| 1 | Making one set of scaffolding only for replacing glass panels, painting, uprooting plant and another repairing works of building and S&P works for external works only with 10 cm. dia bamboo as main posts at the rate of 1 metre centre to centre and 7.5 cm. dia bamboo ties @ 0.75 metre apart fitting and fixing with necessary coir, nails etc. as per direction of the Engineer-incharge. |
| 2 | b) Extra for additional 3.6 height or part thereof |
| 3 | Additional rate for 38th times shifting @10% eaach shifting |
| 4 | Uprooting and removing plants from the surface of walls parapet etc and making good damages. (Repairing of damages to be paid separately).(a) Small plant of girth of exposed stem upto 75 mm. lift upto 6 mtr. |
| 5 | Dismantling R.C. floor, roof, beams etc. includingcutting rods and removing rubbish as directedwithin a lead of 75 m. including stacking of steelbarsIn 2nd floor |
| 6 | In 1st floor |
| 7 | In ground floor |
| 8 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground flooras per relevant IS codes.(i) Pakur Variety |
| 9 | In 1st floor |
| 10 | In 2nd floor |
| 11 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns,lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) |
| 12 | In 1st floor |
| 13 | In 2nd floor |
| 14 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening andremoval of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawingand direction.(a) For works in foundation and upto roof of ground floor/upto 4 m (i) Tor steel/Mild SteelI. SAIL/ TATA/RINL |
| 15 | In 1st floor |
| 16 | In 2nd floor |
| 17 | Stripping off worn out plaster and raking outjoints of walls, celings etc. upto any height and inany floor including removing rubbish within alead of 75m as directed. |
| 18 | Cleaning the concrete surface by removing dirt and debris, marking defective locations and removing loose concrete by careful stripping untill hard surface is exposed, cutting the concrete to regular shape, wire brushing the exposed surface and removing debris from site complete as per direction of the Engineer - in - Charge. |
| 19 | Cleaning the exposed reinforcement preferably upto full diameter by wire brush, applying two coats of polymer based rust removing compound left for 24 hours, removing the coating and then applying two (2) coats of polymer modified anti corrosive protective coating formulated to inhibit the corrosion of reinforcement as per manufacturer's specification] [Mode of measurement:The affected surface area of reinforcement shall be considered for payment] |
| 20 | (a) Applying 2 coats of bonding agent with synthetic multi functional rubber emulsion having adhesive and water proofing properties by mixing with water in proportion (1 bonding agent : 4 water : 6 cement) as per Manufacturer'sspecification [Cement to be supplied by the Department] |
| 21 | Cement concrete (1:1.5:3) with graded stone chips 5.6 mm size with hexagonal square mesh wire netting, I.R.C. fabric mesh or X.P. M. fitted and fixed after tying the existing reinforcement on concrete without distributing the same and with proper scarping and cleaning the reinforcement and disturbed concrete with wire brush etc. after applying a coat of cement including the cost of wire netting I.R.C or X. P. M. & cost of all handling and scaffolding complete as per direction of Engineer-in -charge.b) 25 mm thick |
| 22 | Repairing crack in wall by cement grouting (1 : 2) including widening the crack on the surface (into V section) cleaning and packing the same with cement mortar (1 : 2) and finishing off to match with adjacent surface. (Cement-69 Kg/100 m) |
| 23 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (i) With 1:6 cement mortar (b) 20 mm thick plasterIn gr. Floor |
| 24 | In 1st floor |
| 25 | In 2nd floor |
| 26 | In 3rd Floor |
| 27 | (ii) With 1:4 cement mortar (c) 10 mm thick plasterIn gr. Floor |
| 28 | In 1st floor |
| 29 | In 2nd floor |
| 30 | In 3rd Floor |
| 31 | Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc.NOTE:Cement 0.152 cu.m per100 sq.m. |
| 32 | (a) M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows, railing etc. fitted and fixed with necessary screws and lugs in groundfloor.(i) Grill weighing above 10 Kg./sq.mtr and up to 16 Kg./sq. mtr. |
| 33 | In 1st floor |
| 34 | In 2nd floor |
| 35 | Labour for taking out door and window frame including shutter for repair or replacement of different parts of the frame & refixing the same including mending good all damaes complete. (Concrete and brick work for mending damage will be paid separately)(b) Above area 2.5 Sq.m |
| 36 | Supplying, fitting & fixing of Aluminium fixed partion wall of all aluminium sections viz top, bottom and side member, intermediatemember, glazing clip made of Aluminium Alloy Extrusions conforming to IS: 733-1983 and IS: 1285-1975, annodized conforming to IS:18681983, fitted with all other accessories viz. EPDM gusket,cleat, angle screws etc. including labour charges for fitting and fixing of aluminium fixed partition wall with glass / panel board all complete as per architectural drawings and direction of Engineer-in-charge.(Excluding cost of glass/ panel board,10-12 Micron thickness Annodizing film.Natural white.a) for unsupported length of vertical member upto 1.50m. height of both ends of vertical member restrained but panel with in 0.90 sqm |
