Name of Work:- Flood Protection and channelization of Alchi Nallah(Under SDP)
Sl. No.
Item Description
1
Earth work in excavation by mechanical means (Hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) includinggetting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, asdirected by Engineer-in-charge. a)All kinds of soil:-70%
2
b)Ordinary rock:-30%
3
Providing and laying in position cement concrete of specified grade excluding thecost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
4
Centering and shuttering including strutting, propping etc. and removal of formwork for :Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
5
Dumping stone including cost of stones. in Horizontal on level
6
Channelization of Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively )Wet
7
Pumping out water caused by springs, tidal or river seepage, broken water mainsor drains and the like.
8
Carriage of material from source to site of work by mechanical transport. a)Cement an avg lead 65 Km
9
b)Sand an avg lead 10 Km
10
c)Stone agg an avg lead 40 Km
11
d)Stone an avg lead 1 Km
12
Carriage of materials by Headload. A. Cement an avg lead 250 mtrs
13
B. Sand and stone agg an avg lead 250mtr
14
C.Solling Stone an avg lead 250mtr Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.