Tender For Nctps-I-Cm-Circle-Cm-Ii-Protection Arrangement To The Inner Portion Of Western Side Ash Bund (Ch.2100.00 To Ch.2450.00) Of Primary Pond -Ii At Ash Dyke., Thiruvallur-Tamil Nadu
TDR : 54505107
Tender Notice
BOQ
14 Days Left
Thiruvallur
Tamil Nadu
Tender For Nctps-I-Cm-Circle-Cm-Ii-Protection Arrangement To The Inner Portion Of Western Side Ash Bund (Ch.2100.00 To Ch.2450.00) Of Primary Pond -Ii At Ash Dyke.
Name of Work:- NCTPS-I-CM-Circle-CM-II-Protection arrangement to the inner portion of western side ash bund (Ch.2100.00 to Ch.2450.00) of Primary Pond -II at Ash Dyke.
Sl. No.
Item Description
1
Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: CE/NCTPS-I Name of Work: NCTPS-I-CM-Circle-CM-II-Protection arrangement to the inner portion of western side ash bund (Ch.2100.00 to Ch.2450.00) of Primary Pond -II at Ash Dyke. Contract No: CE/SE/CM/NCTPS-I/166/2025-26 Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Scope of Work Item Code / Make Quantity Units HSN / SAC CODE Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE for Work portion in figures to be entered by the Bidder Rs. P BASIC RATE for Labour charges of Erection portion Rs. P BASIC RATE for consumables charges of erection portion Rs. P Packing & Forwarding Charges in percentage Freight & Insurance charges in precentage GST in percentage IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes inRs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words
2
NCTPS-I-CM-Circle-CM-II-Protection arrangement to the inner portion of western side ash bund (Ch.2100.00 to Ch.2450.00) of Primary Pond -II at Ash Dyke.
3
Providing and erecting, fixing casurunia post walling support using 10 cm to 13 cm dia (vertical) and 4 cm to 5 cm dia (Horizontal) casurunia posts along the banks of bund for supporting the ash filled HDPE bag stack including cost of all materials, transporting, lead, lift etc., complete as directed by the Engineer at site.
4
Providing and stacking wet ash filled HDPE bags on the inner side of the bund in the western side of primary pond-II including cost of all material labour, lead, lift etc., complete as directed by the Engineer at site. (Wet ash will be provided at free of cost at Ash dyke). Total in Figures 0.0 0.0 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.