| 1 | 1.Construction Of Multi Purpose Room at Gavundampalayam H/O Ellapalayamputhur |
| 2 | Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) - upto 0.30m depth |
| 3 | Cement concrete 1:4:8 mix using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying standard specification. |
| 4 | Collection and supply of gritty gravel from approved quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, |
| 5 | Brick work in following Cement Mortar using best quality Fly ash bricks of size 23x11x7cm for foundation and basement including curing etc.,complete complying with standard specification. For foundation and basement |
| 6 | Brick work in following Cement Mortar using best quality Fly ash bricks of size 23x11x7cm for foundation and basement including curing etc.,complete complying with standard specification. For Super Structure |
| 7 | Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle of size 25 x 25 x 3mm for boarding laid over silver oak joists(Country wood) of size 10 x 6.5cm spaced @ about 90cm c/c and supported by casurina props of 10 - 13cm dia. spaced @ 75cm c/c etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2. |
| 8 | Centering below Ground level |
| 9 | Centering for column post |
| 10 | Centering for roof slab, lintel, beam |
| 11 | Centering for sunshade |
| 12 | Supplying fabricating and placing in position of ribbed steel rods for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors etc., complete |
| 13 | Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls , sides and bottom of the slabs, beams etc., shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. |
| 14 | For foundation and basement |
| 15 | For superstructure in ground floor |
| 16 | Plastering with cm 1:5 mix( one cement and five sand ) to 12 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications. |
| 17 | Plastering with cm 1:3 mix( one cement and five sand ) to 10 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications. |
| 18 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete). The Putty should be got approved by the Executive Engineer |
| 19 | Providing Granolythic floor finish in cement concrete 1:2:4 mix using 10-12 mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges etc., |
| 20 | Supplying and fixing P.V.C rainwater down fall pipe of 110mm dia with necessary shoes, bends,& clamps etc |
| 21 | Weathering course with best quality broken brick jelly of size 20mm uniform gauge in pure slaked lime (no sand to be listed) over the RCC roof slab in the proposition being brickjelly to lime 32:12:1/2 by volume and laid over into a single layer and consolidated to required finished thickness beating the mixture with wooden beaters keeping the surface constantly welted by sprinkling lime jaggery water including all other labour charges etc., complete |
| 22 | Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers |
| 23 | Supply and Fixing of Cudappah slab including cost and all labour chrges etc. |
| 24 | Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. |
| 25 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. |
| 26 | Supply and fixing of Steel door and Windows including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications. Steel door |
| 27 | Supply and fixing of Steel door and Windows including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications. Window |
| 28 | Wiring with 2 x 1.5 sq.mm. (22 / 0.3 ) PVC insulated single core unsheathed copper conductor cable of 1100V grade in suitable heavy gauge MS conduit pipe on wall and ceiling with MS accessories with MS switch Box and 5A FT switch with painting of suitable colour continuous earth wire connection of 14 SWG TC wire for light point / fan point (for electronic regulator) SD 20 |
| 29 | Wiring with 2 x 1.5 sq.mm (22 / 0.3) PVC insulated single core unsheathed copper conductor of 1100V grade insuitable PVC rigid pipe concealed in wall and the celling with PVC accessories in flush with wall with suitable flushtype TW switch box to house the control switch and regulator and covered with 3mm thick hylern sheet withcontinuous earth wire connection of 14 SWG TC wire making good of the concealed portion with suitable colour forconcealed fan point (for rheostatic type fan regulator)- SD -10. |
| 30 | Supply and fixing of single box type 4'-40W flourescent tube fitting with copper choke and condenser with TW round block on wall or ceiling with flourescent tube with PVC unsheathed copper leads from terminals to the fitting of Tube Light [SD 88 ] |
| 31 | Provision for Nameboard Charges |
| 32 | Provision for Photography Charges |
| 33 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \\"BB\\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) Please Enable Macros to View BoQ information |