|
| 1 | Earth work in excavation of foundation by hydraulic excavator in all type of soil with proper disposal including lead up to 30 m and lift up to 1.5 M with levelling, dressing to profile and manual compaction etc required for proper completion of work as per direction of Engineer-In-Charge. But excluding Cost of GST. |
| 2 | Laying C.C. 1:2:4 in foundation with Cement, Coarse sand and 11.20-19mm stone grit including mixing with machine, laying, ramming, curing and all cost of material, labour, T&P etc all complete. But excluding Cost of GST. |
| 3 | Centering and shuttering for super structure work including cost of all material, labour, T&P etc all complete. But excluding Cost of GST. |
| 4 | Steel Reinforcement (Fe 415 grade TMT bar) for R.C.C. work including cutting, bending, binding and placing in position with all cost of material, labour, T&P etc required for proper completion of work. But excluding Cost of GST. |
| 5 | Laying R.C.C. 1:1:2 with Cement, Coarse sand and 11.20-19mm stone grit including mechanical mixing, laying, vibration, curing and all cost of material, labour, T&P etc all complete.. But excluding Cost of GST. |
| 6 | Laying C.C. 1:11/2:3 in wing wall and C.C blocks with Cement, Coarse sand and 11.20-19mm stone grit and 0.1 percent temperature reinforcement including mechanical mixing, laying, vibration, curing and all cost of material, labour, T&P etc all complete as per direction of Engineer-in-Charge But excluding Cost of GST. |
| 7 | Supplying & Laying Mirzapur stone boulder 25 kg to 60 kg manually placed and closely packed in mechanically woven double twisted hexagonal wire crate of class 2 as per IS 16014:2014 of required size 2.00Mx1.50Mx0.45M with two diaphragm having mesh size 12cmX10cm dia 2.70/3.70 mm (ID/OD) galvanized steel wire with polymer coated in launching apron including all lead & lift, cost of all material, wire crate, labour, T&P, Carriage etc required for proper completion of work But excluding Cost of GST. |
| 8 | Supplying & Laying Geotextile sheet 200 GSM woven multifilament polypropylene yarn on slope of bank with pegs including preparation of sub-grade and cost of all material, labour, T&P etc required for proper completion of work. But excluding Cost of GST. |
| 9 | Earth work in filling for making earth cushion over Geo Textile sheet below stone pitching including cost of all material, labour, T&P etc required for proper completion of work. But excluding Cost of GST. |
| 10 | Supplying & Laying Mirzapur stone boulder 25kg to 60kg manually placed & closely packed in mechanically woven double twisted hexagonal wire crate of class 2 as per IS 16014:2014 of required size 2.00Mx1.50Mx0.30M with two diaphragm having mesh size 12cmX10cm dia 2.70/3.70 mm (ID/OD) galvanized steel wire with polymer coated in slope pitching work including all lead & lift, cost of all material , wire crate, labour, T&P, Carriage etc required for proper completion of work But excluding Cost of GST. |
| 11 | Supplying, fabrication, installation and testing of Flap Gate of size 1500mmX1250mm having member frame & flap. fabricated with carbon steel plate as per IS 2062 E-250BR with thickness 8mm with adequate stiffener. Frame design shall be flange back type with stainless steel anchor bolts and grout with mounting studs and rubber gasket. Lifting lug shall be provided on top of frame. Hinge & levers as per IS2062 E-250 and shall connect frame to flap. Flap gates shall be provided with seal system to restrict leakage. All flap gate member shall be one coat of epoxy primer and two coat of epoxy paint including cost of all material, labour, T&P etc required for proper completion of work as per direction of Engineer-In-Charge. But excluding Cost of GST. |
| 12 | Finishing wall with cement washing with Portland Cement slurry two coat including all cast of material, labour, T&P etc required for proper completion of work. But excluding Cost of GST. |
| 13 | Dewatering for excavation of foundation and C.C work Boring with 150mm casing pipe including lowering of assembly and extracting casing pipe including all cost of material, labour, T&P etc all complete. But Excluding Cost of GST |
| 14 | Hiring and running of 5H.P. Diesel pump including operator and P.O.L. for Dewatering work. But excluding Cost of GST. Please Enable Macros to View BoQ information |