concrete (1:3:6 20mm) 0.45x0.45x1.5m.Plastering (1:3) 12mm 0.45mx0.45mx 5 sides |
| 34 | Dismantling ( without damage ) one LT PSC/RCC pole after disconnecting stays, strut etc.attached thereon and stacking the same |
| 35 | Dismantling one damaged one LT PSC/RCC pole after disconnecting stays, strut etc.attached thereon and stacking the sameand stacking the same Please Enable Macros to View BoQ information |