| 1 | CIVIL WORKS |
| 2 | 2.31Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees andsaplings of girth up to 30 cm measured at a height of 1 m above ground level andremoval of rubbish up to a distance of 50 m outside the periphery of the area cleared |
| 3 | 2.8.1 :Earth work in excavation by mechanical means (Hydraulic excavator) /manual meansin foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan),including dressing of sides and ramming of bottoms, lift up to 1.5 m, includinggetting out the excavated soil and disposal of surplus excavated soil as directed,within a lead of 50 m.All kinds of soil |
| 4 | 4.1.8Providing and laying in position cement concrete of specified grade excluding thecost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4coarse sand : 8 graded stone aggregate 40 nominal size) |
| 5 | 60.7.1DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonrywith good quality blasted rubble including packing to compactness to lines and levelscost and conveyance of all materials labour charges etc. complete as per direction ofDepartmental officers at site |
| 6 | 7.1.1Random rubble masonry with hard stone in foundation and plinth including levellingup with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarsesand) |
| 7 | 5.9.1Centering and shuttering including strutting, etc. and removal of formfor:Foundations, footings, bases of columns, etc for mass concrete |
| 8 | 5.9.6Centering and shuttering including strutting, etc. and removal of form for:Columns,Pillars, Piers, Abutments, Posts and Struts |
| 9 | 5.9.5Centering and shuttering including strutting, etc. and removal of form for:Lintels,beams, plinth beams, girders bressumers and cantilevers |
| 10 | 5.9.7Centering and shuttering including strutting, etc. and removal of form for:Stairs,(excluding landings ) except spiral - staircases) |
| 11 | 5.9.19Centering and shuttering including strutting, etc. and removal of form for:Weathershade, Chajjas, corbels etc., including edges |
| 12 | 5.9.3Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform |
| 13 | 5.9.16.1Centering and shuttering including strutting, etc. and removal of form for:Edges of slabs and breaks in floors and wallsUnder 20 cm wide |
| 14 | 5.2.2Reinforced cement concrete work in walls (any thickness), including attachedpilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts etc. up tot floor five level excluding cost of centering,shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 gradedstone aggregate 20 mm nominal size) |
| 15 | 5.3Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain windowsills, staircases and spiral stair cases up to floor five level excluding the cost ofcentering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size). |
| 16 | 2.25Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. |
| 17 | 5.22.6Steel reinforcement for R.C.C work including straightening, cutting, bending, placingin position and binding all complete upto plinth levelThermo - Mechanically Treatedbars of grade Fe-500D or more |
| 18 | 5.22A.6Steel reinforcement for R.C.C work including straightening, cutting, bending, placingin position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more |
| 19 | 50.6.3.2Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x10 cmor nearest available size confirming to IS 2185 part I of 1979 for super structure up tofloor two level for 10 cm thick wall in : CM 1:6 ( 1 cement : 6 coarse sand) includingcost of scaffolding complete |
| 20 | 50.6.7.2Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearestsize in cement mortar 1:6 for super structure above plinth level up to floor two levelincluding all cost of materials, labour charges etc |
| 21 | 13.1.112 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) |
| 22 | 50.13.19 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost ofmaterials, labour charges etc complete |
| 23 | OD29985/2025-2026Providing water cutting to the total sundhade and slab including cost and conveyanceof all materials and labour charges etc complete |
| 24 | 9.48.2Providing and fixing M.S. Grills of required pattern in frames of windows etc. withM.S. flats, square or round bars etc. including priming coat with approved steelprimer all complete.Fixed to openings/ wooden frames with rawl plugs screws etc |
