| 1 | Earth work in cutting or in embankment in ordinary soil, excavation to be in the form of regular pits and earth work in embankment to be in 20 cm layers. Including ramming and dressing the surface to the required levels and slopes and also including 1.50 m lift and 30 m lead. The earth from cutting to be used in making embankment or to be deposited as spoil bank within 30 m distance as per directed by Engineer-in-charge |
| 2 | Earth work in embankment By Power Transported earth With a Lead Beyond 200 M and including excavation, loading, unloading, royalty, ramming, manual compaction ,dressing and all lead & lift etc. complete as per directed by Engineer-in-charge |
| 3 | Supply of New HDPE/PP Bags Woven Confirming to I.S. 11652: 2000 of Cement Bag Size i/c cost of material carriage loading, unloading, stacking, all taxes etc. required for completion of work as per directed by Engineer-in-charge. |
| 4 | Filling Of HDPE/ PP Bags with RBM/Silt/Earth , Machine Sewing and Placing with or Without N.R.C. Within 60.00 m I/C Cost of Material Carriage , labour, Loading , Unloading Stacking, Royality all Taxes etc . required for completion of work as per directed by Engineer-in-charge. |
| 5 | Supply of Nylon rope crate size (1.0x1.0x1.0)m with mesh size 20.00x20.00 cm and weight not less than 300 gram per no.with contractor profit i/c cost of material, carriage, loading, unloading, stacking, T&P and All Taxes etc. required for completion of work as per directed by Engineer-in-charge. |
| 6 | Collection of Silt/sand from river bed at river Bank by Mud Pump i/c Cost of stacking , T&P and laying and filling with Dressing , Levelling, etc required for completion of work as per directed by Engineer-in-charge. |
| 7 | Supplying and Filling of GEO Bags made of 200 GSM Woven Febric Confirming to 15351 ( 2015) of size 1.09m x0.69m at site for placing in Appron , Geo bag shall be filled with RBM / Silt/ Sand Collected from River by using Mud - Pump and placed with or without Gabion Rope Crate I/C cost Of Material, Carrige , Loading , Unloading , stacking all Taxes etc but Excluding cost of Gabion required for completion of work as per directed by Engineer-in-charge. |
| 8 | Supply of 9mm, 4 Strands Polypropylene Rope Gabian Size (1.8 M X 1.8 M X 0.50) with lid only,150X150 mm mesh size confirming to I.S. 5175:1992 (Reaffirmed 1997) at work site with contractors proffit i/c cost of material, carriage, loading, unloading, stacking, T&P required for completion of work as per directed by Engineer-in-charge. |
| 9 | Supplying and Laying of Geotextile sheet made of 250 GSM Non- Woven Multiflament polypropylene yarn I/C preparation of surface all cost of Labour,material and T&P with all texes etc required for completion of work as per directed by Engineer-in-charge. |
| 10 | Laying & Packing Agra cut stone 20 to 40 kg. weight in spur i/c cost of labour, T&P , all lead , lift with all taxes etc complete in all respect. |
| 11 | Dry stone Slope Pitching with Agra Cut Stone 20-40 Kg. Wt. hand packed i/c cost of carriage,labour , T&P & taxes etc.excluding cost of stone with complete in all respect as per directed by Engineer-in-charge. |
| 12 | Supply of Agra cut stone 20 to 40 kg weight at Site i/c all cost of material , carriage , labour, T&P, all taxes royality, loading, unloading, stacking etc.complete in all respect as per directed by Engineer-in-charge. |
| 13 | Uprooting Jhunds from Daula of Near Dhak Nagla at Chandanpur Husainpur tatbund i/c disposal all materials as directed-by-Engineer in incharge. |
| 14 | Brick soling with straight over burnt bricks laid on edge and dry including preparation of subgrade to prescribed camber and including supply of bricks, filling joints with local earth, spreading blinding coat of 1 cm (3/8\\") depth of local earth of P. I. 5 to 7 or sand over the entire surface and including labour t&p etc. required for proper completion of work as per directed by Engineer-in-charge. Please Enable Macros to View BoQ information |