|
| 1 | New HT line |
| 2 | AAAC 7/3.81 mm (80mm²) |
| 3 | Steel Tubular Pole (9 mtr.) |
| 4 | Muffs with concerete filling |
| 5 | Run Thro' Structures (∆ Formation): on Single Pole Structures (Adopt Eight (8) No. Run -through Structures per Km)- |
| 6 | Cross Arm: [Channel Iron (100x50x6 mm), Length (1270) mm i/c tolerance of 100mm either side x 8 structure |
| 7 | Angel Iron (50x50x6 mm), Length (2x750) mm x 8 structure |
| 8 | Pole top Bracket |
| 9 | 11 KV Pin Insulators (Porcelain, 12 KV, 10 KN): 3 No per pole structure |
| 10 | Dead End Structures: (Adopt three (3) No. per Km) on Double Pole (Prefer along road side) |
| 11 | Belt Set- MS Angle Iron : 50X50X6, Length 1800mm X 2 No. |
| 12 | X-Bracing Set - MS Angle Iron: 50x50x6, Length [2125 mmx 2 No.] |
| 13 | X-Arm (Horizontal)- MS Channel Iron: 100X50X6, Length 2340mm X 2 No. |
| 14 | Discs insulator sets on Dead End structures (comprising 1 No. Disc: (Porcelain, BS, 12 KV, 80 kN) including Dead End Clamps etc.) x (3 No. conductors) x (2 No. sides) |
| 15 | HT Stay / Guy Arrangement |
| 16 | Stay set complete in all repect (1 No. / Single Pole, 4 No. / Double Pole Structures) |
| 17 | Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set) |
| 18 | Earthing |
| 19 | HT Earthing set complete |
| 20 | GI 8 SWG Earth Wire |
| 21 | Cross lacing |
| 22 | Eye hook for Earth wire |
| 23 | Earth wire clamp |
| 24 | MS Channel Iron 75*40*6, Length 1500 mm for earth wire |
| 25 | Half Clamp |
| 26 | Full Clamp |
| 27 | Danger Plate (250x200x1.6 mm) |
| 28 | Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)] |
| 29 | Barbed Wire |
| 30 | Alluminium Paint |
| 31 | Prov. Megger 5000 v |
| 32 | GO AB Switch Unit (11kV, 400A, 25 KA ) |
| 33 | X-Arm: [Channel Iron (75x40x6 mm), Length: 2800mm x 4 No. for supporting GO Switch & DO Fuse Unit |
| 34 | Erection for HT line |
| 35 | Transportation for HT line |
| 36 | GST on Erection and Transportation Charges |
| 37 | New LT line |
| 38 | LT 3.5X120MM2 1.1 KV XLPE CABLE ARMOURED (double Circuit) |
| 39 | Steel Tubular Poles (8 mtr) |
| 40 | Muffs with concerete filling |
| 41 | Angle Iron (75x75 x6)mm2 length 1.50 mtr + 0.02 mtr |
| 42 | Capacitor Bank 36 kVAr |
| 43 | Cross Arm: [Channel Iron (100x50x6 mm), Length (1270) mm i/c tolerance of 100mm either side x 8 structure |
| 44 | LT Stay Set |
| 45 | Stay Wire (7/3.15 mm) |
| 46 | Full clamp [2 no. for A.I. 1no. For stay] |
| 47 | LT Cable Jointng kit for LV(tee and straight) |
| 48 | Cleat HDPE for cable support |
| 49 | Kit Kat I.C. 63 Amp |
| 50 | Earthing Set Complete |
| 51 | Pipe HDPE |
| 52 | Route and joint indicating stone |
| 53 | Cost of digging and restoratin charges |
| 54 | Nuts and Bolts of Various Sizes |
| 55 | Aluminium Paint |
| 56 | Prov. Tong tester |
| 57 | Erection for LT cable |
| 58 | Erection for Poles |
| 59 | Erection for LT Stay set |
| 60 | Erection for Earthing set |
| 61 | Transportation for LT line |
| 62 | GST on Erection and Transportation Charges |
| 63 | Distribution Transformer 250kVA |
| 64 | Distribution Transformer (Ordinary), 11/0.4 kV, 250 KVA |