| 25 | 21.1.1.2Providing and fixing aluminium work for doors, windows, ventilators and partitionswith extruded built up standard tubular sections/ appropriate Z sections and othersections of approved make conforming to IS : 733 and IS: 1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions,i.e. at top, bottom and sides with required EPDM rubber/ neoprene gasket etc.Aluminium sections shall be smooth, rust free, straight, mitred and jointedmechanically wherever required including cleat angle, Aluminnium snap beading forglazing /paneling, C.P. brass/ stainless steel screws, all complete as per architecturaldrawings and the directions of Engineer-in-charge.(Glazing, paneling and dashfasteners to be paid for separately):For fixed portionPowder coated aluminium (minimum thickness of powder coating50 micron) |
| 26 | 21.1.2.2For shutters of doors, windows & ventilators including providing and fixing hinges /pivots and making provision for fixing of fittings wherever required including thecost of EPDM rubber/ neoprene gasket required (Fittings shall be paid forseparately)Powder coated aluminium (minimum thickness of powder coating 50micron) |
| 27 | 21.2.2Providing and fixing 12 mm thick prelaminated particle board flat pressed three layeror graded wood particle board conforming to IS : 12823 Grade I Type II, in panellingfixed in aluminum doors, windows shutters and partition frames with C.P. brass /stainless steel screws etc. complete as per architectural drawings and directions ofEngineer - in- Charge.Pre- laminated particle board with decorative lamination onboth sides |
| 28 | 21.3.2Providing and fixing glazing in aluminium door, window, ventilator shutters andpartitions etc. with EPDM rubber / neoprene gasket etc. complete as per thearchitectural drawings and the directions of Engineer - in -Charge. ( Cost ofaluminium snap beading shall be paid in basic item):With float glass panes of 5.50mm thickness |
| 29 | 9.119Providing and fixing factory made P.V.C. door frame of size 50x47 mm with a wallthickness of 5 mm, made out of extruded 5 mm rigid PVC foam sheet, mitred atcorners and joined with 2 Nos. of 150 mm long brackets of 15x15 mm M.S. squaretube, the vertical door frame profiles to be reinforced with 19x19 mm M.S. squaretube of 19 gauge, EPDM rubber gasket weather seal to be provided through out theframe. The door fame to be fixed to the wall using M.S. screws of 65/100 mm size,complete as per manufacturer's specification and direction of Engineer-in Charge. |
| 30 | 9.118.3Providing and fixing to existing door frames25 mm thick PVC flush door shuttersmade out of a one piece Multi chamber extruded PVC section of the size of 762 mm x25 mm or less as per requirement with and average wall thickness of 1 mm ( ± 0.3mm). PVC foam end cap of size 23x10 mm area provided on both vertical edges to ensure the overall thickness of 25 mm. An M.S. tube having dimensions 19 mm x 19mm and 1.0 mm (± 0.1 mm) is inserted along the hinge side of the door. Core of thedoor shutter should be filled with High Density Polyurethane foam. The Top &Bottom edges of the shutter are covered with an end -cap of the size 25 mm x 11 mm.Door shutter shall be reinforced with special polymeric reinforcements as permanufacturer,s specification and direction of Engineer-in-charge to take up necessaryhardware and fixtures. Stickers indicating the locations of hardware will be pasted atappropriate places. |
| 31 | 50.9.1.1Providing wood work in frames of doors, windows, clerestory windows and otherframes, wrought framed and fixed in position with hold fast lugs or with dashfasteners of required dia & length (hold fast lugs or dash fastener shall be paid forseparately), using good quality Anjili wood /jack wood |
| 32 | 50.9.3.1Providing and fixing paneled or paneled and glazed shutters for doors, windows andclerestory windows, 30 mm thick shutters including ISI marked M.S. pressed butthinges bright finished of required size with necessary screws, excluding panelingwhich will be paid for separately, all complete as per direction 0f Engineer in- charge.using Anjili/ Jack wood |
| 33 | 9.97.3Providing and fixing aluminium tower bolts, ISI marked, anodised(anodic coating notless than grade AC 10 as per : 1868), transparent or dyed to required colour or shade,with necessary screws complete:200x10 mm |
| 34 | 9.97.5Providing and fixing aluminium tower bolts, ISI marked, anodised(anodic coating notless than grade AC 10 as per : 1868), transparent or dyed to required colour or shade,with necessary screws complete:100x10 mm |
