|
| 1 | Schedule I (Civil and erection Works) |
| 2 | Schedule II (Supply of materials) |
| 3 | Applicable GST Amount (Total GST Amount @18%) |
| 4 | Clearing Light jungle including all cost of labour, lead, lift etc complete. |
| 5 | Conducting Soil investigation and design of pier type foundation including cost of all materials labour,lead, lift etc complete. |
| 6 | Trial pit excavation at site |
| 7 | Standard Penetration Test by reputed institutions |
| 8 | Labour charges for loading and unloading |
| 9 | Labour charges for SPT test |
| 10 | Transporting and testing equipment in tempo vechile (upto 40kms radius) |
| 11 | Refilling the excavated pit using earth other than sand |
| 12 | Design of pier type for proposed type of towers including structural elements required and analysis |
| 13 | Conducting check survey,fixing of location and pit marking for tower foundation as per the approved profile cost of survey equipment tools & plants including cost of all T & Ps, transport, labour, lead lift etc complete as directed by engineer. |
| 14 | Earthwork excavation in hard stiff clay, black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil inlcuding all cost of lead lift etc complete |
| 15 | Earthwork excavation in soft disintegrated rock or kankar not requiring blasting inlcuding all cost of lead lift etc complete |
| 16 | Excavation in medium and dense medium rock not requiring blasting for foundation inlcuding all cost of lead lift etc complete |
| 17 | Hard Rock measured in solid including blasting and stacking inlcuding all cost of lead lift etc complete |
| 18 | Transporting and fixing of stub and cleat with supply of template and assembling at site and shifting the template from loc to loc including cost of template labour, fabrication charges etc complete. |
| 19 | HCR(w) |
| 20 | MD(w) |
| 21 | PCC1:3:6 using 20mm metal for foundationfor tower concrete with out form work including cost of all materials, lead, lift , etc complete . |
| 22 | PCC1:2:4 using 20mm metal for foundation for tower concrete for frustum and chimney with form work including cost of all materials, lead, lift , etc complete . |
| 23 | Supplying & Providing MS/RTS steel reinforcement including cost of steel rod reinforcement , binding wire including cost of all materials,labour, lead and lift etc., complete. |
| 24 | PCC 1:2:4 using 20mm (machine crushed) metal for Retaining wall using mixture machine including cost of all materials, labour lead, litf, etc., complete but excluding cost for steel reinforcement . |
| 25 | RCC 1:1.5:3 grade using 20mm (machine crushed) metal for frustam & Chimney using mixture machine with steel frustum box including cost of all materials, labour lead, litf, etc., complete. But excliding cost for steel reinforcement . |
| 26 | Providing form work for retaining wall including cost of all materials, labour charges leads, lifts, as per standard specification etc., complete. |
| 27 | Back filling with the excavated earth including watering and consolidation in layers each layer not exceeding 150mm thick and spreading the balance earth around the location labour charges ,lead, lift, etc complete. |
| 28 | Gravel Filling for retaining wall including watering and consolidation in layers each layer not exceeding 150mm thick and spreading the balance earth around the location labour charges ,lead, lift, etc complete. |
| 29 | supply & Providing earthing as per approved specification and as directed by the site engineer including necessary excavation for fixing 3m long 25mm dia GI \\"B\\" class pipe and refilling with excavated earth and connect the earthstrip with the leg of the stub including all cost of materials, lead, lift etc complete. |
| 30 | Erection of GI tower/extension including sorting out of tower parts ,tightening punching of bolt & nuts transport charges to each location ,final checking cost of T &P,labour, lead, lift etc complete . |
| 31 | PCC 1:2:4 using 20mm metal for muffing coping concrete with form work including cost of all materials,labour, lead, lift,etc complete . |
| 32 | Plastering with CM 1:3,12 mm thick for muffing coping concrete including cost of all materials,labour,lead,lift etc complete |
| 33 | Painting two coats using best quality anticorrosive paint over tower leg at a height of 1.00m above coping including cost of all materials,labour, lead lift etc complete in all respects. |
