| 1 | Earth work of foundation in all type of soil with all lead & lift, compaction dressing including all cost of labour, material and T&P etc. requried for proper completion of the work as directed by Engineer-in-charge. |
| 2 | Providing & Laying of C.C M-10 (1:3:6) with A-40 Nominal Mix including all cost of material, labour and T&P etc. required for proper complition of work.as directed by Engineer-in-charge. |
| 3 | Providing & Laying of C.C M-15 (1:2:4) with A-20 including all cost of material, labour and T&P etc. required for proper complition of work.as directed by Engineer-in-charge. |
| 4 | Providing & Laying of C.C M-20 (1:1:5:3) with A-20 and coarse including all cost of labour, material,and T&P etc. required for proper complition of work.as directed by Engineer-in-charge. |
| 5 | Providing & Laying of C.C M-25 Design mix or (1:1:2) with A-20 and coarse sand including all cost of labour, material, and T&P etc. required for proper complition of work.as directed by Engineer-in-charge. |
| 6 | Steel reinforcement work in RCC including cutting Bending binding & placing in position as required including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. |
| 7 | Centering & Shuttering for ordinary C.C work as required including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. |
| 8 | Centering & Shuttering for all R.C.C work as required including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. |
| 9 | P / laying of coarse sand in graded filter including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. |
| 10 | P / laying of pea gravel in bed and graded filter sand in graded filter including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. |
| 11 | P / laying of Boulder 20 to 40 kg in bed, launching appran including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. |
| 12 | Painting and finishing with water proof approved paint on all exposed surface including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. |
| 13 | P / Fixing 75mm dia PVC drain pipe including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. |
| 14 | P / Fixing year plate for completion of work or as Directed By Engineer in Charge. |
| 15 | P / Fixing B.M plate for completion of work or as Directed By Engineer in Charge. |
| 16 | Supply and fixing wheel guard stone (size 150x150x1500)as Directed By Engineer in Charge. |
| 17 | E/W in filling in repairing damaged bank, making approaches and diverson including all lead lift, compaction dressing as requied for proper completion of work including all cost of labour, material and T&P etc. as Directed By Engineer in Charge. Please Enable Macros to View BoQ information |