| 1 | 1.Renovation of Two Class Room School Building PUPS E/F, N/F in Kavampair Village at Kavampair Panchayat : Clean removal of cement plaster from walls and Celling |
| 2 | Casurina Poles 8cm-10cm dia For Scaffolding |
| 3 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete cetc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. |
| 4 | Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work). |
| 5 | 2.Renovation of Two Class Room School Building PUPS in Puthali At Kavampair Panchayat : Clean removal of cement plaster from walls and Celling |
| 6 | Casurina Poles 8cm-10cm dia For Scaffolding |
| 7 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete cetc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. |
| 8 | Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work). |
| 9 | 3.Renovation of Two Class Room School Building PUPS in Kannikulam At Pulivoy Panchayat : Clean removal of cement plaster from walls and Celling |
| 10 | Casurina Poles 8cm-10cm dia For Scaffolding |
| 11 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete cetc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. |
| 12 | Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work). |
| 13 | 4.Renovation of Two Class Room School Building PUPS in Pulivoy Village At Pulivoy Panchayat : Clean removal of cement plaster from walls and Celling |
| 14 | Casurina Poles 8cm-10cm dia For Scaffolding |
| 15 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete cetc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. |
| 16 | Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work). |
| 17 | 5.Renovation of Two Class Room School Building PUPS E/F, N/F in Maruduvampadi Village At Maruduvampadi Panchayat : Clean removal of cement plaster from walls and Celling |
| 18 | Casurina Poles 8cm-10cm dia For Scaffolding |
| 19 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete cetc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. |
| 20 | Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work). |
| 21 | 6.Renovation of Two Class Room School Building PUMS Karuveppampoondi Village At Karuveppampoondi Panchayat : Clean removal of cement plaster from walls and Celling |
| 22 | Casurina Poles 8cm-10cm dia For Scaffolding |
| 23 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete cetc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. |
| 24 | Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work). |
| 25 | 7.Renovation of Two Class Room School Building PUMS Marudam Village At Marudam Panchayat : Clean removal of cement plaster from walls and Celling |
| 26 | Casurina Poles 8cm-10cm dia For Scaffolding |
| 27 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete cetc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. |
| 28 | Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work). |
| 29 | 7.Renovation of Anganwadi Building At Ozhugarai Panchayat : Clean removal of cement plaster from walls and Celling |
| 30 | Casurina Poles 8cm-10cm dia For Scaffolding |
| 31 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete cetc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. |
| 32 | Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work). |
| 33 | Ramp Repair |
| 34 | Electrical Arrangement |
| 35 | Renovation of Three Class Room School Building PUPS Azhisoor Village AT Ahisoor Panchayat : Clean removal of cement plaster from walls and Celling |
| 36 | Casurina Poles 8cm-10cm dia For Scaffolding |
| 37 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete cetc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. |
| 38 | Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work). |
| 39 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \\"BB\\" for all works in this package} Please Enable Macros to View BoQ information |