| 34 | Providing welding of all bolts and nuts in the erected towers from ground level to the cross arm bottom level 1 cm each side at two places opposite to each other after tightening and punching of bolt & nuts including painting the welded portion of bolt and nuts two coats of best quality of cold galvanised paint having atleast 90% zinc content and approved by the Engineer at site including cost of welding rod ,hire charges of diesal generator and welding transformer, paint and all T & P including cost of all materials labour,lead, lift etc complete. |
| 35 | Transporting and hoisting of single disc 90 K N insulator (7 units) with single suspension insulator with out PA rod strings including cost of hardware fittings,labour,lead,lift etc complete |
| 36 | Transporting and hoisting of single disc 120 K N insulator (8 units) with single tension insulator strings including cost of hardware fittings,labour,lead,lift etc complete |
| 37 | Transporting and hoisting of Double unit disc 120 K N insulator (9 units) with Double tension insulator strings including cost of hardware fittings,labour,lead,lift etc complete |
| 38 | Transporting & Hoisting of single disc 120 KN insulator (14Units) for Tension fitting insulator string including cost of labour, lead, lift etc complete |
| 39 | Transporting ,Labour charges for stringing of 6 Nos of ACSR Panther conductor including cost of loading & unloading transporting , sorting out of drums according to drum schedule providing trusseles ,paying out, jointing,rough sagging, tensioning, clipping, providing vibration dambers at tension locationsand all accessories including jumber connections, cost of T&P ,moving the drum to work spot all labour ,lead, lift, etc complete in all respects . |
| 40 | Transporting ,Labour charges for stringing of 6 Nos of Zebra conductor including cost of loading & unloading transporting , sorting out of drums according to drum schedule providing trusseles ,paying out, jointing,rough sagging, tensioning, clipping, providing vibration dambers at tension locationsand all accessories including jumber connections, cost of T&P ,moving the drum to work spot all labour ,lead, lift, etc complete in all respects . |
| 41 | Supply, Transporting Erection , Termination,testing and Commissionong of 48 Core OPGW Cable with accessories of thcost of all labour charges transport etc complete. |
| 42 | Supply, Transport, Laying, Erection, Testing and Commissioning of 48 core Optic fibre (ADSS)cable with joints 40mm Dia HDPE Duct hose pipe, FODP and all accessories |
| 43 | Supplying and Labour charges for fixing of following accessories in tower as directed by the engineer at site including all cost of labour transport,lead, lift,etc complete |
| 44 | Number Plate |
| 45 | Danger Board |
| 46 | Phase plate set of three |
| 47 | Supply,fabrication and fixing of name board with 18 gauge plate with one coat red oxide and two coat enamel paint for back ground lettering with enamel of approved colour fixing in tower as directed all materials labour,lead, lift, etc, complete .for name board size approved by the engineer incharges of works.( 0.75 * 0.45) |
| 48 | Providing temporary guys with steel wires and turn buckles including necessary excavation for fixing RSJ/rail bit or concrete blocks for anchorage dismantling after after completion of stringing works including cost of allmaterials,lead,lift,labour etc complete. |
| 49 | Lowering the HT/LT Line during stringing of power conductor and earthwire after restringing the same in original position including labour,lead ,lift etc complete |
| 50 | Labour charges for removal of Small trees including all cost of labour, lead, lift etc complete. |
| 51 | Labour charges for removal of Large tree including all cost of labour, lead, lift etc complete. |
| 52 | Providing special type trussels forP&T,road crossing during stringing work with casurina props so as to avoid accident and dameges to conductor and earth wire on both side of crossing including cost of all materials,labour, lead lift etc. Complete in all respects. |
| 53 | Providing earthing arrangements for terminal tower including necessary excavation for fixing 3m long 50mm dia GI \\"B\\" class pipe,as per standard specfication and as directed by the engineer incharge including lowering of earth wire from earth peak to bottom of the tower leg and connecting to the earth pipe by providing 150 mm dia meter bore for a depth of 3.6 m and placing of 50 mm dia GI pipe filling with charcoal and salt in the annular space and providing RCC ring 60cm dia with 5cm shell thick of RCC collar and ub including all cost of materials lead lift etc complete. |
| 54 | Releasing and lowering of existing 6 nos panther conductor and restringing the conductor with required sag into the newly erected tower including all labour lead, lift T & P etc complete (under LC ) |