| 37 | Supplying,fitting & fixing of 2-Track / 3-Track Aluminium sliding Window of all Aluminium sections viz. window frame (top,bottom & sideframe), shutter (top, bottom, side & interlock member) made of aluminium alloy extrusions conforming to IS 733-1983 & IS 1285-1975, annodised conforming to IS 1868-1983, fitted with all other accessories viz. PVC roller, EPDM gasket, maruti lock, screws etc. including labour charges for fitting & fixing of aluminium 2-track/3-track sliding window with fixing of glass (excluding cost of glass) all complete as per architectural drawings and direction of Engineer-in-charge. 10-12 Micron thickness Annodizing film Natural white |
| 38 | Supplying bubble free float glass of approved make and brand conforming to IS: 2835-1987.ii) 4mm thick coloured / tinted / smoke glass. |
| 39 | Supplying, fitting and fixing fibre reinforced polymer (FRP) Composite door frame as per approved section with glass fibre reinforced plastic moulded skins and a special sandwich core, so as to impart monolitaheic composite structure as per approved technology of Department of Science and Technology (DST) tosafisfy IS: 4020 door testing performance criteria..(i) 66mm x 90mm |
| 40 | Supplying, fitting & fixing fibre reinforced polymer (FRP) Composite door shutters as per approved design with glass fibre reinforced plastic moulded skins and a special sandwich core, so as to impart monolitaheic composite structure asper approved technology of Department of Science and Technology (DST) to satisfy IS:4020 door testing performance criteria.In ground floor.(i) 32 mm thick |
| 41 | Scraping of moss, blisters etc.thoroughly from exterior surface of walls necessitating the use of scraper, wire brush etc.(Payment against thisitem will be made only when this has been done on the specific direction of the Engineer-in-charge) |
| 42 | Applying Exterior grade Acrylic primer of approved quality and brand on plastered or cencrete surface old or new surface to receive decorative textured (matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC.In Ground Floor:(a) One Coat |
| 43 | In 1st floor |
| 44 | In 2nd floor |
| 45 | In 3rd Floor |
| 46 | Protective and Decorative Acrylic exterior emulsion paint of approved quality, as per manufacturer's specification and as per direction of Engineer-in-Charge to be applied over acrylic primer as required. The rate includes cost of material, labour, scaffolding and all incidentalcharges but excluding the cost of primer.In Ground floor (Two Coat)b) Premium 100% Acrylic Emulsion |
| 47 | In 1st floor |
| 48 | In 2nd floor |
| 49 | In 3rd Floor |
| 50 | Reparing collapsible gate by cutting out all rivets as necessary reassambling all members including welding pieces of channels, sraightening bent bars and rivetting with new rivets and fitting inposition and painting two coats. |
| 51 | (a) Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. |
| 52 | (A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :(b) On steel or other metal surface :With super gloss (hi-gloss) (iv) Two coats (with any shade except white) |
| 53 | Taking out rain water down pipe. |
| 54 | Supplying, fitting & fixing UPVC pipes A- Type and fittings conforming to IS:13592-1992 with all necessary clamps nails, including making holes inwalls, floor etc. cutting trenches in any soil through masonry concrete structures etc if necessary and mending good damages including joining with jointing materails (Spun Yarn, Valamoid/Bitumen/M-Seal etc) completeA) UPVC Pipes:(ii) 110 mm. Dia. |
| 55 | B) UPVC Fittings:c) Bend 87.5 degree(ii) 110 mm. Dia. |
| 56 | d) Shoe(ii) 110 mm. Dia. |
| 57 | Removing old scales, blisters etc. of interior surface of walls,ceiling by scraping etc. and preparing smooth and even surface with rendering or cement mortar (1:2) (as necessary), to make the surface suitable for receiving distemper. (Payment against this item will be made only when this has been done on the specific direction of the Engineer-in-charge). |
| 58 | (b) Rendering the surface of walls and ceiling with white cement based wall putty of approved make and brand(1.5mm thick) |
| 59 | Applying Interior grade Acrylic Primer of approved quality and brand on plastered or cencrete surface old or new surface to receive Distemper/ Acrylic emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC. (In Ground Floor)(a) One Coati) Water based interior grade Acrylic Primer |
| 60 | Applying Acrylic Emulsion Paint of approved make and brand on walls and ceiling including sand papering in intermediate coats including putty (to be done under specific instruction of Superintending Engineer) : (Two coats) i) Standard Quality |
| 61 | Welding in M.S. structural work with gas or electric:(b) Continuous weld. |
| 62 | Removal of rubbish,earth etc. from the workingsite and disposal of the same beyond thecompound, in conformity with the Municipal /Corporation Rules for such disposal, loading intotruck and cleaning the site in all respect as perdirection of Engineer in charge |
| 63 | Sub Total |
| 64 | GST 18% |
| 65 | CESS 1% Please Enable Macros to View BoQ information |