| 1 | NON CENTRALIZED ITEM |
| 2 | STAY CLAMP FOR SP-23 WITH NUT & BOLT |
| 3 | PP & CLAMP WITH N&B ST POLE SP-23 |
| 4 | 11 KV CABLE TIES FOR PIN INSULATOR |
| 5 | 11 KV IPC FOR COVERED TO COVERED COND. |
| 6 | 11 KV IPC FOR COVERED TO BARE CONDUCTOR |
| 7 | 11 KV MID SPAN JOINTING KIT |
| 8 | IPC WITH AL. BAIL FOR EARTHING 11KV |
| 9 | 11 KV Tension With Ball and IPC |
| 10 | 11KV AAAC COVERED COND. AL-59,99 SQ.MM. |
| 11 | Labour |
| 12 | FABRICATION OF STEEL |
| 13 | EXCAVATION OF PIT FOR STAY SET |
| 14 | ERECTION OF 11 KV STAY SET |
| 15 | GROUTING OF STAY SET |
| 16 | EXCAVATION OF PIT FOR POLE |
| 17 | ERECTION OF SINGLE SP-23 POLE |
| 18 | CARTAGE SP-21/23 POLE, 51-70 KM |
| 19 | CARTAGE OF PETTY MATERIAL,51-70 KM |
| 20 | HEADLOAD CARTAGE SP-21/23 POLE(1-3 KM) |
| 21 | HEADLOAD CARTAGE OF MATERIAL(1-3 KM) |
| 22 | BACK CARTAGE OF PETTY MATERIAL,51-70 KM |
| 23 | FIXING OF IPC WITH AL. BAIL FOR EARTHING |
| 24 | FIXING OF 11KV 90KN TENSION CLAMP B&IPC |
| 25 | FIXING OF 11 KV IPC FOR CC TO CC COND. |
| 26 | FIXING OF 11 KV IPC FOR CC TO BARE COND. |
| 27 | FIXING OF 11 KV MID SPAN JOINTING KIT |
| 28 | FIXING OF 11 KV PIN INSULATOR |
| 29 | GROUTING AND MUFFING OF POLES |
| 30 | LAYING SPREADING,STRINGING AAAC CONDUCT. |
| 31 | 11 KV CABLE TIES FOR PIN INSULATOR |
| 32 | REMOVING OLD CONDUCTOR BY OPENING JUMPER Please Enable Macros to View BoQ information |