Sales : +91-777 804 8217
| Sl. No. | Item Description |
| 1 | Elevation works |
| 2 | OD65595/2025-2026Finishing walls with Galtex textured exterior paint of required shade:New work (Two or more coats applied @ 3.28 ltr/ 10 sqm ) over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm |
| 3 | OD66337/2025-2026Providing and applying Galtex Texture with a base work of putty finish, one coat primer 2 coat base color and clear protection coat including cost of all materials,labour charges, plastering, conveyance, scaffolding etc complete as per the directions of Engineer in charge |
| 4 | 25.2Designing, fabricating, testing, protection, installing and fixing in position semi (grid) unitized system of structural glazing (with open joints) for linear as well as curvilinear portions of the building for all heights and all levels, including: a) Structural analysis & design and preparation of shop drawings for the specified design loads conforming to IS 875 part III (the system must passed the proof test at 1.5 times design wind pressure without any failure), including functional design of the aluminum sections for fixing glazing panels of various thicknesses, aluminium cleats, sleeves and splice plates etc. gaskets, screws, toggles, nuts, bolts, clamps etc.,structural and weather silicone sealants, flashings, fire stop (barrier)-cumsmoke seals, microwave cured EPDM gaskets for water tightness, pressure equalisation & drainage and protection against fire hazard including: b) Fabricating and supplying serrated M.S. hot dip galvanised / Aluminium alloy of 6005 T5 brackets of required sizes, sections and profiles etc. to accommodate 3 Dimentional movement for achievingperfect verticality and fixing structural glazing system rigidly to the RCC/ masonry/structural steel framework of building structure using stainless steel anchor fasteners/ bolts, nylon seperator to prevent bimetallic contacts with nuts and washers etc. of stainless steel grade 316, of the required capacity and in required numbers. c) Providing and filling, two part pump filled, structural silicone sealant and one part weather silicone sealant compatible with the structural silicone sealant of requiredbite size in a clean and controlled factory / work shop environment , including double sided spacer tape, setting blocks and backer rod, all of approved grade, brand and manufacture, as per the approved sealant design, within and all around the perimeter for holding glass. d) Providing and fixing in position flashings of solid aluminium sheet 1 mm thick and of sizes, shapes and profiles, as required as per the site conditions, to seal the gap between the building structure and all its interfaces with curtain glazing to make it watertight. e) Making provision for drainage of moisture/ water that enters the curtain glazing system to make it watertight, by incorporating principles of pressure equalization, providing suitable gutter profiles at bottom (if required), making necessary holes of required sizes and of required numbers etc. complete. This item includes cost of all inputs of designing, labour for fabricating andinstallation of aluminium grid, installation of glazed units, T&P, scaffolding and other incidental charges including wastages etc., enabling temporary structures and services, cranes or cradles etc. as described above and as specified. The item includes the cost of getting all the structural and functional design including shop drawingschecked by a structural designer, dully approved by Engineer-in-charge. The item also includes the cost of all mock ups at site, cost of all samples of the individualcomponents for testing in an approved laboratory, field tests on the assembled working structural glazing as specified, cleaning and protection till the handing overof the building for occupation. In the end, the Contractor shall provide a water tight structural glazing having all the performance characteristics etc. all complete asrequired, as per the Architectural drawings, as per item description, as specified, as per the approved shop drawings and as directed by the Engineerin- Charge. Note:- 1. The cost of providing extruded aluminium frames, shadow boxes, extruded aluminium section capping for fixing in the grooves of the curtain glazing and vermin proof stainless steel wire mesh shall be paid for separately under relevant items under this sub-head. However, for the