|
| 1 | Truss Work at Working Womens Hostel, Mananthavady. Detailed Estimate |
| 2 | OD134624/2025-2026:Providing & fixing poly carbonate Solid plain sheet of 3mm thick as approved by the Engineer in charge and should be supplied in a single length of 12 m or as decided by the Engineer in charge. The sheets shall be fixed using self drilling/self tapping screw of size (5.5x55mm) with EPDM seal complete up to any pitch in horizontal/vertical/curved surfaces, but excluding the cost of purlins, rafters, trusses and including cutting to size and shapes where ever required also including scaffolding and safety measures up to the terrace floorDetails of cost for 190 sqmMATERIALS: |
| 3 | 10.16.1:Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes |
| 4 | OD135475/2025-2026:Providing and fixing PVC chain link fabric fencing of required width using mesh of 1.5 m wide and 3mm thick in required colour and shade |
| 5 | 4.2.3:Providing and laying cement concrete in retaining walls, return walls, walls ( any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts,buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc. up to floor five level, excluding the cost of centering, shuttering and finishing:1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 6 | 13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work |
| 7 | 13.9.1:Cement plaster 1:3 ( 1 cement : 3 coarse sand) finished with a floating coat of neat cement.12 mm cement plaster |
| 8 | OD135203/2025-2026:Providing and fixing UPVC rain water gutter of make Aquastar/Euroguard or equivalentincluding fixing the pipe with clamps/ clips/ at 1.00 m spacing . This includes all necessary fittings and jointsand jointing of pipes with one step UPVC solvent cement and testing of joints complete as per direction ofEngineer-in-Charge 6 inches square type - External work- ExposedDetails of cost for 10.00 meterMATERIALS: |
| 9 | OD135204/2025-2026:Providing and fixing PVC pipes including fixing the pipe with clamps/ clips/ at 1.00 mspacing. This includes all kinds of necessary fittings and joints and jointing of pipes with one step PVCsolvent cement and testing of joints complete as per direction of Engineer-in-Charge 110 mm dia 6 Kgf/cm2 -External work- Exposed on wallDetails of cost for 10.00 meterMATERIALS: |
| 10 | 13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) |
| 11 | 15.13.1:Taking out doors, windows and clerestory window shutters (steel or wood ) including stacking within 50 metres lead:Of area 3 sq. metres and below |
| 12 | 50.6.1.9:Solid block masonry using pre cast solid blocks( Factory made) of size 40x20x15 cm or nearest available size confirming to IS 2185 part I of 1979 for super structure above floor two level upto floor five level with thickness 15cm in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete Please Enable Macros to View BoQ information |