| 1 | Taking down Cement plaster or cement lime plaster on brick or stone walls including raking out joints, hacking for key & scrubbing down with water etc complete including disposal of unserviceable rubbish outside cantt area all as specified and directed by Engineer-in-Charge. |
| 2 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises complete including disposal of unserviceable rubbish outside cantt area all as specified and directed by Engineer-in-Charge. |
| 3 | Demolition of cement concrete (reinforced) (reinforcement cut as required to facilitate demolition) as in roofs, floors (other than ground floors) beams, slabs, staircases, landing, chajjas and similar suspended work complete including disposal of unserviceable rubbish outside cantt area all as specified and directed by Engineer-in-Charge. |
| 4 | Dismantling Stone slabs and tiles of any description or thickness in floors, aprons etc, removing rubbish off the premises complete all as specified and directed by Engineer-in-Charge. |
| 5 | Dismanting of cement concrete of any description not otherwise provided for inany location and any position complete including disposal of unserviceable rubbish outside cantt area all as specified and directed by Engineer-in-Charge. |
| 6 | Taking down chowkhats or frames n.exc 1.5 sqm each (without taking off shutter from the frame) and removing from the site including dismantling brick work of hold fasts complete all as specified and directed by Engineer-in-Charge. |
| 7 | Taking down chowkhats or frames exc 1.5 sqm but n.exc 4 sqm each (without taking off shutter from the frame) and removing from the site including dismantling brick work of hold fasts etc complete all as specified and directed by Engineer-in-Charge. |
| 8 | Taking down old 100 mm bore, PVC (SWR) pipes single socketed, including all fitting like trapes, bends,junctions etc complete all as specified and directed by Engineer-in-Charge. |
| 9 | Taking down old 75 mm bore, PVC (SWR) pipes single socketed, including all fitting like trapes, bends,junctions etc complete all as specified and directed by Engineer-in-Charge. |
| 10 | Dismanting of mild steel work of any description not otherwise provided for inany location and any position complete all as specified and directed by Engineer-in-Charge. |
| 11 | Dismantling boarding, any description, fixed in any position with nails complete including disposal of unserviceable rubbish outside cantt area all as specified and directed by Engineer-in-Charge. |
| 12 | Taking up or down steel tubing and connections of 25mm bore in pipe, including cleaning for re-fixing or removal from site to store complete all as specified and directed by Engineer-in-Charge. |
| 13 | Taking up or down steel tubing and connections of 20mm bore in pipe, including cleaning for re-fixing or removal from site to store complete all as specified and directed by Engineer-in-Charge. |
| 14 | Cutting chases in stone wall, pinning in, making good to facings where required and pointing in cement mortar 1:3 to ends or edges of landings, steps, cills, sunshades, shelves, lintels, etc.; and cutting chases for concealed water tubing or concealed conduit wiring etc., and making good, cutting not exc 10 cm girth and complete all as specified and directed by Engineer-in-Charge. |
| 15 | Demolition of brick work or stone/boulder masonary built in cement mortar incl all quions arches, pillar or any other descrption etc complete including disposal of unserviceable rubbish outside cantt area all as specified and directed by Engineer-in-Charge. |
| 16 | Dismantling Wall and ceiling boards (fibre, pulp, insulation, etc.) or insulation boards/slabs/ blankets, any thickness, including cover fillets from any position complete including disposal of unserviceable rubbish outside cantt area all as specified and directed by Engineer in Charge. |
| 17 | Dismantlling plain or corrugated steel sheeting in roof coverings in any position complete including disposal of unserviceable fillets outside cantt area all as specified and directed by Engineer in Charge. |
| 18 | Dismantling timber scantlings as in rails, posts, rafters, purlins etc under 40 Sq cm in section from any situation complete all as specified and directed by Engineer in Charge. |
| 19 | Disconnecting existing tanks of capacity 2000 ltr, setting aside and removing from site complete all as specified and directed by Engineer-in-Charge. |
| 20 | Hacking out old broken glass (any thickness, size, quality or description) from wooden ,iron frames ,glazed with putty or fixed with beads including punching or drilling out glazing pins/spring clips complete, all as specified and as directed by Engr-in-charge. |
| 21 | Disconnecting existing tanks of capacity 2000 ltr, setting aside and removing from site complete all as specified and directed by Engineer-in-Charge. Please Enable Macros to View BoQ information |
| 22 | Disconnecting existing tanks of capacity 2000 ltr, setting aside and removing from site complete all as specified and directed by Engineer-in-Charge. Please Enable Macros to View BoQ information |