purpose of payment, only the actual area of structural glazing (including width of grooves ) on the external face shall be measured in sqm. up to two decimal places. Note:-2. The following performance test are to be conducted on structural glazing system if area of structural glazing exceeds 2500 Sqm from the certified laboratories accreditated by NABL(National Accreditation Board for Testing and Calibration Laboratories), Department of Science & Technologies, India. Cost of testing is payable separately. The NIT approving authority will decide the necessity of testing on the basis of cost of the work, cost of the test and importance of the work. Performance Testing of Structural glazing system Tests to be conducted in the NBL Certified laboratories 1. Performance Laboratory Test for Air Leakage Test (-50pa to ? 300pa) & (+50pa to +300pa) as per ASTM E-283-04 testing method for a range of testing limit 1 to 200 mVhr? 2. Static Water Penetration Test. (50pa to 1500pa) as per ASTME- 331-09 testing method for a range up to 2000 ml.? 3. Dynamic Water Penetration (50pa to 1500pa) as per AAMA 501.01-05 testing method for a range upto 2000 ml? 4. Structural Performance Deflection and deformation by static air pressure test (1.5 times desing wind pressure without any failure) as per ASTME-330-10 testing method for a range upto 50 mm? 5. Seismic Movement Test (upto 30 mm) as per AAMA 501.4-09 testing method for Qualitative test? Tests to be conducted on site 6. Onsite Test for Water Leakage for a pressure range 50 kpa to 240 kpa (35psi) upto 2000ml? |
| 5 | 25.3Providing, assembling and supplying vision glass panels (IGUs) comprising of hermetically-sealed 6-12- 6 mm insulated glass (double glazed) vision panel units ofsize and shape as required and specified, comprising of an outer heat strengthened float glass 6mm thick, of approved colour and shade with reflective soft coating on surface # 2 of approved colour and shade, an inner Heat strengthned clear float glass 6mm thick, spacer tube 12mm wide, dessicants, including primary seal and secondary seal (structural silicone sealant) etc. all complete for the required performances, as per the Architectural drawings, as per the approved shop drawings, as specified and as directed by the Engineer-in-Charge. The IGUs shall be assembled in the factory/workshop of the glass processor. (Payment for fixing of IGU Panels in the curtain glazing is included in cost of item No.26.2) For payment, only the actual area of glasson face # 1 of the glass panels (excluding the areas of the grooves and weather silicone sealant) provided and fixed in position, shall be measured in sqm. (i) Coloured tinted float glass 6mm thick substrate with reflective soft coating on face # 2, + 12mm Airgap + 6mm Heat Strengthened clear Glass of approved make havingproperties as visible Light transmittance (VLT) of 25 to 35 %, Light reflection internal 10 to 15%, light reflection external 10 to 20 %, shading coefficient (0.25-0.28) and U value of 3.0 to 3.3 W/m2 degree K etc. The properties of performance glass shall be decided by technical sanctioning authority as per the site requirement |
| 6 | 25.4Extra for openable side / top hung vision glass panels (IGUs) including providing and supplying at site all accessories and hardwares for the openable panels as specified and of the approved make such as heavy duty stainless steel friction hinges, min 4 - point cremone locking sets with stainless steel plates, handles, buffers etc. including necessary stainless steel screws/ fasteners, nuts, bolts, washers etc. all complete as perthe Architectural drawings, as per the approved shop drawings, as specified and as directed by the Engineer-in-Charge. |
| 7 | 8.32Designing, fabricating, testing, installing and fixing in position Curtain Wall with Aluminium Composite Panel Cladding, with open grooves for linear as well as curvilinear portions of the building , for all heights and all levels etc. including: (a) Structural analysis & design and preparation of shop drawings for pressure equalisation or rain screen principle as required, proper drainage of water to make it watertight including checking of all the structural and functional design.