| 1 | SUPPLY OF MATERIAL PORTION |
| 2 | STAY CLAMP FOR SP-23 WITH NUT &BOLT |
| 3 | PP & CLAMP WITH N&B ST POLE SP-23 |
| 4 | 11 KV CABLE TIES FOR PIN INSULATOR |
| 5 | 11 KV IPC FOR COVERED TOCOVERED COND. |
| 6 | 11 KV IPC FOR COVERED TO BARECONDUCTOR |
| 7 | 11 KV MID SPAN JOINTING KIT |
| 8 | IPC WITH AL. BAIL FOR EARTHING 11 KV |
| 9 | 11 KV Tension Hardware |
| 10 | 11 KV AAAC AL-59 , 70 SQ.MM COVEREDCOND |
| 11 | LABOUR PORTION |
| 12 | CONSTRUCTION OF RETURNING WALL& PLINTH |
| 13 | FABRICATION OF STEEL |
| 14 | EXCAVATION OF PIT FOR STAY SET |
| 15 | ERECTION OF 11 KV STAY SET |
| 16 | GROUTING OF STAY SET |
| 17 | EXCAVATION OF PIT FOR POLE |
| 18 | ERECTION OF SINGLE SP-23 POLE |
| 19 | GROUTING OF POLE |
| 20 | MUFFING OF POLE |
| 21 | DISMANTLING OF 11 KV LINE(WEASEL) |
| 22 | FIXING OF LIGHTNING ARRESTOR |
| 23 | CARTAGE SP-21/23 POLE, 71-100 KM |
| 24 | CARTAGE OF PETTY MATERIAL,71-100KM |
| 25 | BACK CARTAGE OF PETTYMATERIAL,151-200KM |
| 26 | FIXING OF IPC WITH AL. BAIL FOREARTHING |
| 27 | FIXING OF 11 KV IPC FOR COVERED -COVERED |
| 28 | FIXING OF 11 KV IPC COVERED TO BARE COND. |
| 29 | LAYING, SAGGING OF COVERED CONDFOR 11KV |
| 30 | 11 KV CABLE TIES FOR PIN INSULATOR |
| 31 | INST. & FIXING OF CHEMICALEARTHING |
| 32 | FIXING OF 11 KV TENSION HARDWARE |
| 33 | FIXING OF 11 KV MID SPAN JOINTINGKIT Installation of LT Distribution Box complete work Please Enable Macros to View BoQ information |