| 35 | 9.77Providing and fixing bright finished brass 100 mm mortice latch with one dead boltand a pair of lever handles of approved quality with necessary screws etc. complete |
| 36 | 9.84Providing and fixing aluminium extruded section body tubular type universalhydraulic door closer (having brand logo with ISI, IS : 3564, embossed on the body,door weight upto 36 kg to 80 kg and door width form 701 mm to 1000 mm), withdouble speed adjustment with necessary accessories and screws etc. complete. |
| 37 | 9.82Providing and fixing bright finished brass hanging type floor door stopper withnecessary screws, etc. complete. |
| 38 | 9.100.1Providing and fixing aluminium handles, ISI marked, anodised (anodic coating notless than grade AC 10 as per IS : 1868) transparent or dyed to required colour orshade, with necessary screws etc. complete:125 mm |
| 39 | 22.5Providing and laying water proofing treatment in sunken portion of WCs, bathroometc., by applying cement slurry mixed with water proofing cement compoundconsisting of applying : a) First layer of slurry of cement @ 0.488 kg/sqm mixed withwater proofing cement compound @ 0.253 kg/sqm. This layer will be allowed to aircure for 4 hours. b) Second layer of slurry of cement @ 0.242 kg /sqm mixed withwater proofing cement compound @ 0.126 kg/ sqm. This layer will be allowed to aircure for 4 hours followed with water curing for 48 hours. The rate includespreparation of surface, treatment and sealing of all joints, corners, junctions of pipesand masonry with polymer mixed slurry. |
| 40 | 11.41.2Providing and laying vitrified floor tiles in different sizes (thickness to be specified bythe manufacturer) with water absorption less than 0.08% and conforming to IS :15622, of approved make, in all colours and shades, laid on 20 mm thick cementmortar 1:4(1 cement : 4 coarse sand), including grouting the joints with white cementand matching pigments etc., complete.Size of Tile 600 x 600 mm. |
| 41 | 11.37Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to bespecified by the manufacturer), of 1st quality conforming to IS : 15622, of approvedmake, in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thickcement mortar 1:4 (1 Cement : 4 Coarse sand), including pointing the joints withwhite cement and matching pigment etc., complete. |
| 42 | 11.36Providing and fixing I st quality ceramic glazed wall tiles conforming to IS : 15622(thickness to be specified by the manufacturer), of approved make, in all colours,shades except burgundy, bottle green, black of any size as approved by Engineer -inCharge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3 kg per sqm,including pointing in white cement mixed with pigment of matching shade complete. |
| 43 | 11.20.4Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard,jointed with neat cement slurry mixed with pigment to match the shade of tiles,including rubbing and cleaning etc. complete on 20 mm thick bed of cement mortar1:4 ( 1 cement : 4 coarse sand).Ordinary cement without any pigment |
| 44 | 10.25.2Item Shifted to Sub head 14 as item 14.73Item Shifted to head 14 as item 14.74Steel work welded in built up sections/framed work, including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer usingstructural steel etc. as required.In gratings, frames, guard bar, ladder, railings,brackets, gates and similar works |
| 45 | OD29987/2025-2026White cement priming coat over newly plastered surface after cleaning the suface |
| 46 | 13.43.1Applying one coat of water thinnable cement primer of approved brand andmanufacture on wall surface:Water thinnable cement primer |
| 47 | 13.82.2Wall painting with acrylic emulsion paint, having VOC (Volatile Organic Compound)content less than 50 grams/ litre, of approved brand and manufacture including applying additional coats wherever required, to achieve even shade and colour.Twocoats |
| 48 | 13.61.1Painting with synthetic enamel paint of approved brand and manufacture to give aneven shade:Two or more coats on new work |
| 49 | 16.68Providing and laying 60 mm thick factory made cement concrete interlocking paverblock of M - 30 grade made by block making machine with strong vibratorycompaction, of approved size, design & shape, laid in required colour and patternover and including 50 mm thick compacted bed of coarse sand, filling the joints withfine sand etc. all complete as per the direction of Engineer-in-charge. |