(b) Providing, fabricating and supplying and fixing panels of aluminium composite panel cladding in pan shape in metalic colour of approved shades made out of 4mm thick aluminium composite panel material consisting of 3mm thick FR grade mineral core sandwiched between two Aluminium sheets (each 0.5mm thick). The aluminium composite panel cladding sheet shall be coil coated, with Kynar 500 based PVDF / Lumiflon based fluoropolymer resin coating of approved colour and shade on face # 1 and polymer (Service) coating on face # 2 as specified using stainless steel screws, nuts, bolts, washers, cleats, weather silicone sealant, backer rods etc. (c) The fastening brackets of Aluminium alloy 6005 T5 / MS with Hot Dip Galvanised with serrations and serrated washers to arrest the wind load movement, fasteners, SS 316 Pins and anchor bolts of approved make in SS 316, Nylon separators to prevent bi-metallic contacts all complete required to perform as per specification and drawing The item includes cost of all material & labour component, the cost of all mock ups at site, cost of all samples of the individual components for testing in an approved laboratory, field tests on the assembled working curtain wall with aluminium composite panel cladding, cleaning and protection of the curtain wallwith aluminium composite panel cladding till the handing over of the building for occupation. Base frame work for ACP cladding is payable under the relevant aluminiumitem.s The Contractor shall provide curtain wall with aluminium composite panel cladding, having all the performance characteristics all complete , as per theArchitectural drawings, as per item description, as specified, as per the approved shop drawings and as directed by the Engineer-in-Charge. However, for the purpose of payment, only the actual area on the external face of the curtain wall with Aluminum Composite Panel Cladding (including width of groove) shall be measured in sqm. up to two decimal places. |
| 8 | Landscaping |
| 9 | 23.4.1Supplying, assembling, lowering and fixing in vertical position in bore well unplasticized PVC medium well screen (RMS) pipes with ribs, conforming to IS:12818, including hire & labour charges, fittings & accessories etc. all complete, for all depths, as per direction of Engineer - in-charge100 mm nominal size dia |
| 10 | 30.2.2Supplying and stacking of good earth at site including royalty and carriage upto 5 k.m. lead complete(earth measured in stacks will be reduced by 20% for payment). |
| 11 | 30.2.3Supplying and stacking sludge at site including royalty and carriage upto 5 k.m. lead complete (sludge measured in stacks will be reduced by 8% for payment). |
| 12 | 30.2.14.1Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume ofearth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately) :Holes 1.2 m dia and 1.2 m deep |
| 13 | 30.2.4.1Supplying and stacking at site dump manure from approved source, including carriage upto 5 k.m. lead complete (manure measured in stacks will be reduced by 8% for payment) :Screened through sieve of I.S. designation 20 mm |
| 14 | 30.2.8Spreading of sludge, dump manure and/or good earth in required thickness as per direction of officer-in-charge (cost of sludge, dump manure and/ or good earth to bepaid separately). |
| 15 | 30.2.9Mixing earth and sludge or manure in the required proportion specified or directed by the Officer-in-charge |
| 16 | OD80287/2025-2026Providing & laying Selection no. 1 grass turf with earth 50mm to 60mm thickness of existing ground prepared with proper level and ramming with tools wooden and than rolling the surface with light roller make the surface smoothen and light watering the same, with sprinkler and maintenance for 30 days or more till the grass established properly as per direction of officer in charge.(data from DAR 30.2.34) |
| 17 | Interior Works |
| 18 | OD66416/2025-2026Supply and fixing of Centre Table to detail of size (900 dia mm) made out of 4 nos 50 x 25 mm steam beach wood leg and interconnected at top and bottom with 25 x 25mm steam beach wood and finished with melemine polish. Top finished with 10 mm thick clear float glass, neatly and complete as per drawing |
