|
| 1 | Clearing scrub jungle with uprooting down stream side, upstream side & approach road side and disposing of the same as directed by the Engineer in charge of the works as per technical specification. |
| 2 | Cutting and removal of vegetative debris on the approach to wier and disposed away from the site as per the directed by the Engineer in charge of the works as per technical specification including cost of labour, hire charges etc,. complete. |
| 3 | Clearing of chocked culverts across the existing road at different chainage incluing upstream side,barral portion, down stream side , cleaning , disposal of debris away from site ,all lead,lift etc complete |
| 4 | Filling the Tunnel Muck for road major breached portion of Porthimund Junction to Westren catchment Weir III and II in various location only transportation charges, consolidation, lead, lift, labour etc complete complying with standard specification and as directed by engineer incharge of work. |
| 5 | Earth work excavation in hard stiff clay, stiff black cotton, hard red earth, shale, murram gravel, stoney earth & earth mixed with small size boulders and hard gravelly soil and depositing the earth in the places shown by the Engineer with initial lead of 10 M and initial lift of 2 m etc., complete,for culvert and retaining wall at approach road complying with standard specifications. |
| 6 | Refilling with earth including cost of all materials, labour, lead, lift etc., complete for building basement as per specification and as directed by the Engineer at site. |
| 7 | Providing and placing in position Plain Cement Concrete M 10 grade for culvert , retaining wall on the approach road and up stream side pitching using broken hard granite coarse aggregate (well graded) of nominal maximum size of 40mm and down graded to I.S specified grading and mixing the ingredients in approved mixer including placing in layers and vibrating, curing, finishing the surface with all leads and lifts, labour etc., complete as per the direction of the Engineer and complying with standard specifications. |
| 8 | Providing and placing in position Plain Cement Concrete M15 grade using broken hard granite coarse aggregate size of 20 mm and down graded for steps and name board post including, Shuttering Charges, placing in layers and vibrating, curing, finishing the surface with all leads and lifts, labour etc., complete as per the direction of the Engineer and complying with standard specifications. |
| 9 | Providing and placing in position Plain Cement Concrete M15 grade using broken hard granite coarse aggregate (well graded) of nominal maximum size of 40mm & 20 mm and down graded to I.S specified grading and mixing the ingredients in approved mixer including shuttering charges,placing in layers and vibrating, curing, finishing the surface with all leads and lifts, labour etc.,complete for protection wall on the approach road as per the direction of the Engineer and complying with standard specifications. |
| 10 | Filling with filter material in the composition of hard broken stone 63mm & 40 mm (25%), 20 mm (25%), 10 mm (15%), and stone dust (35%) in the back side of protection wall including cost of all materials, labour, lead, lift etc., complete as per specification and as directed by the Engineer at site. |
| 11 | Drilling holes of 40 mm dia in rock for providing 2.50 m long;25mm dia grip rods for for Dam top Parapet wall height increase including cost of drilling, labour, lead and lift etc, complete including cost of all materials, with all lead and lift etc., Complete. |
| 12 | Supplying and Providing 2.50 m long ;25mm dia RTS grip rods for the Dam top Parapet wall including cost of all materials, Cutting, bending and fixing in position and grouting with cement slurry with all lead and lift etc., Complete. |
| 13 | Providing and placing in position Reinforced Cement Concrete M 20 grade for Protection wall & Column, Plinth beam, Lintel, sunshade, Beam, Roof slab, Precast slab for Guard room and control room using broken hard granite coarse aggregate (well graded) of nominal maximum size of 20mm downgraded to I.S specified grading and mixing the ingredients in approved mixer including placing in layers and vibrating, curing, finishing the surface with all leads and lifts, labour etc., complete but excluding cost of steel reinforcement as per the direction of the Engineer and complying with standard specifications. |
| 14 | Supplying, fabricating and placing in position of RTS rods of required size for all reinforced cement concrete works including cost of binding wire, steel rods, conveyance charges, cutting, bending, tying with all lead, lift and labour charges etc., complete, complying with standard specifications and as directed by the Engineer at site. |
| 15 | Plastering with cm 1:3, 12 mm thick for steps on upstream and down stream side on both flanks and for check dams including cost of materials, labour, lead,lift, curing, etc complete |
| 16 | Supplying and laying in position of GI pipe 200 mm dia line of medium class ( B class) of TATA make or equivalent conforming to IS 1239 as directed by the Engineer in charge including cost of all materials, specials such as Tees, bends, Couplings, screws cutting , threading, joining, specials, TW plugs, packing and wrapping the pipe and fixing the pipe on the pedestal with galvanized iron clips lead, lift etc., complete. |
| 17 | Supplying and fixing of Ductile Iron Double flange Gate valve of 200 mm dia as per BS 5163-89/ISI 14846-2000/DIN 3202 F4. including cost of all materials leads, lifts, etc., complete. |
