| 1 | Civil Works |
| 2 | OD392814/2025-2026Modified 51.2.4 Filling with Sand Supplying and filling sand in foundation trenchesfor stabilizing the top clay layer including watering, ramming, consolidating anddressing, etc complete forimproving bearing capacity of soil. |
| 3 | OD392813/2025-2026Filling with 20mm aggregate- Supplying and filling 20mm aggregate in foundationtrenches for stabilizing the top clay layer including watering, ramming, consolidatingand dressing, etc complete for improving bearing capacity of soil. |
| 4 | OD392812/2025-2026Filling with 6mm aggregate- Supplying and filling 6mm aggregate in foundationtrenches for stabilizing the top clay layer including watering, ramming, consolidatingand dressing, etc complete for improving bearing capacity of soil. |
| 5 | OD387336/2025-2026Providing stone columns of 100 mm diameter formed with 10 mm and down-gradedstone aggregates, placed at 27.5 cm centre-to-centre, using disposable mild steel (MS)cone of 1.20 mm thickness of suitable size at the bottom, including cost andconveyance of all materials, MS cone, labour, tools, plant, loading, unloading, and allincidental charges, complete as per the directions of the departmental officers at site. |
| 6 | 4.1.8Providing and laying in position cement concrete of specified grade excluding thecost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mmnominal size derived from natural sources) |
| 7 | 5.33.1.1Providing and laying in position ready mixed or site batched design mix cementconcrete for reinforced cement concrete work; using coarse aggregate and fineaggregate derived from natural sources, Portland Pozzolana / Ordinary Portland/Portland Slag cement, admixtures in recommended proportions as per IS: 9103 toaccelerate / retard setting of concrete, to improve durability and workability withoutimpairing strength; including pumping of concrete to site of laying, curing, carriagefor all leads; but excluding the cost of centering, shuttering, finishing andreinforcement as per direction of the engineer-in-charge; for the following grades ofconcrete. Note: Extra cement up to 10% of the minimum specified cement content indesign mix shall be payable separately. In case the cement content in design mix ismore than 110% of the specified minimum cement content, the contractor shall havediscretion to either re-design the mix or bear the cost of extra cementAll work upto plinth levelConcrete of M25 grade with minimum cement content of330 kg /cum |
| 8 | 5.22.6Steel reinforcement for R.C.C work including straightening, cutting, bending, placingin position and binding all complete upto plinth levelThermo - Mechanically Treatedbars of grade Fe-500D or more |
| 9 | 5.9.1Centering and shuttering including strutting, etc. and removal of formfor:Foundations, footings, bases of columns, etc for mass concrete |
| 10 | 50.2.3.1Pumping or Bailing out water and removing slush etc by using pump set includingcost of labour, oil hire charges of pumpset, etc complete |
| 11 | EXCLUSIVE OF GST |
| 12 | Note :1 All materials, Items, Equipment shall be best branded items with IS and approved by client/KEL |
| 13 | 2:Rate should be inclusive of Insurance,Transportation, delivery and installation cost for all items |
| 14 | 3.Rate should be Exclusive of GST. |
| 15 | 4.Work should be executed as per DSR/PWD specification and direction of Engineer at site. |
| 16 | 5.CEMENT: Make use Malabar cement only as per Govt. direction and in case of non availabilty of Malabar cement use Ultra Tech, Dalmia, Ramco or eq. brand in the order of preference. |
| 17 | 6.RCC: (Assessment of strength of concrete by Cube testing at Approved Govt labs as per IS) Cement make: Use Malabar cement only as per Govt. direction and in case of non availabilty of Malabar cement use Ultra Tech, Dalmia, Ramco or eq. brand in the order of preference. |
| 18 | 7.STEEL REINFORCEMENT: Make: Tata,Vaishak, SAIL, JSW or eq primary make in the order of preference |
| 19 | 8.CENTERING & SHUTTERING: (Centering and shuttering for different category of work may be considered separately.) Please Enable Macros to View BoQ information |