| 1 | 1) Construction of Dining hall Near Community hall H/o Varagur |
| 2 | Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, Sectioning the street to as per SS 20 B. |
| 3 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for foundation |
| 4 | Providing the following thickness of Granolithic pattern floor finish with Plain Cement concrete 1 : 2 : 4 mix using 10-12mm ISS HBG metal and the top rubed smooth etc., complete complying with standard specification as directed. Rate for 10 m2i.25mm thick. for office buildings, Bus stand, Shopping complex and School buildings. |
| 5 | Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance of all materials to site and all labour charges etc complete |
| 6 | Refilling in foundation and basement and trenches with excavated earth in layers of not more than 15cm thick, well watered,rammed and consolidated complaying with standard specification etc completed |
| 7 | Brickwork in CM 1:5 mix using country bicks including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete. |
| 8 | Supply & Fabrication of steel including all cost and conveyance of all materials to site and all labour charges for etc., complete. |
| 9 | Supplying and erecting centering shuttering including all cost and conveyance of all materials to site and all labour charges for etc., complete. |
| 10 | Reinforced Cement Concrete 1:1.5:3 mix using 20 mm metal for all items including cost & conveyance and labour charges etc complete. |
| 11 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty should be got approved by the Executive Engineer before use on work. (Based on SoR 2023-24) Wall putty Powder: (10 sqm/10x20 kg= 20Kg) |
| 12 | Cost and supply of following provision are made in this estimate including all cost and conveyance of all materials to site and all labour charges for etc., complete.(Main door) |
| 13 | Cost and supply of following provision are made in this estimate including all cost and conveyance of all materials to site and all labour charges for etc., complete.(Steel Window) |
| 14 | Plastering with CM 1:5 mix using 12 mm thick for sides including cost & conveyance and labour charges etc complete. |
| 15 | Labour charge for fixing of Steel Door including all labour charges etc complete. |
| 16 | Labour charge for fixing of Steel Window including all labour charges etc complete. |
| 17 | Weathering course with brick jelly lime concrete using 20mm brick jelly with pure slacked lime over R.C.C. roof slab in the proportion of 32:12.5 and finshed with Cement mortor 1:4 -20mm thick plastering including cost & conveyance and labour charges etc complete. |
| 18 | Terrace flooring used pressed tiles including cost & conveyance and labour charges etc complete. |
| 19 | Paving the floor with best quality Vertified Tiles of size 600 x 600 x 8mm of approved colour, shade and quality laid in cement mortar 1:3 (one cement and three sand) 20mm thick in all floors and the top pointed with the white cement mixed same colour pigment |
| 20 | Distempering in two coats using oil bound distemper including cost and conveyance of all materials to site and all labour charges etc complete. |
| 21 | Painting in two coats using exterior emulsion paint including cost and conveyance of all materials to site and all labour charges etc complete. |
| 22 | Painting two coats with approved quality Enamel paint over New iron work including cost & Conveyance and all labour charges etc complete. |
| 23 | Wiring with 2x1.5 sq.mm.PVC insulated SC unsheathed FRLS copper conductor of1100V grade insuitable PVC rigid pipe concealed in wallandceilingwith PVC accessoires in flush with wall with 3mm thick hylum sheet cover withTW switch box and 5AFT switch and making good of the concealed portion with suitable colour for PVC concealed light ( 6 points per coil) (for rooms like bath, toilet & pumproom, etc.) SD 26 |
| 24 | Wiring with 2x1.5 Sqmm (22/0.3) PVC insulated SC unsheathed Cu. Conductor of 1100 V grade in suitable PVC rigid pipe on wall and ceiling with PVC accessories and with 150x100x113mm TW switch box and 5 A 3 pin non inter locking CS plug with painting of suitable colour with continuous earth wire connection of 14 SWG TC wire for Open PVC Plug Point SD.38 |
| 25 | Supply and fixing of TNEB meter Board suitable for 32A Three phase service connection with 32 A Fuse unit (500V) 32 A neutral link and earth ling (1\\"x1/8\\" Copper flat) on TW plank of size 600mm x 450mm x 19mm with supporting TW reepers of 1\\" thick an either side with painting with suitable bolt and nuts for fixing the TW plank on wall with earth connection and inter connection with 7/20 PVC insulated copper wire from EBV Meter to fues unit (SD.127) |
| 26 | Supply and run of 2 of 4 Sqmm (56/0.3) PVC insulated SC unsheathed Cu.Conductor of 1100 v grade on 7/20 GI Bearer wire for Service connection mains (SD.65) |
| 27 | Supply and run of 2 of 1.5 Sqmm (22/0.3) PVC insulated SC unsheathed Cu.Conductor of 1100 v grade in 25mm dia GI Pipe (Class'B') Suitably bent at both ends with necessary angle iron upright and end supports for maints (SD.69) |
| 28 | Supply and fixing of single box type 4'40 W flu fitting complete with copper choke and condensor with TW round blocks on wall or ceiling with flue tube with PVC Unsheathed coper leads from terminals to the fitting (SD.88) |
| 29 | Supply and fixing of 1200 mm ( 48\\") AC ceiling fan complete with stepped electronic 300 W regulator with 1 m down rod on the existing clamp. SD 106 cross arm size 450mm (18\\") SD 106 |
| 30 | Supply and fixing of WT Bulk Head Fitting with guard (Philips / Bajaj / Crompton / K. Lite) suitable for incandescent lamp with 60W Bulb (SD.84) |
| 31 | Supplying and fixing P.V.C rainwater down fall pipe of 110mm dia with necessary shoes, bends,& clamps etc., |
| 32 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \\"BB\\" for all works in this package} Please Enable Macros to View BoQ information |