| 1 | Clearing Grass and Removal of Rubbish (Maximum 150mm) by manual means and disposal at a lead of 50 metres as per MoRT&H specification clause 201. |
| 2 | Dressing of earth work in surface excavation including cutting and filling upto 30cm depth including disposal of excavated earth upto 50m and lift upto 1.5 m. |
| 3 | Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per MoRT&H specification clause 301. In all type of soil |
| 4 | Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per MoRT&H specification clause 301. In all type of soil In ordinary rock |
| 5 | Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per MoRT&H specification clause 301. In all type of soil In Hard Rocks Using blasting (including blasting material) (considering serviceable material) |
| 6 | Construction of subgrade and earthen shoulders with approved material obtained from borrow area with all lifts & leads, transporting to site, spreading, grading to required slope and compacted in layers \not exceeding 200mm thickness at OMC, with vibratory roller of 80100 KN static weight or more to attain a density 97% maximum dry \density to meet requirement of table No. 300-2 as per MoRT&H specification clause 305. (Lead taken upto 5 km) |
| 7 | Construction of embankment with approved material obtained from borrow pit with all lifts and leads, transporting to site, spreading, grading to required slope and compacting by vibratory roller 8-10 tonne to meet requirement of table 300-2 including cost of compensation for earth taken from private land complete as per MoRT&H specification clause 305. (Lead taken upto 5 km) |
| 8 | Construction of subgrade and earthen shoulders with approved material obtained from borrow area with all lifts & leads, transporting to site, spreading, grading to required slope and compacted in layers not exceeding 200mm thickness at OMC, with vibratory roller of 80100 KN static weight or more to attain a density 97% maximum dry density to meet requirement of table No. 300-2 as per MoRT&H specification clause 305. (Lead taken upto 5 km) |
| 9 | Filling with locally available river sand at all levels including watering ramming consolidating and dressing complete including cost of sand. |
| 10 | Earth filling with available surplus soil excavated from foundations and taken only from outside of building plinth in layers not exceeding 20cm in depth, consolidating each deposited layer including ramming and watering and consolidation with lead up to 50 m and lift upto 1.5 m. |
| 11 | Carriage of materials by manual labour including loading, unloading and stacking for lead less than 0.5 Km :Earth Please Enable Macros to View BoQ information |