| 50 | OD29986/2025-2026Supplying and fixing Name board using ACP board size of 1.80x0.90m and reflectivelettering including lettering and fitting charge |
| 51 | PLUMBING WORKS |
| 52 | 17.3.2Providing and fixing white vitreous china pedestal type water closet (European type)with seat and lid, 10 litre low level white vitreous china flushing cistern & C.P. flushbend with fittings & C.I. brackets, 40 mm flush bend, overflow arrangement withspecials of standard make and mosquito proof coupling of approved municipal designcomplete, including painting of fittings and brackets, cutting and making good thewalls and floors wherever required :W.c. pan with ISI marked black solid plastic seatand lid |
| 53 | 18.53.1Providing and fixing C.P. brass angle valve for basin mixer and geyser points ofapproved quality conforming to IS: 893115 mm nominal bore |
| 54 | 18.32.1Constructing masonry chamber 30x30x50 cm inside, in brick work in cement mortar1:4 (1 cement : 4 coarse sand) for stop cock, with C.I. surface box 100x100x75 mm(inside) with hinged cover fixed in cement concrete slab 1:2:4 mix (1 cement : 2coarse sand: 4 graded stone aggregate 20 mm nominal size), i/c necessary excavation,foundation concrete 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mmnominal size) and inside plastering with cement mortar 1:3 (1 cement : 3 coarse sand) 12 mm thick, finished with a floating coat of neat cementcomplete as per standard design:With common burnt clay F.P.S (non modular) bricksof class designation 7.5 |
| 55 | 17.7.2Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32mm C.P. brass waste of standard pattern, including painting of fittings and brackets,cutting and making good the walls wherever require:White Vitreous China Washbasin size 630 x 450 mm with a single 15 mm C.P. brass pillar tap |
| 56 | 17.73.2Providing and fixing PTMT towel rail complete with brackets fixed to wooden cleatswith CP brass screws with concealed fitting arrangement of approved quality andcolour600 mm long towel rail with total length of 645 mm, width 78 mm andeffective height of 88 mm, weighting not less than 190 gms |
| 57 | 18.51.1Providing and fixing C.P. brass long body bib cock of approved quality conforming toIS standards and weighing not less than 690 gms.15 mm nominal bore |
| 58 | 17.32.2Providing and fixing mirror of superior glass ( of approved quality) and of requiredshape and size with plastic moulded frame of approved make and shade with 6 mmthick hard board backing :Rectangular shape 453x357 mm |
| 59 | 48A Providing and fixing rectangular high density polyethylene water storage loft tankwith cover, conforming to ISI : 12701, colour of opaque white or as approved byEngineer-in-charge. The rate includes making necessary holes for inlet, outlet & overflow pipes. The base support i/c fittings & fixtures for tank shall be paid separately. |
| 60 | 50.18.7.2.1Providing and fixing PVC pipes, fittings including fixing the pipe with claps at 1.00metre spacing. This includes jointing of pipes & fittings with one step PVC solventcement and testing of joints complete as per direction of Engineer-in-Charge 20 mmdia 12Kgf/cm2 - Internal work - Exposed on wall |
| 61 | 50.18.7.4.1Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00m spacing. This includes jointing of pipes & fittings with one step PVC solventcement and testing of joints complete as per direction of Engineer-in-Charge 32 mmdia 10 Kfg/cm - Internal work- Exposed on wall |
| 62 | 50.18.7.6.1Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00m spacing. This includes jointing of pipes & fittings with one step PVC solventcement and testing of joints complete as per direction of Engineer-in-Charge 50 mmdia 10Kgf/cm2- Internal work - Exposed on wall |
| 63 | 50.18.8.7.1Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00m spacing. This includes jointing of pipes with one step PVC solvent cement andtesting of joints complete as per direction of Engineer-in-Charge. Concealed workincluding cutting chases and making good the wall etc. 63 mm pipe 6 Kgf/cm2 |
| 64 | 50.18.9.9.1Providing and fixing PVC pipes includings jointing of pipes with one step PVCsolvent cement, trenching, refilling & testing of Joints complete as per direction ofengineer in charge.110 mm dia 6Kgf/cm2 |
| 65 | 50.17.1.5Supplying and fixing CP Health Faucet superior quality ( Jagur or equvalent make )including cost of materials and labour charges etc complete as per the direction of siteEngineer-in-charge. |