| 65 | Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) |
| 66 | Muffs with concerete filling |
| 67 | X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] |
| 68 | MS Angle Iron (50x50x6 mm), Length : 2800 mm X 1 Nos] for LA's |
| 69 | X-Arm: [Channel Iron (75x40x4.8 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch |
| 70 | Transformer Bed, Belting & Knee Bracing |
| 71 | X Arm Channel Iron (100X50x6 mm), Length : 2800 mm x 2 Nos for Transformer Bed |
| 72 | X Arm Channel Iron (100X50x6 mm), Length : 460 mm x 2 Nos for supporting main channel of Transformer |
| 73 | MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos |
| 74 | MS Angle Iron (35X35x5 mm), Length : 460 mm x 2 Nos |
| 75 | MS Angle Iron (50X50x6 mm), Length : 950 mm x 2 Nos for Bed Knee Bracing |
| 76 | CT-PT Combined Unit with HT meter |
| 77 | CT-PT Combined Unit [PT:11 kV/110 V) ; CT:10-400/5A] |
| 78 | Energy meter 3 Phase 4 Wire CT PT Operated HT Meter |
| 79 | PVC Multistrand 4 mm² copper wire with Φ-1 inch GI |
| 80 | X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 |
| 81 | X-Arm: [Channel Iron (75x40x6 mm), Length : 2800 mm |
| 82 | X-Arm [Channel Iron (100x50x6 mm), Length : 460 mm |
| 83 | MS Angle Iron (50X50x6 mm), Length: 2800 mm x1 Nos |
| 84 | Transformer LT Distribution Box and G.O. fixing Assembly |
| 85 | MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos |
| 86 | MS Angle Iron (50X50x6 mm), Length : 450 mm x 1 Nos |
| 87 | GO Switch Handle supporting (Channel Iron (75x40x6mm), Length 460mm |
| 88 | GO AB Switch Unit (11kV, 400A, 25 KA ) tripple Pole O/D type |
| 89 | D.O Fuse Unit |
| 90 | Surge Arrester, 9 kV Station Class (Porcelain Type) |
| 91 | Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) |
| 92 | Stay set complete |
| 93 | Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set) |
| 94 | Pipe Earthing Set |
| 95 | LT Distribution panel box with MCCB and SFU for 250 KVA |
| 96 | Half Clamp (M.S. Flat 50X6 mm) |
| 97 | Full Clamps (M.S. Flat 50X6 mm) |
| 98 | Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)] |
| 99 | Aluminium Thimble |
| 100 | Aluminium Thimble |
| 101 | Danger Plate |
| 102 | Barbed Wire |
| 103 | LT Cable (3.5 Core) 185 mm² |
| 104 | Aluminium Paint. |
| 105 | LT Switched Capacitors 9 KVAr for 250 KVA (rate per KVAr) |
| 106 | Transformer Bed (Civil Work) & Chain Link fencing , Angle Iron ,Gate etc for transformer fencing |
| 107 | Erection charges for DTR |
| 108 | Transportation charges for DTR |
| 109 | GST on Erection and Transportation Charges Quantities are mentioned above are tentative and Actual Quantity shall be worked out after Check Survey to be carried out by the successful Tender and detailed Engineering and finalization of Tower location Chart.Payment shall be made as per Approved Bill of Material/Actual Quantities measured at site. Other Material like Distribution transformer, Poles (08 mtr & 09 mtr long), Full clamp, Half Clamp, LT & HT stay set, pole top bracket, Danger plate, Distribution panel box will be provided by HPSEBL Divisional Store. Please Enable Macros to View BoQ information |