| 55 | Releasing and lowering of existing 6 nos Zebra conductor and restringing the conductor with required sag into the newly erected tower including all labour lead, lift T & P etc complete (under LC ) |
| 56 | Land plan schedule for this transmission line towards compensation for the land in the route adopted including detailed survey of land in transmission line in coordination with revenue department preparation of land plan schedule with drawing in FMB sketch including cost of hire charges for all instrument ,labour etc ,as per the instruction of TANTRANSCO engineers incharge at site complete . |
| 57 | Suppling and filling wellgravel wherever necessary including cost of all T&P transport, labour, lead lift etc., complete. |
| 58 | Supplying and fixing of eye bolt transporting to site including cost of materials, transporting charges, loading, unloading etc as per approved drawing, as per relevant Indian Standard specification complete. |
| 59 | Supplying and fixing of Hanger rod of 16 mm and transporting to site including cost of materials, transporting charges, loading, unloading etc as per approved drawing, as per relevant Indian Standard specification complete. |
| 60 | Supplying of \\"D\\" Shackle transporting to site including cost of materials, transporting charges, loading, unloading etc as per approved drawing, as per relevant Indian Standard specification complete. |
| 61 | Supply and Fabrication providing special type type arcing horns for suspention fitting including cost of all materials,labour,lead, lift, etc. complete. As required and standard specifiation complete. |
| 62 | Supplying of ST fitting for OPGW 48 Fibre cable transporting to site including cost of materials, transporting charges, loading, unloading etc as per approved drawing, as per relevant Indian Standard specification complete. |
| 63 | Fixing of PG clamp for Panther for providing loop in between existing 110 KV LILO line during LC condition for all the phase including all labour ,lead , lift T&P etc complete if necessary and removal of loop jumper after completion of work as per the instruction of engineer at site. |
| 64 | Dewatering charges per hour including hire charges for 3/5 HP Diesel including cost of materials, transporting charges for motor & pump location to location, lead lift etc complete |
| 65 | Supplying and fixing of 75 mm Dia PVC pipe for weep holes fixing in position in retaining wall including cost of all materials lead lift etc complete |
| 66 | Providing two legged Scaffolding using 15 cm diameter casurina pole of 4 m overall length (3 m height+0.5 m, Projection +0.5 m into the ground ) the distance between the two rows being 1.25 m and the spacing of posts being 2 m in both the rows with two horizontal psts with 0.5 m overlap on either side and braces at 0.6 cm c/c including longtitude and transerverse middle braces to step up and providing a platform with country wood planks of 40 mm thick and 1 m width etc., in a complete form using coir and nails 1 m run including cost of dismantling the scaffolding after completion of work. |
| 67 | Dismantling the existing tower and transporting the same from site to road and transporting to karamadai stores including cost of loading unloading lead lift etc complete |
| 68 | Provision for Tree/Crop Compensation |
| 69 | Supply of GI HT tower/extension parts in accordance with boards design as per approved drawing and BOM as detailed in this specification including cost of all materials, labour, lead, lift etc complete (as per approved drawing, BOM and specification) |
| 70 | Supply of GI MS tower/extension parts including stub in accordance with boards design as per approved drawing and BOM as detailed in this specification including cost of all materials, labour lead lift etc complete (as per approved drawing, BOM and specification) |
| 71 | Supply of hot dipped galvanised iron bolt and nut, packing washers, spring washers,conforming to IS 2427/1988 and IS 387 Part XIII of latest issue including cost of materials, lead lifts etc complete. |
| 72 | Supply of DT Fitting For Panther |
| 73 | Supply of ST Fitting for panther |
| 74 | Supply of ST Fitting for Zebra |
| 75 | Supply of SS Fitting for panther |
| 76 | Supply of Aluminium Earth Bond |
| 77 | Supply of Vibration Damper for panther |
| 78 | Supply of Vibration Damper for Zebra |
| 79 | Supply of Midspan Joint for Panther |
| 80 | Supply of Repair sleeve for Panther Please Enable Macros to View BoQ information |