| 66 | 50.18.9.22.1Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes,including jointing with PVC solvent cement - 110 mm dia Elbow |
| 67 | 50.18.9.22.4Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes,including jointing with PVC solvent cement- 110 mm dia Bend |
| 68 | OD29983/2025-2026Providing and fixing 150 mm silt with CP gratings |
| 69 | 51.19.ST3Supplying and installing ready made PVC Septic tank including the cost of carriage,trenching, placing at the level below ground level as specified as per the direction ofengineer in charge (Provision for CC/RCC/Sand/06mm aggregate for the preparation of bed shall be paid separately) 3. 25 to below 35 flush capacity |
| 70 | ELECTRICAL WORKS |
| 71 | 1.10.3Wiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.mmFRLS PVCinsulated copper conductor single core cable in surface / recessed medium class PVCconduit, with modular switch, modular plate, suitable GI box and earthing the point with 1.5sq.mm. FRLS PVC insulated copper conductor single core cable etc as required.Group C |
| 72 | 1.12Wiring for light/ power plug with 2X4 sq. mm FRLS PVC insulated copper conductorsingle core cable in surface/ recessed medium class PVC conduit along with 1 No 4sq. mm FRLS PVC insulated copper conductor single core cable for loop earthing asrequired. |
| 73 | 2.3.2Supplying and fixing following way, single pole and neutral, sheet steel, MCBdistribution board, 240 V, on surface/ recess, complete with tinned copper bus bar,neutral bus bar, earth bar, din bar, interconnections, powder painted includingearthing etc. as required. (But without MCBIRCCB/Isolator8 way, Double door |
| 74 | 90.11.1.21Supply and installation of sheet steel, phosphatised and painted, dust and verminproof enclosure of MCB DB including copper /brass bus bar, neutral link, earth busand DIN rail suitable for fixing MCB/ isolator etc. fixed on wall using suitableanchor bolts or fixed in recess including cutting hole on the wall , making good thedamages, colour washing etc. as required12 way (8+12) - double cover TPN verticalDB with provision for fixing MCCB as incomer and SP/ TP MCB as outgoing (IP42/43) |
| 75 | 1.24.3Supplying and fixing following modular switch/ socket on the existing modular plate& switch box including connections but excluding modular plate etc. asrequired.15/16 amp switch |
| 76 | 1.14.2Wiring for circuit/ submain wiring alongwith earth wire with the following sizes ofFRLS PVC insulated copper conductor, single core cable in surface / recessedmedium class PVC conduit as required2X 2.5 sq. mm + 1 X 2.5 sq. mm earth wire |
| 77 | 1.24.5Supplying and fixing following modular switch/ socket on the existing modular plate& switch box including connections but excluding modular plate etc. as required.6pin 15/16 amp socket outlet |
| 78 | 5.19Providing and fixing 4.00 mm dia copper wire on surface or in recess for loopearthing along with existing surface/ recessed conduit/ submain wiring/ cable asrequired. |
| 79 | 5.4Earthing with G.I. earth plate 600 mm X 600 mm X 6 mm thick includingaccessories, and providing masonry enclosure with cover plate having lockingarrangement and watering pipe of 2.7 metre long etc. with charcoal/ coke and salt asrequired. |
| 80 | 1.26Supplying and fixing modular blanking plate on the existing modular plate & switchbox excluding modular plate as required. |
| 81 | 1.27.2Supplying and fixing following size/ modules, GI box alongwith modular base &cover plate for modular switches in recess etc as required.3 Module (100mmX75mm) |
| 82 | 1.28.2Supplying and fixing following Modular base & cover plate on existing modularmetal boxes etc. as required.3 Module |
| 83 | 1.14.4Wiring for circuit/ submain wiring alongwith earth wire with the following sizes ofFRLS PVC insulated copper conductor, single core cable in surface / recessedmedium class PVC conduit as required2 X 6 Sq.mm + 1 x 6 sq.mm earth wire |
| 84 | 2.14.3Supplying and fixing following rating, double pole, (single phase and neutral), 240volts, residualcurrent circuit breaker (RCCB), having a sensitivity current upto 300 milliamperes inthe existing MCB DB complete with connections, testing and commissioning etc. asrequired.63 amps |
| 85 | 1.14.1Wiring for circuit/ submain wiring alongwith earth wire with the following sizes ofFRLS PVC insulated copper conductor, single core cable in surface / recessedmedium class PVC conduit as required2x1.5 sq.mm + 1x1.5 sq.mm earth wire |
