| 1 | Fitting one Additional V cross arm in existing single pole incl. conveyance of materials. |
| 2 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole incl. conveyance of materials. |
| 3 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. |
| 4 | Transporting LT ABC by hired vehicle to a distance up to 5 km and carring up to 2 drum including loading and un loading using crane |
| 5 | Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling. |
| 6 | Providing one Earth using earth pipe incl. digging & backfilling pit and supply of charcoal, salt, sand etc. |
| 7 | Additional rate for providing one disc set on any type of HT pole for making cut point. |
| 8 | Fitting one set AB switch and giving connection |
| 9 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP incl. conveyance of materials. |
| 10 | Drilling hole of various sizes on existing Channel/Cross Arm. |
| 11 | Fitting and erecting one HT DP using PSC pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads. |
| 12 | Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 13 | Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole incl. digging & back filling pits. |
| 14 | Fitting and erecting one HT PSC Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. |
| 15 | Fitting and erecting one HT A type Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. |
| 16 | Loading HT A type pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 17 | Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification). |
| 18 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. |
| 19 | Dismantling (without damage) one km LT Sph 2 wire OH line, cross arms, insulators and stacking the conductors in rolls. |
| 20 | Dismantling (without damage) one km LT 3ph 4 wire OH line, cross arms, insulators and stacking the conductors in rolls. |
| 21 | Dismantling (without damage) one km LT additional conductor line, cross arms, insulators and stacking the conductors in rolls. |
| 22 | Dismantling one section fuse |
| 23 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. |
| 24 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70+ 1 x 16+1x 50 sqmm with bare/insulated Messenger through existing poles |
| 25 | Stringing one km LT Sph 2 wire line (Rabbit) incl. fitting cross arm etc. removing touchings and conveyance of materials. |
| 26 | Stringing one km LT 3ph 5 wire line (Rabbit for Ph and Weasel for N&St.main) incl. fitting cross arm etc. removing touchings and conveyance of materials. |
| 27 | Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole and reconnecting. |
| 28 | Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion. |
| 29 | Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion. |
| 30 | Providing/Inserting 2 line spacer on the existing LT OH line. |
| 31 | Providing/Inserting 3 line spacer on the existing LT OH line. |
| 32 | Erection of suspension clamp for LT ABC of any size |
| 33 | Erection of Anchor clamp / dead end clamp for LT ABC of any size |
| 34 | Installation of Insulation piercing connector for main to service line main :16-95 sqmm, Tap : 4-35 sqmm |
| 35 | Installation of Insulation piercing connector for main to service line main :16-95 sqmm, Tap 16-95 sqmm |
| 36 | Singe Phase Satellite connectors upto 4 service main connections (25-95 ABC/2.5-25 sqmm SM wire-2No) |
| 37 | Fitting of one No. pole top service connection box of standard size (up to 4 way) using ss strap/B&N of suitable size in to the PSC/A poles at the standard height excluding giving connections |
| 38 | Transferring LT Sph 2/3 wire OH line to newly erected HT/LT pole and refitting all items to the new pole. |
| 39 | Transferring LT 3ph 4/5 wire OH line to newly erected HT/LT pole and refitting all items to the new pole. |
| 40 | Cutting trees beyond 60cm but upto and incl. 120cm girth, cutting branches, removing root completely and stacking (where space for falling trees is not enough). |
| 41 | Cutting trees beyond 30cm but upto and incl. 60cm girth, cutting branches, removing root completely and stacking (where space for falling trees is not enough). |
| 42 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite. |
| 43 | Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit. |
| 44 | Fitting and providing one Strut using HT PSC pole incl. digging & back filling pit. |
| 45 | Stringing of one km 3 PH 11kV line with XLPE Insulated ACSR Raccoon Please Enable Macros to View BoQ information |