| 18 | Supplying and fixing of Cast Iron single chamber Air release valve made of Austenitic alloy steel of SS AISI 304/316 and the float shall be made of Polytetrafluroethylene/ Austenitic alloy steel of AISI 304/316 including cost of all materials , labour ,leads, lifts, etc., complete. |
| 19 | Colour washing using exterior emulsion two coats over one coat of Primer to the dam parapet wall including cost of all materials, labour. T & P etc complete. |
| 20 | Painting with two coats of EPOXY Zing rich Aluminum paint over one coat Red oxide paint after throughly cleaning the surface of hand rails at dam top , gate and fencing post completely as per the instruction of Engineer at site including cost of materials, lead, lift etc ,complete. |
| 21 | Painting for New Iron Works |
| 22 | Painting for Old Iron Works |
| 23 | Painting two coats of approved quality of enamel paint and colour over one coat of primer for new steel/ iron works & etc., including cost of all materials, labour, lead, lift etc. complete |
| 24 | Design,supply and fixing of Ornamental Aluminium letter of 300mm x 300 mm in the name board including cost of all materials , labour charges, lead lift etc., complete as per specification and as directed the engineer incharge at site. |
| 25 | Supply , fabrication of structural steel for Name board and Handrails including cost of all materials , labour charges lead lift etc., complete |
| 26 | Supplying and fixing of 75 mm dia PVC pipe of working pressure 4 Kg/ cm2 for protection wall weep hole including cutting ,cost of all materials, leads, lifts etc., complete. . |
| 27 | Supplying and laying of NP3 Class 900 mm dia RCC Hume pipe confirming to IS is 458/2003 including cost of pipe as a finished work including all other incidental charges, testing charges including loading, unloading, transport and delivery in good condition at work site ect.,complete, as directed by the site Engineer as per standard specification. |
| 28 | Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with paver sin Sub Base / Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges,rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 |
| 29 | Providing and applying of Tack coat over existing BT surface using 2.00 Kg of Bituminous Emulsion (RS 1) per 10Sqm for preparatory to another bituminous construction over it including clearing of road surface, cost of materials , labour charges , rental for machinery , fuel and all other incidental charges ,etc. complete as per Clause 503 of MORT&H and directed by the Engineer. |
| 30 | Providing and laying 50mm consolidated thick Bituminous Macadam using 0.20cum fo 26.50- 13.20mm, 0.43cum of13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 / VG40 bitumen for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50 mm with mechanical paver to the specified grades and cross sections and consolidated by8- 10 tonne Vibratory / Pneumatic Roller to the required density etc.,including labour forattending to paver to site etc.,including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all including fuel and all other incidental charges etc.,complete as per specification using CMP as per clause 504 of MORTH Rev-5 |
| 31 | Providing and laying Bituminous Concrete to 30 mm thick using 0.13 cum of 19.00- 9.50mm, 0.17cum of 9.50- 2.36 mm and 0.26 cum of 2.36 and below with 50.30 kgs of VG30 / VG40 bitumen for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 4 0mm with mechanical paver to the specified grades and cross sections and consolidated by8-10 tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler ,tipper trucks, Paver Finisher / 9 m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc.,complete as per specification using CMP as per clause 507 of MORTH Rev-5 |
| 32 | Water washing with special chemical 'Steripure 100' with high pressure water jet for removal lime leaching , algae and funges formation in the D/S face of Dam under hanging condition as per specification including cost of all materials, labour charges T&Ps required for the work scaffolding etc., complete. Wherever required as per instruction of Engineer in-charge at site. |
| 33 | Chipping the loose flush pointing and removing old cement mortar joint, removing the loose materials , clearing the joints to a minimum depth of 50 mm , packing and pointing with cm 1:3 for 50 mm depth down stream face of dam including cost of all materials working platform rope, ladder, all labour, charges T&P labour charges for operating hanging platform curing etc., complete. |
| 34 | Reaming the existing vertical drainage shaft to the entire depth by rotary drilling from the top of the dam to the drainage gallery level including cost of machineries , equipments, consumables, other materials required for the work , labour charges for operation and cleaning the drill holes, transport charges for machinery from one place to another place, water charges all leads, lift etc complete as directed by the Engineer at site. |
| 35 | Supply of portable Handheld LED flash light 24 W, 1100 lumens, 3000 mAh, rechargeble Make PHILIPS , Model aircraft aluminium alloy, water resistant and including cost of all material lead lift etc complete. |
| 36 | GST for bidders within TamilNaduNote : Bidders within Tamil Nadu shall enter values separately for SGST and CGST and shall enter the value as \\"Zero\\" for IGST. |
| 37 | GST for bidders outside TamilNadu Note: Bidders outside Tamil Nadu shall enter value only for IGST and shall enter the value as \\"Zero\\" for SGST and CGST |
| 38 | IGST Please Enable Macros to View BoQ information |