| 86 | OD29963/2025-2026Supplying and fixing 6 A to 32 A ratings , SP MCB and other accessories. |
| 87 | OD29962/2025-2026Supplying and fixing 32 amps modular DP switch and other accessories etc complete |
| 88 | OD29964/2025-2026Supplying and fixing angle batten with 23 watts CFL and other accessories |
| 89 | OD29965/2025-2026Supplying and fixing simple tube set (electronics) and other accessories |
| 90 | OD29966/2025-2026Supply, Installation, testing and commissioning of ceiling fan of following sizes including wiring the down rods of standard length (up to 30 cm) with 1.5 sq. mm FRLS PVC insulated, copper conductor, single core cable etc. as required.1200mm sweep - ceiling fan complete with service value minimum 4.0(cub meter/ minute/ Watt), Air delivery minimum 210(cubic meter/minute), Copper windingsuitable for 230V/240V single phase AC supply |
| 91 | 1.25Supplying and fixing two module stepped type electronic fan regulator on the existingmodular plate switch box including connections but excluding modular plate etc. As required. |
| 92 | OD29960/2025-2026Supply, conveyance, installation, testing and commissioning of the following sizesof exhaust fans in the existing opening,fixing necessary bolt and nuts, makinggood the damages etc. as required including giving connections with requiredlength of 24/0.20mm PVC insulated and PVC sheathed 3 core round copperconductor flex wire conforming to relevant ISS. 200 mm sweep Light DutyExhaust fan in plastic body with self opening lowers working on 230V singlephase A/C. |
| 93 | OD29961/2025-2026Supply, installation, testing and commissioning of wall mounted Three Phase 4 wireEnergy meter with poly carbonate body having range of 10-63A, with enclosure madeout of powder coated 16 SWG CRCA sheet suitable for fixing in surface/recess with3 nos. of 63A HRC fuses, 63A TPN isolator neutral link itsinter connections etc. The enclosure shall have lockable door with glass window andall mounting accessories etc. complete as required (supply of energy meter is underKSEB scope) |
| 94 | FURNITURE WORKS |
| 95 | OD29978/2025-2026Providing modular work station using 1''nova pan on table top and 3/4nova pan are side pannel and drawyer ,key board etc and the edges are finishing with PVC ban of suitable colour of nova pan and providing handles ,locking arrangements etc complete- Pentagonal work station (L- Shape 1.55x1.70) |
| 96 | OD29979/2025-2026Providing modular work station using 1''nova pan on table top and 3/4nova pan are side pannel and drawyer ,key board etc and the edges are finishing withPVC ban of suitable colour of nova pan and providing handles ,locking arrangementsetc complete - Pentagonal work station (L- Shape 1.60x1.8) |
| 97 | OD29982/2025-2026Supplying and fixing office counter of size 2.00 mx 0.75x0.75(+.3) m using 18 mmthick double side laminated Novapan including required number of drawer andkeyboard including the provision of holding CPU and all other finishing work ofrequired shade etc complete. |
| 98 | OD29981/2025-2026Supplying office table of size 1.50x0.60x0.75m made of 15mm thick pre laminatedparticle board with melamine finish with drawers including all charges etc complete |
| 99 | OD29975/2025-2026Supplying office Chair (Mid back) |
| 100 | OD29976/2025-2026Supplying office Chair (high back) |
| 101 | OD29977/2025-2026Supplying and fixing Steel Almirah of size 1.00x0.5x1.90 m ( ISI marked) |
| 102 | OD29980/2025-2026Supplying Visitors chair with arm |
| 103 | COMPUTER NETWORK |
| 104 | OD29971/2025-2026Providing network cabling using cat 6 cable through 1;case and capingand giving connection including all labour charges material grimping and connectingetc complete |
| 105 | OD29968/2025-2026Supplying and fixing Roset box and grimping the ends etc complete |
| 106 | OD31149/2025-2026Supplying and fixing 24 Port Switch |
| 107 | OD29967/2025-2026Supply and fixing Wall Mount 4U Rack for port switch/patch panel with ACDistribution box, cooling fan and hardware mounting kit. |
| 108 | OD29970/2025-2026Engaged a computer engineer for programming all network and commissioning etccomplete( 1 rack x2000= 2000) |
| 109 | TELEPHONE CABLING |
| 110 | OD29972/2025-2026Supplying and drawing two pair telephone cable through 1; case and caping and giving connection |
| 111 | OD29974/2025-2026Supplying and fixing roset box and giving connection. |
| 112 | OD29973/2025-2026Supplying and fixing IO Box Please Enable Macros to View BoQ information |