| 1 | Carriage of Line material i.e. conductor, G.I. wire TPMO stay rod, disc insulator, cross arm, Angle channel and other required material from Store Center at 132 KV substation Mathura to the site of work including loading and unloading of material at both ends. |
| 2 | Erection of single pole structure 11 Mtrs Long ST Pole by digging of pits fitting of all relevant accessories and its grouting in ratio 1:4:8 cement, sand and brick ballast, (including Carriage of 8.5 Mtr Long PCC Pole from 132 KV Store Center Mathura to site of work including its loading and unloading at both ends, all labour, T&P, grouting material carrier etc arrenged by Contractor on his own cost) as per RESPO norms. |
| 3 | Erection of Double pole structure 11 Mtrs Long ST Pole by digging of pits fitting of all relevant accessories and its grouting in ratio 1:4:8 cement, sand and brick ballast, (including Carriage of 8.5 Mtr Long PCC Pole from 132 KV Store Center Mathura to site of work including its loading and unloading at both ends, all labour, T&P, grouting material carrier etc arrenged by Contractor on his own cost) as per RESPO norms. |
| 4 | Dismentling and Re-Mounting of 250 KVA Transformer from existing Plinth to Newly Constructed Pilnth to another LineShifting Site by opening of Connection and Re-Connection thereof (including Carriage of 250 KVA Transformer from existing Place to another place with loading & unloading at both ends) |
| 5 | Installation of stay set with grouting and nuzzling etc. as per RESPO drawing along with all routine material to be used for such works. |
| 6 | Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work. |
| 7 | Laying, sagging stringing and binding of Insulated ACSR Weasel Conductor on the erected PCC pole/STP including jumpering as per RESPO manual. |
| 8 | Laying, sagging stringing and binding of Arial Bunch Conductor 3x120 sqmm on the erected PCC pole/STP including jumpering as per RESPO manual. |
| 9 | Installation of 11 KV Drop Out Fuse Set/TPMO on various capacity Transformers. |
| 10 | Fixing of Distribution Box on the erected pole. |
| 11 | Construction of plinth of 400 KVA T/f size 5’x5’x4’ above ground level and one. Ft. below the ground level of 9’’ after excavation of 4 earth brick ballast shall be provided and hammering will be done properly. After that a retaining wall of 9 width by first class brick in ratio 1:4 of cement and sand shall be made. The earth shall be filled up to one ft. below the top of the plinth. after this brick ballast shall be provided upto 6 from the earth level and proper hammering shall be done. One No. Jall of 12 mm. MS tore shall be fixed in the hollow of plinth and one. Ft. thick RCC in ration of cement, sand and stone ballast shall be laid on the top of the plinth. The 12 mm. thick plastering shall be done all around the plinth in 1:4 ratio of cement and sand. The contractor shall be responsible to complete the work as per direction of Supervision Engineer. It includes the cost of all material, labour, T & P, carrier etc. required for proper completion of work. |
| 12 | Body and neutral earthing of 400 KVA transformers by digging pits 6” dia up to 3 mtr deep including inserting lowering 80mm dia G.I. and insert 50mm G.I. pipe chemical filled pipe (Pipe in pipe earthing) I.S.I. Mark B-Grade connecting with G.I. flat 50x6 mm Power Transformer to 80mm dia G.I. pipe and filling of chemical mixture around the G.I. pipe up to 3mtr. Including making of chamber. |
| 13 | Making of wire mesh fencing around constructed 400 KVA T/f plinth 4mtr. x 3 mtr. with proper grouting Erection and construction of Toe-wall around the transformer plinth including digging of pits and making wall 9 inch wide & 30 cm. under the ground level and 30 cm. up to the ground level and making pocket Filling the concreting for grouting of wire mesh fencing and plastering around the wall in ratio 1:4 cement and sand providing of one no. main gate in the wire mesh fencing for shifting the transformer size of gate 8 ft. x 4ft. including fixing of dandala for locking system, (Size of angle iron 50x50x6mm. and size of wire mesh fencing 1.5x2 sq. inch wire gauge 10 SWG.) All material/labour will be arranged by the contractor. |
| 14 | Dismentling of Iron Scrap i.e. Conductor, ST Pole, All. Wire etc. and its carriage to J.E. Store/Store Center Mathura as per direction by supervising engineer. Please Enable Macros to View BoQ information |