|
| 1 | Clearing light jungle including cost of all materials, labour, lead, lift, etc., complete. |
| 2 | Earthwork excavating and depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay stiff black cotton hard red earth, shales, murram, gravel stoney earth, earth mixed with small size boulders Clearing juliflora jungle with uprooting including cost of all materials, labour, lead, lift, etc., complete. |
| 3 | Supplying and filling of M-sand in foundation and basement with watering and consolidation as per specn. including cost of all materials, labour, lead, lift, etc., complete. (As instructed by the Engineer at site) |
| 4 | Providing PCC 1:3:6 mix using 40 mm HBGS Jelly for foundation including cost of materials, labour charges, lead, lift etc, complete (without formwork) |
| 5 | RCC 1:1.5:3 (M-20) using 12-20mm HBS metal (machine crushed) metal for foundation including cost of all material, lead, lift, etc, complete, but excluding cost of steel reinforcement (without formwork) |
| 6 | RCC 1:1.5:3 (M-20) using 12-20mm HBS metal (machine crushed) metal for foundation including cost of all material, lead, lift, etc, complete, but excluding cost of steel reinforcement (with formwork) Column up to Basement |
| 7 | RCC 1:1.5:3 (M-20) using 12-20mm HBS metal (machine crushed) metal for foundation including cost of all material, lead, lift, etc, complete, but excluding cost of steel reinforcement (with formwork) Grade Beam |
| 8 | RCC 1:1.5:3 (M-20) using 12-20mm HBS metal (machine crushed) metal for foundation including cost of all material, lead, lift, etc, complete, but excluding cost of steel reinforcement (with formwork) Column above Basement, up to Ground floor Roof level parapet wall |
| 9 | RCC 1:1.5:3 (M-20) using 12-20mm HBS metal (machine crushed) metal for foundation including cost of all material, lead, lift, etc, complete, but excluding cost of steel reinforcement (with formwork) Plinth beam |
| 10 | RCC 1:1.5:3 (M-20) using 12-20mm HBS metal (machine crushed) metal for foundation including cost of all material, lead, lift, etc, complete, but excluding cost of steel reinforcement (with formwork) Lintel beam |
| 11 | RCC 1:1.5:3 (M-20) using 12-20mm HBS metal (machine crushed) metal for foundation including cost of all material, lead, lift, etc, complete, but excluding cost of steel reinforcement (with formwork) Sunshade |
| 12 | RCC 1:1.5:3 (M-20) using 12-20mm HBS metal (machine crushed) metal for foundation including cost of all material, lead, lift, etc, complete, but excluding cost of steel reinforcement (with formwork) Roof beam |
| 13 | Brick work in CM 1:5 using II class ground moulded chamber burnt bricks of size 9\\" x 4 3/8\\" x 2 3/4 \\" for basement and superstructure including cost of all materials, labour, lead, lift, curing, etc., complete. (As instructed by the Engineer at site) |
| 14 | Flooring with PCC 1:3:6 mix using 40mm HBS metal for flooring (machin crushed metal) including cost of all materials labour lead, lift, etc., complete. (As instructed by the Engineer at site) |
| 15 | RCC 1:1.5:3 (M 20) using 12 to 20mm (machine crushed) metal for Control Room flooring concrete 100 mm thick with formwork including cost of all materials, lead, lift, etc., complete. but excluding cost of steel reinforcement |
| 16 | RCC 1:1 1/2:3 (M 20) using 12mm to 20 mm HBS metal (machine crushed) for roof slab concrete of 130 mm thick with formwork including cost of all materials, labour, lead, lift, centering shuttering , curing, etc., complete. But excluding cost of steel reinforcement. |
| 17 | Plastering with CM.1:5 mix using 12mm thick for inside & outside walls, including cost of all materials, labour, lead, litf, etc, complete. |
| 18 | Plastering with CM 1:3 mix 12 mm thick for ceiling, sunshade etc., including cost of materials, labour, lead, lift, watering, curing, etc., complete. |
| 19 | White washing two coats with White cement approved quality over a primary coat for ceiling, exposed surfaces of wall, beam, slab, sunshade, lintel, etc., including cost of all materials, lead, lift, etc., complete. |
| 20 | Colour washing two coats with Exterior Plastic Emulsion paint over one coat of Plastic Emulsion primer for outside wall including cost of all materials, labour, lead, lift, etc., complete. |
| 21 | Colour washing two coats with Plastic Emulsion paint over one coat of Plastic Emulsion primer for inside wall including necessary plaster of parry's two coats cost of all materials, labour, lead, lift, etc., complete. |
| 22 | Supplying and fixing UPVC (Un-Plasticized Polyvinyl Chloride) Windows of casement type (open) from the profile the size of outer frame 60mm x 58mm and shutter profile are reinforcement with GI/1mm 125GSM and 100% corrosion free, the profiles are multi chambered sections with wall thick of 2mm. The EPDM rubber (black colour) covered with over all the edges of frame and shutter the shutter will be provided with Espag multi power point locks and also it operates as handle. The corners and joints should be welded and cleaned. Radiations free pin headed plain or brown colour glass 4mm thick should be provided to the shutter and it should not allow leakage of water even at most ranging storms and should have key lockable action, security protective hinges, strong locking systems and as per size for arresting noise and energy loss. The connecting mechanism between sash and outer frame that enables opening of the window. The window should be fixed to the wall with 100% packing with screws and silicon packing all round the frames. |