| 19 | OD66417/2025-2026Providing and fixing Service table of 1800 x 750/900 x 750/900mm high to detail as per drw. Comprising table top out of 18mm com. ply with stiffner.Table top sidefinished with 18mm thick granite of approved colour and shade. On front and side of drawer finished with 1mm thick laminate and additional 18mm com. ply is fixed on front side to pattern with necessary grooves and finished with 1mm thick laminate of approved colour and shade.One set of 4 drawers about 450mm wide, 712.5mm high and 600mm deep to shape supported with 18mm com. ply at bottom, sides and rear. 4 nos. of drawers out of which 3 nos. of equal height and 1no. drawer at the top most of 75mm high made out of 12mm thick Com. ply finished with 1mm thick laminate at front side with necessary boxing, wpc lowered panel, teak wood lipping telescopic drawer slides, locking arrangements, 100mm long brush finish SS handles, etc., complete.All concealed faces of comply finished with one coat of wood preservative paint and exposed faces of Second class teak wood beadings finished with two coats of duco paint to the satisfaction of the Client/ Architect. Table, Drawer, storage and cupboard inside should be finished with 0.8mm thick laminate of approved colour and shade. |
| 20 | OD66426/2025-2026Providing and fixing centre table to detailed drawing of overall size 1500mm x 900mm and 750mm height made out of 25mm thk preliminated particle board of approved colour and shade with necessary supports |
| 21 | OD66429/2025-2026 Providing centre Table chair of approved make |
| 22 | OD66431/2025-2026Supply and fixing of Double cot size 2200mm x 2000mm using padakwood for internal main framework, 18mm comply for the side, head board, footboard, finished4mm decorative veneer of approved shade including moulding beading along the edges and polishing with melamine matt finish with below storage slidingarrangement |
| 23 | OD66468/2025-2026Providing and fixing mirror in toilets with ply backup of thickness 8 - 12mm with beading all around. |
| 24 | OD66467/2025-2026Supplying, providing and fitting curtain for windows of 4.20 m width and 2.10 m height with border and ring model connecting in steel pipe with side wooden designincluding stitching charge, fitting charges etc complete |
| 25 | OD66466/2025-2026Supply and installation of Side Table of size 450 X 450 X 300 (ht) , The table top out of 25 mm BWR ply with 1 mm thick laminated table top. Desktop to be supported with Metal Legs. Additional supports viz, Steel angles etc should be considered if required. All finishes/ colors, as approved (including metal powder coating) to be factory finished. |
| 26 | OD66465/2025-2026Providing and fixing full height wooden self unit with shutter of 25 mm thick BWR ply with laminate finish of size 2100 mm high and 450 mm deep to detail comprising 19 mm thick BWR ply for top,sides, 4 intermediates and bottom at 75mm level. Storage back 19mm thick BWR ply finished with 1mm thick laminate and 4 horizontal grooves in shutters front of 6 mm x 6 mm also with half round nosing laminated edge finish of required leaves with necessary, TW lipping, box type hinges, tower bolts, locking arrangements, ball catch, 150mm long SS Brush Finish handle etc., complete All concealed faces of BWR ply finished with one coat of wood preservative paint and exposed faces of Steam beach beading polished to the satisfaction of the Architects. The inner side of the storage finished with 1mm thick Laminate |
| 27 | OD66464/2025-2026Providing and fixing Low height closed shelved storage unit of 400mm depth x 600 - 900mm height with 1 intermediate shelf using 19mm BWR ply finished with 1mm laminate of approved shade both internally and externally finish with necessary, TW lipping, hinges, tower bolts, locking arrangements, ball catch, 150mm long SS Brush Finish handle etc., complete as per the architect detail drawing. |
| 28 | OD66463/2025-2026Providing and fixing of approved make of blinds with Approved design and shade. Basic cost of blinds should not be less than Rs.800 per Sqm Note: measurement of blinds area shall be considered the opening size of windows only |
| 29 | OD66462/2025-2026Providing and fixing wall paper of approved design with necessary fixing arrangements |
