| 1 | Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Cha. (a) Depth of excavation not exceeding 1500 mm |
| 2 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work)(a) With earth obtained from excavation of foundation |
| 3 | Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as perdirection of Engineer in charge |
| 4 | Labour for laying 150mm to 200 mm boulder soling including rough dressing hard packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth. |
| 5 | Cement concrete with 30mm down graded shibgles excluding shuttering with NB variety stines metal 1:3:6 proportion. |
| 6 | Ordinary cement concrete (mix 1:1.5:3) with graded stone chips (20mm nominal size) excluding shuttering and reinforcement if any, in Ground Floor as per revelent IS codes .ii ) River bazree (1:1.5:3) |
| 7 | Ordinary cement concrete (mix 1:2:4) with graded stone chips (20mm nominal size) excluding shuttering and reinforcement if any, in Ground Floor as per revelent IS codes .ii ) River bazree (1:2:4) |
| 8 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting o requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawingand direction. |
| 9 | Rubble masonry in cement (1:6) with hard dressed stones from approved quarries and clean, coarse and washed sand including carriage of all materials to site (a) In Road and Jhora Work |
| 10 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out aftercompletion of works (upto roof of ground floor) (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge. |
| 11 | © Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work |
| 12 | M.S. structural works in roof trusses with tubular sectionsconforming to IS: 806-1968 & IS: 1161- 1998 cnnected to oneanother with bracket, gusset cleats as per design, direction ofEngineer-in-charge complete including cutting to requisite size,fabrication with necessary metal arc welding conforming to IS: 816- 1969 & IS: 9595 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour reqired for the work including all incidental chages such as electricity charges, labour insurance charges etc.i) For trusses spanning up to 12.00 m |
| 13 | M.S. structural works with hollow sections (square or rectangular shape) conforming to IS: 806-1968 & IS:1161-1998) connected to one another with bracket, gusset, cleat as per design, drawing & direction of Engineer-in-Charge complete including cutting to requisite shape & size, fabrication including metal arc welding conforming to IS: 816-1969 & IS: 9595 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of all M.S. Hollow section, all consumables such as electrodes, gas and hire charges of all tools and plants and labour reqired for execution and all incidental chages (such as electricity, labour insurance) etc. complete.i) For trusses spanning up to 12.00 m |
| 14 | 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor. |
| 15 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface]. (II)Withc 1:4 cement Mortar (a) 20 mm thick plaster |
| 16 | (II)Withc 1:4 cement Mortar (b) 15 mm thick plaster |
| 17 | Neat cement punning above 1.50 mm in wall,dado,window,, sills, floor basement floor. |
| 18 | Wood work in door and window frame fitted and fixed in position complete including a protective coat of painting at the contact surface of the frame exluding cost of concrete, Iron Butt Hinges and M.S clamps. (The quantum shouldbe correted upto three decimals). (f) sissu, gammar, champ. |
| 19 | Panel shutters of door and window, as per design (each panel consisting of single plank without joint), including fitting and fixing the same in position but excluding the cost of hinge and other fittings. In ground flooriv) 25mm thick shutters with 12mm thick panel of size 30 to 45 cm.(b) Sishu, Gamar, Champ,Badam,Bhola, Mogra, Hallak. |
| 20 | Supplying, fitting and fixing M.S. clamps for door and window frame made of flat bent bar, end bifurcated with necessary screws etc. by cement concrete(1:2:4) as per direction. (Cost of concrete will be paid separately).(a) 40mm X 6mm, 200mm Length |
| 21 | Iron butt hinges of approved quality fitted and fixed with steel screws, with ISI mark. 100 mmx 75mmx 3.5mm |
| 22 | Anodised aluminium Aldrop / Sliding bolts of approved quality manufactured from extruded section conforming to I.S. specification (I.S. 2681/66) fitted and fixed complete.(i) 250mm x 16mm dia bolt. |
| 23 | Anodised aluminium barrel / tower / socket bolt (full covered) of approved manufactured from extruded section conforming to I.S. 204/74 fitted and fixed with cadmium plated screws: (iv)150mm long x 10 mm dia rod |
| 24 | Anodised aliminium D-type handle of approved quality manufactured from extruded section conforming to I.S. specification (I.S. 230/72) fitted and fixed complete. 150mm gripx 12 mm dia rod |
| 25 | Supplying best Indian sheet glass panes set in putty (as per I.Sspecification) and fitted and fixed with teak wood beads and nails complete. (In all floors for internal wall & upto 6 m height for externalw all)(ii) 4 mm thick |