| 23 | Flooring with approved Vitrified tiles 600x600mm of approved Quality, design & colour (Johnson or equivalent make)laid in cement mortar 1:3 -20mm thick including pointing with same coloured cement using 0.4kg/sqm, finishing the joints, including cost of all materials, water charges,labour, lead, lift, etc. complete. |
| 24 | Providing one coarse of pressed tiles of 20x20x2cm embedded with CM 1:3 mixed with crude oil at 10% by weight of cement and pointed with same oiled mortor including all material, labour, lead, lift etc complete. |
| 25 | Supplying and fixing in position of GI angle 50x50x6mm of required length for fixing the cable duct, as per the direction of site Engineer including cost of all materials, lead, lifts, and cutting the GI angle required length and labour for fixing etc, complete.( As instructed by engineer at site) |
| 26 | Supplying and fixing in position of MS channel 110 x 50mm required length for fixing the cable duct side wall, as per the direction of site Engineer including cost of all materials, lead, lifts, and cutting the MS channel required length and labour for fixing etc, complete.(As instructed by engineer at site.) |
| 27 | Dismantling existing Brickwork wall as instructed by Engineer at site including cost of all materials, lead, lift, labour, etc., complete. |
| 28 | Supplying and fabricating and placing in position of MS / RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire, etc., complete. |
| 29 | Supplying and fixing in position of 25mm dia pvc pipe of 10 kg/sq.cm pressure from the approved manufacturer Apollo, chemplast, avanplast, valarmathi, usha, vimal etc., confirming to IS 4985 of 1968, 4984 of 1970 including cost of all special fixtures labour lead, lift, etc., complete. |
| 30 | Supplying and fixing of 1000 lit capacity sintex tank of approved quality including cost of labour for fixing etc., complete(As instructed by the engineer at site) |
| 31 | Refilling with excavated soil other than sand in foundation and sides of masonry, consolidation as per std. specn. With water including all labour, lead, lifts. etc, complete.(As instructed by the engineer at site) |
| 32 | Removing the excess earth and Refilling to the basement area as instructed by field engineer including all labour lead, lift, etc., complete. |
| 33 | Supplying and filling of Red gravel in the basement filling, labour for filling, watering and consolidation, including cost of all materials, lead, lifts, labour, etc., complete.( As instructed by the engineer at site) |
| 34 | Wiring with 2x1.50 sq.mm PVC unsheathed copper multistand cable of 1100 V grade in suitable pvc rigid pipe in wall or ceiling with pvc accessories with TW switch box in flush with wall covered with hylum sheet of 3mm thick with painting of suitable colour with continuous earth wire connection of 14 SWG TC wire for light and Fan points (SD 23)( As instructed by the engineer at site) |
| 35 | Wiring with 2x1.5 sq.mm (22/0.3) PVC insulated SC unsheathed Cu.conductor of 1100 V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories in in flush with wall, with 150mm x 100mm x 113mm TW switch box with 3 mm thick hylum sheet cover for 5 A 3 Pin non interlocking CS plug with continuous earth wire connection of 14 SWG TC wire and making good of the concealed portion with suitable colour for concealed PVC Plug point.(SD38) ( As instructed by the engineer at site) |
| 36 | Supplying and fixing 20W 4 Feet LED Fitting with LED including cost of all materials, labour charges, T&P, lead, lift, etc., complete. |
| 37 | Wiring with 2x4 sq.mm Pvc unsheathed copper multistand cable of 1100 V grade in suitable pvc rigid pipe in wall or ceiling with pvc accessories with 150mm x 100mm x 75mm T.W switch box in flush with wall covered with 3mm tk. Hylum sheet for 15 amps 3pin flush type non interlocking C.S plug including pin top with painting of suitable colour with continuous earth wire connection of 14 SWG T.C. wire for plug point. (As instructed by the engineer at site) |
| 38 | Supplying and fixing of 1400mm (56\\") sweep AC ceiling fan with regulator with Suitable down rod on the existing clamps of crompton / rally / Orient including cost of all materials lead, lift etc., complete. SD(114) (As instructed by the engineer at site) |
| 39 | Providing PVC down fall pipe using 110mm dia 4 Kg / Sqcm, PVC pipe and pvc clamp line supreme etc., including fixing PVC washer type door bend & shoe, in correct position and connecting from the roof slab including cost of all materials, labour, transport lead, lift, etc., complete, including pvc accessories and washers. |
| 40 | SGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only |
| 41 | CGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only |
| 42 | Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as \\"0\\" only Please Enable Macros to View BoQ information |