| 30 | OD66515/2025-2026Providing and fixing Reception table of 5500 x 750/900 x 750/900mm high to detail as per drw. Comprising table top out of 18mm com. ply with stiffener of same com.ply 100mm wide below the table and 10 x 37mm. Second class teak wood beadings finished with two coats of duco paint to shape along edges.Table top finished with 1mm thick laminate of approved colour and shade. On front and side of drawer finished with 1mm thick laminate andadditional 18mm com. ply is fixed on front side to pattern with necessary grooves and finished with 1mm thick laminate of approved colour and shade.Foot rest cum CPU stand of required length with same 18 mm com. Ply finished with 0.8mm thick laminate. Keyboard tray made out of 18 mm com.ply finished with 1mm thick laminate of approved colour and shade. 50mm Dia SS wire manager of approved quality three set of 4 drawers about 450mm wide, 712.5mm high and 600mm deep to shape supported with 18mm com. ply at bottom, sides and rear. 4 nos. of drawers out of which 3 nos. of equal height and 1no. drawer at the top most of 75mm high made out of 12mm thick Com. ply finished with 1mm thick laminate at front side with necessary boxing, wpc lowered panel, teak wood lipping telescopic drawer slides, locking arrangements, 100mm long brush finish SS handles, etc., complete.All concealed faces of comply finished with one coat of wood preservative paint and exposed faces of Second class teak wood beadings finished with two coats of duco paint to the satisfaction of the Client/ Architect. Table, Drawer, storage and cupboard inside should be finished with 0.8mm thick laminate of approved colour and shade. |
| 31 | OD66510/2025-2026Supply and installation of three seater sofa of size 1525Lx850Dx760H made of matte finish rubber wood legs and framework of maranti hardwood, upholstered with approved colour of leatherette semi PU 1mm thick with backing seat of 6\\" premium density foam of 28kg/m3 cushion and back cushion of hollow siliconized conjugated fibre polyster of 15 density. |
| 32 | Landscaping lighting |
| 33 | OD69840/2025-2026Supplying and providing LED Luminaire type down lighter No-111326 BZSLO 12W NW including cost convenience labour charges etc.as per the direction of the engineering charge |
| 34 | OD70226/2025-2026Supplying and providing Rigid led with acrylic covering Linear 10W/ mtr. led strip light mounted on aluminium channel completed with frosted acrylic covering on thetop with suitable driver,2700K colour temperature of model MDK-S-007,15 Watt/m wattage |
| 35 | OD70230/2025-2026Supplying and providing Path Illuminator Single sided surface mounted path illuminator with weather resistant finish complete with 6W LED with suitable remote driver, IP 65 rating, Size 200mm D approx of model MDK-I003, 6 Watt, 2700 K colour temperature |
| 36 | OD70243/2025-2026Supplying and providing Tree branches illuminator with strap, Tree branches uplighter with weather resistant finish suitable for outdoor application completed withcomplemented with toughened glass and strap facility complete with 9W LED with suitable driver, IP 67 rating of model<br>MDK-S-002, 9 Watt, 2700 K colourtemperature |
| 37 | OD70244/2025-2026Supplying and providing In ground tree uplighter with weather resistant finish suitable for outdoor application completed with complemented with toughened glasscomplete with 9W LED with suitable driver, IP 67 rating of model MDKB-001, 9 Watt, 2700 K colour temperature |
| 38 | OD70247/2025-2026Supplying and making end termination with brass compression gland &aluminium lugs for following size of PVC insulated and PVC sheathed / XLPE aluminium conductor cable of 1.1 KV grade as required 4X 16 sq mm |
| 39 | OD70248/2025-2026Laying of one number PVC insulated and PVC sheathed / XLPE power cable of 1.1 KV grade of following size direct in ground including excavation, sand cushioning,protective covering and refilling the trench etc as required 4X 16 sq mm |
| 40 | OD70250/2025-2026Laying of one number PVC insulated and PVC sheathed / XLPE power cable of 1.1 KV grade of following size direct in ground including excavation, sand cushioning,protective covering and refilling the trench etc as required 3.5X 25 sq mm |
| 41 | Old Building Works |
| 42 | 13.80Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. |
| 43 | 13.48.1Finishing with Deluxe Multi surface paint system for interiors and exteriors using primer as per manufacturers specifications:Two or more coats applied on walls @1.25 ltr/10 sqm over and including one coat of special primer applied @ 0.75 ltr /10 sqm |
