| 1 | BUILDING RENOVATION |
| 2 | OD421434/2025-2026:Providing and fixing platform consisting of M.S.tubular frame and required board, includingproviding and fixing of frame work made of M S hollow tubes to centre by 6 mm dia bolts and nuts, includingfixing of studs along both ends of platform fixed flush to wall with suitable anchor fastener or metal s using8 mm thick multipurpose cement bonded wood particle board(double layer) manufactured as per IS: 14276 with suitablecement bonded board screws(M.S Hollow Tubes to be paid separately) |
| 3 | 10.16.1:Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes |
| 4 | 11.39:Providing and laying rectified Glazed Ceramic floor tiles of size 300x300 mm or more (thickness to be specified by the manufacturer), of 1st quality conforming to IS: 15622, of approved make in colours White, Ivory, Grey, fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 cement : 4 Coarse sand), including grouting the joints with white cement and matching pigments etc., complete. |
| 5 | 21.1.1.2:Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/ appropriate Z sections and other sections of approved make conforming to IS : 733 and IS: 1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDM rubber/ neoprene gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminnium snap beading for glazing /paneling, C.P. brass/ stainless steel screws, all complete as per architectural drawings and the directions of Engineer-in-charge.(Glazing, paneling and dash fasteners to be paid for separately):For fixed portionPowder coated aluminium (minimum thickness of powder coating 50 micron) |
| 6 | 21.3.1:Providing and fixing glazing in aluminium door, window, ventilator shutters and partitions etc. with EPDM rubber / neoprene gasket etc. complete as per the architectural drawings and the directions of Engineer - in -Charge. ( Cost of aluminium snap beading shall be paid in basic item):With float glass panes of 4.0 mm thickness (weight not less than 10kg/sqm) |
| 7 | 13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) |
| 8 | 50.12.5.1:Providing and fixing false ceiling with e board classic tile or equivalent make of size 610x610x4 mm ceiling of approved quality in aluminium frame work with necessary screws etc complete ( aluminium frame work shall be paid separately) |
| 9 | OD421494/2025-2026:Providing and fixing main Tee(gyproc matric grid 24x38x3mm) for fixing E-board Ceiling including all cost of materials conveyance labour charges etc complete |
| 10 | OD421495/2025-2026:Providing and fixing Cross Tee(gyproc matrix grid 24x25x0.3mm) for fixing E-board Ceiling including all cost of materials conveyance labour charges etc complete |
| 11 | OD421493/2025-2026:Providing and fixing Wall angle (gyproc matrix grid 24x24) for fixing E-board Ceiling including all cost of materials conveyance labour charges etc complete |
| 12 | OD421611/2025-2026:Providing and fixing L angle(20x20mm) for fixing E-board Ceiling including all cost of materials conveyance labour charges etc complete |
| 13 | OD421613/2025-2026:Providing and fixing PVC pipes including fixing the pipe with clamps/Clips at 1.00 m spacing. This included jointing of pipes with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge 90 mm dia 2.5 Kfg/cm2 - External work - Exposed on wall |
| 14 | 10.25.2:Item Shifted to Sub head 14 as item 14.73Item Shifted to head 14 as item 14.74Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works |
| 15 | 13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work Please Enable Macros to View BoQ information |