| 26 | P.V.C- False Ceiling :Providing False Ceiling made with framework of steel tube of 40mm x 20mm of not less than 18 gauge,the long and cross section will be welded with each other 1000mm to 1200mm apart the entire framework will be fixed in wall usingrawlplug or gutties or screws etc. and suspended from ceiling with M.S flat 19mmx3mm as necessary,the entire frame will be painted with red oxide. PRINTED LAMINATED P.V.C Section 150mm x 12mmx 1.00mm (+/- 0.01mm) of approved quality and colour will be fixed on the frame so that the entire framework will not be visible from below P.V.C Section will be fixed with the frame with the help of self tapping steel screws including all materials and labour charges including fitting,fixing the same and hoisting including mending the damages in all respect and cost of paint as required as per direction of Engineerin-Charge .In ground floor. |
| 27 | (a) M.S.or W.I. Ornamental grill of approved design jointscontinuously welded with M.S, W.I. Flats and bars of windows,railing etc. fitted and fixed with necessary screws and lugs in groundfloor. (ii) Grill weighing above 16 Kg./sq.mtr and above |
| 28 | Supplying, fitting and fixing windows and ventilators with or without integrated grills conforming to IS 1038-1975 and manufactured from rolled steel sections conforming to IS 7452-1974 with non-friction projecting type, box type hinges, glazing clips, lugs locking bracket, handle plate etc, including hoisting in position, straightening if required, fixing lugs in cement concrete ( 1:2:4) with stone chips 20 mm down cutting holes and mending good damages to match with existing surface complete in all respect excluding glazing. b) Openable steel windows as per IS sizes with side hung shutters and horizotal glazing bars. [The extra rate admissible for the openable portion only] |
| 29 | Grill above 16 kg/m2 |
| 30 | Supplying, fitting & fixing Zn-Al alloy (55% Al & 45% Zn)coating of 150 grams per sq. metre (followed by colourcoated on both side) steel sheet work having minimum yieldstrength of 550 Mpa of trapizoidal profile of approved make(excluding the supporting frame work) fitted and fixed with55 mm & 25 mm self tapping screw, EPDM Washer 16 mmdia & 3 mm th. washer etc. complete with 150 mm end lapand one corrugation minimum side lap. (Payment to be madeon area of finished work). a) With 0.5 mm thick sheet |
| 31 | Galvanised plain sheet works (excluding supportingframework) fitted and fixed with 6 mm. dia J or L hook-boltsand nuts, sheet-bolts, limpet and bitumen washers and puttywith 150 mm. end lap & 50 mm minimum side lap complete.(b) In wall: with 0.63 mm. sheets |
| 32 | Galvanised iron sheet ridging fitted with necessary bolts,screws, washers etc complete.(225mm end lapping). (B) 450 mm lapping each way |
| 33 | Galvanised iron sheet eaves gutter fitted and fixed withnecessary 50 mm X 6 mm M.S flat bar clamps bent to design,bolts, nuts, washers etc. complete. Eaves gutter made of 0.63mm. sheets.(300mm End lapping)(b) 300 mm wide gutter |
| 34 | Wooden eaves board as per design, fitted and fixed complete:In ground floor(ii) Ornamental eaves board (Ordinary Teak)(a) 19mm thick |
| 35 | Lime punning about 3 mm. thick with stone lime and shell lime(1:2) |
| 36 | Applying Interior grade Acrylic Primer of approved quality and brand on plastered or cencrete surface old or new surface to receive Distemper/ Acrylic emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC. (In Ground Floor). |
| 37 | Applying Exterior grade Acrylic primer of approved quality and brand on plastered or cencrete surface old or new surface to receive decorative textured (matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of theEIC.In Ground Floor:(b) Two Coats |
| 38 | Acrylic Distemper to interior wall, ceiling with a coat of solvent based interior grade acrylic primer (as per manufacturer's specification) including cleaning and smoothning of surface.Two Coats/ |
| 39 | Protective and Decorative Acrylic exterior emulsion paint of approved quality, as per manufacturer's specification and as per direction of Engineer-in-Charge to be applied over acrylic primer as required. The rate includes cost of material, labour, scaffolding and all incidental charges but excluding the cost of primer. In Ground Floor b) Premium 100 % crylic |
| 40 | (b) Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. |
| 41 | (a) Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. |
| 42 | A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :a) On timber or plastered surface :(iv) Two coats (with any shade except white |
| 43 | b) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :e(b) On steel or other metal surface :(iv) Two coats (with any shade except whit |
| 44 | Supplying, fitting & fixing UPVC pipes A- Type and fittings conforming to IS:13592-1992 with all necessary clamps nails, including making holes in walls, floor etc. cutting trenches in any soil through masonry concrete structures etc if necessary and mending good damages including joining with jointing materails (Spun Yarn, Valamoid/Bitumen/M-Seal etc) complete.upvc pIPES(ii)110 mm Dia |
| 45 | C) Bend 87.5 Degree (ii) 110 mm Dia |
| 46 | D) Shoe:(ii) 110 mm Dia |
| 47 | Supplying, fitting, fixing, Chain link fencing of approved qualitywith R.C.C posts wooden posts or iron posts by means ofgalvanised \\"C\\" clips to grid of horizontal strands of galvanisedhigh tensile spring steel wire of 12 S.W.G which have to betensioned and fixed to the vertical posts by means of galvanised special clips, bolts and nuts etc. |
| 48 | ADD 1% CESS |
| 49 | ADD 1% CESS Please Enable Macros to View BoQ information |