| 44 | 22.3Providing and laying water proofing treatment to vertical and horizontal surfaces of depressed portions of W.C. kitchen and the like consisting of : i) I course of applyingcement slurry @ 4.4 Kg/ sqm mixed with water proofing compound conforming to IS: 2645 in recommended proportions including rounding off junction of vertical andhorizontal surface. ii) II course of 20 mm cement plaster 1:3 ( 1 cement : 3 coarse sand) mixed with water proofing compound in recommended proportion including rounding off junction of vertical and horizontal surface. iii) III course of applying blown or residual bitumen applied hot at 1.7 kg per sqm of area. iv) IV course of 400 micron thick PVC sheet. (Overlaps at joints of PVC sheet should be 100 mm wide and pasted to each other with bitumen @ 1.7 Kg/ sqm. |
| 45 | 22.7.1Providing and laying integral cement based water proofing treatment including preparation of surface as required for treatment of roofs, balconies, terraces etc.consisting of following operations: a) Applying a slurry coat of neat cement using 2.75 kg/ sqm of cement admixed with water proofing compound conforming to IS:2645 and approved by Engineer-in-Charge over the RCC slab including adjoining walls upto 300 mm height including cleaning the surface before treatment. b) Laying brick bats with mortar using broken bricks/brick bats 25 mm to 115 mm size with 50% of cement mortar 1:5 ( 1 cement : 5 coarse sand ) admixed with water proofing compound conforming to IS: 2645 and approved by Engineer-in-Charge over 20 mm thick layer of cement mortar of mix 1:5 ( 1 cement : 5 coarse sand ) admixed with water proofing compound conforming to IS: 2645 and approved by Engineer - in- Charge to required slope and treating similarly the adjoining walls upto 300 mm height including rounding of junctions of walls and slabs c) After two days of proper curing applying a second coat of cement slurry using 2.75 kg/ sqm of cement admixed with water proofing compound conforming to IS : 2645 and approved by Engineer-in-Charge. d) Finishing the surface with 20 mm thick jointless cement mortar of mix 1:4 (1 cement : 4 coarse sand ) admixed with water proofing compound conforming to IS: 2645 and approved by Engineer - in- Charge including laying glass fibre cloth of approved quality in top layer of plaster and finally finishing the surface with trowel with neat cement slurry and making pattern of 300x300 mm square 3 mm deep. e) The whole terrace so finished shall be flooded with water for a minimum period of two weeks for curing and for final be flooded with water for a minimum period of two weeks for curing and for final test. All above operations to be done in order and as directed and specified by Engineer in Charge:With average thickness of 120 mm and minimum thickness at khurra as 65 mm |
| 46 | 22.23.1Providing and applying integral crystalline slurry of hydrophilic in nature for waterproofing treatment to the RCC structures like retaining walls of the basement, water tanks, roof slabs, podiums, reservior, sewage & water treatment plant, tunnels/ subway and bridge deck etc., prepared by mixing in the ratio of 5 : 2 (5 parts integral crystalline slurry : 2 parts water) for vertical surfaces and 3 : 1 (3 parts integral crystalline slurry : 1 part water) for horizontal surfaces and applying the same from negative (internal) side with the help of synthetic fiber brush. The material shall meet the requirements as specified in ACI-212-3R-2010 i.e by reducing permeability of concrete by more than 90% compared with control concrete as per DIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystalline slurry shall be capable of self-healing of cracks up to a width of 0.50mm. The workshall be carried out all complete as per specification and the direction of the engineer in charge. The product performance shall carry guarantee for 10 years against any leakage.For vertical surface two coats @0.70 kg per sqm |
| 47 | 4.1.8Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 48 | 11.41.3Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS :15622, of approved make, in all colours and shades, laid on 20 mm thick cement mortar 1:4(1 cement : 4 coarse sand), including grouting the joints with white cement and matching pigments etc., complete.Size of Tile 800x 800 mm |
| 49 | 2.8.1Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil |
| 50 | 5.3Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills,staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 51 | 5.22.6Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more |
| 52 | 5.9.5Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers |
