|
| 1 | Labour engaged for cleaning temple premises |
| 2 | Dismantling and removing Manglore tiles over roofs including ridges,hips,valley sheet,wind ties and boardering but excluding roof timbers and stacking materials with in a distance of 150 m |
| 3 | Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead:Of sectional area below 40 square centimeters |
| 4 | Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead:Of sectional area 40 square centimetres and above |
| 5 | Supplying and fixing Anjily wood wrought and put up for roof members including cost and conveyance of materials etc. complete . |
| 6 | Supplying and fixing Anjily wood reapers of size 50x25 mm with wire nails including cost and conveyance of materials etc. complete. |
| 7 | Supplying and fixing Dept. wood reapers of size 50x25 mm with wire nails including cost and conveyance of materials etc . complete. |
| 8 | Supplying new M.P roofing tiles 410X235 mm or nearest available size |
| 9 | Supplying new hip and ridge tiles 400 mm or nearest available size |
| 10 | Painting with oil type wood preservative of approved brand and manufacture:Old work (one or more coats) |
| 11 | Resetting with old and newly supplied first class MP tiles 410x 235 mm or nearest available size |
| 12 | Resetting department MP hip ridge tiles of the 400 mm nearest available size in C. M 1:4 |
| 13 | Finishing walls with Acrylic Smooth exterior paint of required shade :Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement paint surface |
| 14 | Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground within 50 meters lead:With cement mortar 1:4 ( 1 cement : fine sand) |
| 15 | Labour engaged for attending necessary repairs and maintenance to Wooden Windows and doors -Carpenter 2nd class |
| 16 | Water washing and cleaning the old painted surface with pressure pump including hire charges of pump etc complete |
| 17 | Finishing walls with Acrylic Smooth exterior paint of required shade :Old work (One or more coat applied @ 0.90 ltr/10 sqm). |
| 18 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :One or more coats on old work Please Enable Macros to View BoQ information |