The work consists supply and construction of Small UG Amn Bunker (Precast) of size 7.00 x 3.60, with 750mm OHP (earth used for filling should be free from boulders). The clear ht of structure measured above floor level upto roof is 3.60m.Note :- All materials make list attached in RFP for ref .Vendor Should provide raw material assurance certificate of all items.2. Design Data (Pre-Cast One Box)-2.1 Length - 1.0 mtr Minimum (External dimensions)2.2 Width - 3.6 mtr (inner dimensions)2.3 Height - 3.6 mtr (inner dimensions)3. Design criteria.3.1 Seismic Co-efficient – As per Seismic Zone V.3.2 Snow load - 1.5 feet standing on roof.3.3 Wind load - Equivalent to wind speed of 55 mtrs/sec as per IS-875- 2015(reaff- 2020)3.4 Roof slope - As per Drawing attached.3.5 External temperature – (-) 400C to + 350C.3.6 Water absorption/Penetration – Nil and adequate sealing material be provided.3.7 Termite proofing – Termite proof.3.8 Ease of construction – Should be modular in design.3.9 Design load – As per IS 875-2015 (reaff 2020).4. Excavation. Excavation upto required level to be done by vendor in any type of soil i.e. hard rock / soft rock / hard dense / dense etc as directed by Accepting officer. The contractor will deploy his own resources for digging and levelling of ground. The excavated earth will be disposed off as directed by the Accepting Officer at an appropriate site as governed by local Adm guidelines or as directed by the Accepting Officer. Nos 01Levelling: - Before excavation for foundation, top surface area of GL will be made levelled over truly rammed earth etc as per technical specification and drawing attached at tender documents. Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.