| 1 | Earth work in excavation in foundation trenches in all sorts of soil (including mixed soil but excluding late rite and sand stone) including removing spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, leveling dressing and ramming the bottom, bailing out water as required complete (a) Depth of excavation not exceeding 1500 mm. |
| 2 | (A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) |
| 3 | Single brick flat soling of picked jhama bricks including ramming and dressing bed to Proper level and filling joints with local sand. |
| 4 | Cement Concrete with graded stone (30 mm size) excluding shuttering. In ground floor and foundation. (a) 1:3:6 proportion |
| 5 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant IS codes. In Ground Floor : (ii) River Bazree |
| 6 | Reinforcement for Reinforced Concrete work in the all sorts of structures including distribution bars, stirrups, binders etc. Including supplies of rods , initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation, basement and upto roof of ground floor/upto 4 m. (i) Tor Steel/Mild Steel I. SAIL/TATA/RINL |
| 7 | Hire and labour for shuttering with centering and necessary staging upto 4 m using approved stout and thick hard wood planks ……………. Fitting, fixing & striking out after completion of works (upto roof of groung floor) (a) 25 mm to 30 mm th. Wooden shuttering as per decision & direction of Engineer-in-Charge.a) with staging |
| 8 | Hire and labour for shuttering with centering and necessary staging upto 4 m using approved stout and thick hard wood planks ……………. Fitting, fixing & striking out after completion of works (upto roof of groung floor) (a) 25 mm to 30 mm th. Wooden shuttering as per decision & direction of Engineer-in-Charge.b) With out staging in foundation and plinth. |
| 9 | 125 mm th. brick work with 1st class bricks in cement mortar (1:4) in ground floor. |
| 10 | PWD(WB), BUILDING WORKS, Page-104, Item-13 a) M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows, railing etc. fitted and fixed with necessary screws and lugs in ground floor. (ii) Grill weighing above 16 Kg./sq.mtr and above |
| 11 | PWD(WB), BUILDING WORKS, Page-189, Item-1 Plaster (to wall, floor, celling etc.) with sand and cement morter including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor). [Excluding cost of chipping over concrete surface] (ii) With 1:4 cement morter (b) 10 mm thick plaster(a) 20 mm thick plaster |
| 12 | PWD(WB), BUILDING WORKS, Page-189, Item-1 Plaster (to wall, floor, celling etc.) with sand and cement morter including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor). [Excluding cost of chipping over concrete surface] (ii) With 1:4 cement morter (b) 10 mm thick plasterb) 10 mm thick |
| 13 | PWD(WB), BUILDING WORKS, Page-192, Item-15 Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc.NOTE:Cement 0.152 cu.m per100 sq.m. |
| 14 | PWD(WB), BUILDING WORKS, Page-197, Item-15 Applying decorative cement based paint of approved quality after preparing the surface including scraping the same thoroughly (plastered or concrete surface) as per manufacturer's specification. In Ground floor: (iii) Two coats. |
| 15 | PWD(WB), BUILDING WORKS, Page-48, Item-6 Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour.In ground floor 3 mm. thick topping (High polishing grinding on this item is not permitted with ordinary cement).(ii) 25 mm. thick |
| 16 | PWD(WB), BUILDING WORKS, Page-48, Item-6 M.S. structural works in roof trusses with tubular sections conforming to IS: 806-1968 & IS: 1161- 1998 cnnected to one another with bracket, gusset cleats as per design, direction of Engineer-in-charge complete including cutting to requisite size, fabrication with necessary metal arc welding conforming to IS: 816- 1969 & IS: 9595 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour reqired for the work including all incidental chages such as electricity charges, labour insurance charges etc. Payment to be made on the basis of calculated weight of structural tubular memebrs as specified in relevent IS code in finished work. Payment for gusset, bracket, cleat may be made by adding the actual weight of such items with weight of finished structural members. The rates are considered for a height of erection 8 m. / 2nd floor level from the ground. Add 1.5 % extra over the rate for each additional floor or 4m. beyond the initial 8 m. or part thereof. i) For trusses spanning up to 12.00 m |
| 17 | PWD(WB), BUILDING WORKS, Page-81, Item-9 Galvanised corrugated iron sheet work (excluding the supporting frame work) fitted and fixed with 10 mm. dia J or L hook-bolts, limpet and bitumen washers and putty complete with 150 mm. end lap and one corrugation minimum side lap. (Payment to be made on area of finished work)(GCI sheet to be supplied by contractor) (i) In Roof:- a) With 0.60 mm thick sheet |
| 18 | PWD(WB), BUILDING WORKS, Page-81, Item-10 Galvanised iron sheet ridging fitted with necessary bolts, screws, washers etc complete.(225mm end lapping) (B) 450 mm lapping each way (a) With 0.60 mm sheet |
| 19 | Supplying fitting and fixing of Signboard and cost of photograph (payment will be made as per voucher) |
| 20 | Add:- GST @ 18% |
| 21 | Add:- Labour Welfare Cess @ 1% Please Enable Macros to View BoQ information |