| 53 | 50.6.2.1Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x15 cm or nearest available size confirming to IS 2185 part I of 1979 for foundation andplinth with thickness 15cm in: CM 1:6 ( 1 cement :6 coarse sand) etc complete |
| 54 | 5.9.3Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform |
| 55 | 13.1.112 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) |
| 56 | 8.2.2.2Providing and fixing 18 mm thick gang saw cut, mirror, polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, faciasand similar locations, of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 ( 1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels.Area of slab over 0.50 sqm |
| 57 | 8.3.1Providing edge moulding to 18 mm thick marble stone counters, vanities etc., including machine polishing to edge to give high gloss finish etc. complete as perdesign approved by Engineer -in-Charge.Marble work |
| 58 | 10.28 Providing and fixing stainless steel (Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and makingcurvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-incharge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) |
| 59 | OD381758/2025-2026Supplying and fixing honey comb door press steel door (1 x 2.1m) of standard pattern with frame 4 x 2.5 inch as per profile of IS 4351 of section 105 x 60 mm and shutters made of section 75 x 30cm for outer styles and horizontal members with zinc cromate primer coat measured in sequence metre totally including all fittings and all charges for fixing handle but hinges etc. complete |
| 60 | OD381759/2025-2026Supplying and fixing double door press steel door (1.2 x 2.1 inch) of standard pattern with frame (6 x 4 inch)as per profile of IS 4351 of section 105 x 60 mm and shutters made of section 75 x 30cm for outer styles and horizontal members with zinc cromate primer coat measured in sequence metre totally including all fittings and all charges for fixing handle but hinges etc. complete |
| 61 | Ornamental Lighting |
| 62 | OD70408/2025-2026Providing and fixing Ornamental Light fittings using quality type K9 Crystal ball 40mm Borosilicate hollow glass rode 12mm Stainless steel mirror finish silver baseE-14 holder. Translucent plastic coated steel thread O shaped small size 12mm SS 304 grade ring of size 15 inch Height, 5 feet Length, 2 feet Width etc all complete as per the Direction of Engineer in charge. |
| 63 | OD70413/2025-2026Providing and fixing Ornamental Light fittings using quality type K9 Crystal ball 40mm Borosilicate hollow glass rode 12mm Stainless steel mirror finish silver baseE-14 holder. Translucent plastic coated steel thread O shaped small size 12mm SS 304 grade ring of size 9 feet diameter and 3 feet height etc all complete as per theDirection of Engineer in charge. |
| 64 | OD70414/2025-2026Providing and fixing Ornamental Light fittings using quality type K9 Crystal ball 40mm Borosilicate hollow glass rode 12mm Stainless steel mirror finish silver baseE-14 holder. Translucent plastic coated steel thread O shaped small size 12mm SS 304 grade ring of size 2 feet Height, 8 feet Length and 4 feet Width etc all complete as per the Direction of Engineer in charge. |
| 65 | OD70416/2025-2026Providing and fixing Ornamental Light fittings using quality type K9 Crystal ball 40mm Borosilicate hollow glass rode 12mm Stainless steel mirror finish silver baseE-14 holder. Translucent plastic coated steel thread O shaped small size 12mm SS 304 grade ring of size 9 feet diameter and 2 feet height etc all complete as per theDirection of Engineer in charge |
| 66 | Retaining wall |
| 67 | 2.6.1Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, as directed by Engineer-in-charge.All kinds of soil |
| 68 | 4.1.8Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 69 | 5.1.2Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources |
| 70 | 5.2.2Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 71 | 5.22.6Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo Mechanically Treated bars of grade Fe-500D or more |
| 72 | 5.9.2Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. |
| 73 | 13.1.112 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) |
| 74 | 13.48.1Finishing with Deluxe Multi surface paint system for interiors and exteriors using primer as per manufacturers specifications:Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of special primer applied @ 0.75 ltr /10 sqm Please Enable Macros to View BoQ information |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail