| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 25-03-2026 | EXTENSION OF LAST DATE | Date | 07-04-2026 |
| 2 | 11-03-2026 | Measurement | Technical Bid | 24-03-2026 |
| 3 | 11-03-2026 | Measurement | Technical Bid | 07-04-2026 |
| Sl. No. | Item Description |
| 1 | PART - A CIVIL WORKS :- Painting with two coats of first quality synthetic enamel paint of approved brand and manufacturer, to give an even shade of approved colour on existing wall surface after preparation of surface thoroughly to remove all dirt, dust, mortar drops and other foreign matter etc., including cost of supply of all materials, labours, tools, plants, equipments, rope, cradle, ladders, Scaffolding etc. at all heights of the Lighthouse tower complete and as directed by the Engineer in Charge. ( Inside Lighthouse Tower of 30M height). Brand Asian (Apcolite)/Berger (Luxol) as approved. |
| 2 | Painting to Lighthouse tower to the existing exterior painted surface with two coats of synthetic enamel paint of first quality (Berger/Asian brands) and approved colour, after preparation of surface thoroughly to remove all dirt, dust, mortar drops and other foreign matter etc., scraping and cleaning the worn out paint and applying one coat of primer wherever required surface as directed, including cost of supply of all materials, labour, tools and plants, equipments, rope, ladder, bosun chairs, Scaffolding at all heights of the Lighthouse tower ( 30M height). and all other charges etc. complete and as directed by the Engineer in Charge. Brand Asian/Berger as approved. |
| 3 | Painting on existing Steel surfaces with first quality synthetic enamel paint two coats of approved brand and manufacture to give an even shade over a coat of of ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/steel works, at all height of the Lighthouse tower, after preparation of surface thoroughly to remove all dirt, dust, other foreign matter etc., scraping and cleaning the worn out paint, including cost of supply of all materials, labours, tools, plants, equipments, rope, cradle, ladders, Scaffolding etc. at all heights of the Lighthouse tower complete and as directed by the Engineer in Charge. ( For Lighthouse tower 30M height) Brand Asian/Berger as approved. |
| 4 | Painting on existing wooden surfaces with two coats of synthetic enamel paint first quality of approved brand and manufacture of approved colour to give an even shade on old work for Doors and Windows, after preparation of surface thoroughly to remove all dirt, dust, other foreign matter etc., scraping and cleaning the worn out paint, including cost of supply of all materials, labours, tools, plants, equipments, rope, cradle, ladders, Scaffolding etc. at all heights of the Lighthouse tower complete and as directed by the Engineer in Charge. (For Lighthouse tower 30M height). Brand Asian/Berger as approved. |
| 5 | Painting two coats Wall painting with premium acrylic emulsion paint of interior grade, first quality having VOC (Volatile Organic Compound) content less than 50 grams/ litre of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour after preparation of surface thoroughly to remove all dirt, dust, other foreign matter etc., scraping and cleaning the worn out paint, including the cost of supply of all labours, materials, tools & plants,scaffolding and ladder,brushes, and all other charges etc., complete and as directed by the Engineer in Charge. Brand Asian/Berger as approved. |
| 6 | Painting with two coats of first quality Exterior weather paint (APEX ULTIMA or equivalent as approved) over a coat of cement primer of First quality of approved brand/manufacture applied on undecorated wall surface, Ceiling surface etc., to give an even shade after preparation of surface thoroughly to remove all dirt, dust, other foreign matter etc., scraping and cleaning the worn out paint, including the cost of supply of all labours, materials, tools & plants, scaffolding and ladder, brushes, putty whereever required and all other charges etc., complete and as directed by the Engineer in Charge. (For Allied Buildings) |
| 7 | Painting with two coats of first quality synthetic enamel paint for door & windows of approved brand and manufacture of approved colour to give an even shade on old work, after preparation of surface thoroughly to remove all dirt, dust, other foreign matter etc., scraping and cleaning the worn out paint, including the cost of supply of all labours, materials, tools & plants, scaffolding and ladder, brushes, putty whereever required and all other charges etc., complete and as directed by the Engineer in Charge.: Brand Asian/Berger as approved. |
| 8 | Painting with two coats of first quality synthetic enamel paint of approved brand and manufacture to give an even shade on old work under a coat of with ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works, after preparation of surface thoroughly to remove all dirt, dust, other foreign matter etc., scraping and cleaning the worn out paint, including the cost of supply of all labours, materials, tools & plants, scaffolding and ladder, brushes, putty whereever required and all other charges etc., complete and as directed by the Engineer in Charge. Brand Asian/Berger as approved. |
| 9 | Renewing by replacement of old/broken/faded glass panes, with new glass of approved make using wooden fillets wherever necessary Float glass panes of nominal thickness 4 mm (weight not less than 10kg/sqm). including the cost of supply of all labours, materials, tools & plants, scaffolding, accessories, handling etc., disposal of debris and all other charges etc., complete . |
| 10 | Replacement of damaged netlon mesh of windows, ventilators, meat safe, shutters etc and as wherever as directed including removing the damaged netlon mesh and refixing with new ones with teak wood beeding, including cost of supply of all labours, materials, tools & plants and all other charges etc., complete and as directed by the Engineer in Charge including disposal of unserviceable materials etc, |
| 11 | Replacement of unserviceable/ broken fittings of doors windows, Ventilators, Cupboards of shutters and as wherever directed with new aluminium fittings (Heavy duty) fitted with brass screws, including removing damaged fitting and Disposing unserviceable materials from the site etc, supply of all materials, labours, tools, etc. complete of approved make and quality. |
| 12 | 100mm aluminium butthinges |
| 13 | 75mm butthinges |
| 14 | Aluminium tower bolt 250x10 mm |
| 15 | Aluminium tower bolt150mmx10mm |
| 16 | Alumium hooks &eye 150mm |
| 17 | Twin rubber stopper |
| 18 | Aluminium Door Handle 125 mm |
| 19 | Aluminium sliding door bolts, 250x16 mm |
| 20 | Dismantling of flushing cistern of all types (C.I./PVC/Vitrious China) including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead, inclusive of cost of all labours, materials, tools & plants, all other charges etc., |
| 21 | Dismantling WC. Pan /EWC/wash basin pan of all sizes including disposal of dismantled materials including malba all complete as per directions of Engineer-in Charge, inclusive of cost of all labours, materials, tools & plants, all other charges etc., |
| 22 | Providing and fixing white vitreous china pedestal type water closet (European type) with seat and lid, 10 litre low level white vitreous china flushing cistern & C.P. flush bend with fittings & C.I. brackets, 40 mm flush bend, overflow arrangement with specials of standard make and mosquito proof coupling of approved municipal design complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required : W.C. pan with ISI marked white solid plastic seat and lid (For visitor Toilet / office), inclusive of cost of all labours, materials, tools & plants, all other charges etc., Make : Parryware/Hindware or as approved. |
| 23 | Providing and fixing wash basin with C.I. brackets, 15 mm dia CP Brass single hole basin mixer of approved quality and make, including painting of fittings and brackets, cutting and making good the walls wherever required:- White Vitreous China Wash basin size 550x400 mm with a 15 mm CP Brass single hole basin mixer (For Office toilet ) inclusive of cost of all labours, materials, tools & plants, all other charges etc., Make : Parryware/Hindware or as approved. |
| 24 | Taking out existing wooden door shutter/ window shutter, repair by cutting, painting etc. and refixing of repaired door shutters to existing door frames, including replacement of hinges with screws, etc. as required, all complete as per the direction of the Engineer-in-charge, inclusive of cost of all labours, materials, tools & plants, all other charges etc., . |
| 25 | Providing and fixing Stainless Steel A ISI 304 (18/8) kitchen sink as per IS:13983 of approved make with C.I. brackets and stainless steel plug 40 mm, including painting of fittings and brackets, cutting and making good the walls wherever required :470X420 bowl depth of 178mm, inclusive of cost of all labours, materials, tools & plants, all other charges etc., |
| 26 | Providing and fixing Stainless Steel A ISI 304 (18/8) kitchen sink of size :470X420 bowl depth of 178mm as per IS:13983 with C.I. brackets and stainless steel plug 40 mm, including painting of fittings and brackets, cutting and making good the walls wherever required, inclusive of cost of all labours, materials, tools & plants, all other charges etc., |
| 27 | Providing and fixing Stainless Steel AISI-304(18/8) Wash basin 530x345 mm with Single 15 mm C.P. brass pillar tap, including painting of fittings and brackets, cutting and making good the walls wherever required, inclusive of cost of all labours, materials, tools & plants, all other charges etc., |
| 28 | Providing and fixing/laying of Chlorinated Polyvinyl Chloride (CPVC) pipes of approved brand, (FINOLEX/ PRINCE/ ASHIRVAD/ ORIPLAST/ SUPREME), having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete. as per direction of Engineer in Charge, including fittings, solvent etc., cutting and making good the walls wherever required, inclusive of cost of all labours, materials, tools & plants, all other charges etc., |
| 29 | Providing and fixing/laying of 20mm dia CPVC pipe includes Concealed work as and where required, complete as directed by Engineer in charge. |
| 30 | Providing and fixing/laying of 25mm dia CPVC pipe includes Concealed work as and where required, complete as directed by Engineer in charge. |
| 31 | Providing and fixing/laying of 32mm dia CPVC pipe includes Concealed work as and where required, complete as directed by Engineer in charge. |
| 32 | Providing and fixing 25 mm dia CPVC Angle brass valve of approved quality for water supply line , High or low pressure of approved quality and make, including fittings, solvent etc., cutting, jointing etc., wherever required, inclusive of cost of all labours, materials, tools & plants, all other charges etc., |
| 33 | Providing and fixing uplasticised PVC connection pipe with brass unions :45 cm length 15 mm nominal bore, of approved quality and make, complete as directed by the Engineer in Charge including fittings, solvent etc., cutting, jointing etc., wherever required, inclusive of cost of all labours, materials, tools & plants, all other charges etc., |
| 34 | Providing and fixing bath room fittings like Mirror,Towel rail, Soap dishtray of approved quality and make including cost of supply of all materials, labours, Screws and tools and all other charges etc., complete as directed by the Engineer in Charge. |
| 35 | Providing and fixing 600x450 mm beveled edge mirror of superior glass (of approved quality and make) complete with 6 mm thick hard board ground fixed to wooden cleats with C.P. brass screws and washers including cost of supply of all materials, labours, Screws and tools and all other charges etc., complete as directed by the Engineer in Charge. |
| 36 | Providing and fixing 600x120x5 mm glass shelf with edges round off, supported on anodised aluminium angle frame with C.P. brass brackets and guard rail complete fixed with 40 mm long screws, rawl plugs etc., of approved quality and make, including cost of supply of all materials, labours, Screws and tools and all other charges etc., complete as directed by the Engineer in Charge.. |
| 37 | Providing and fixing 32 mm dia P.V.C. Flexible waste pipe for sink or wash basin including P.V.C. waste fittings of approved quality and make including cost of supply of all materials, labours, solvent, tools and all other charges etc., complete as directed by the Engineer in Charge. |
| 38 | Providing and fixing PTMT Waste coupling 31 mm dia of 79 mm length and 62 mm breadth weighing not less than 45 gms for wash basin and sink, of approved quality make and colour, including cost of supply of all materials, labours, Solvents, tools and all other charges etc., complete as directed by the Engineer in Charge.. |
| 39 | Providing and fixing of Stainless Steel soap dish - 100 mm, of approved quality and make, including cost of supply of all materials, labours, Screws and tools and all other charges etc., complete as directed by the Engineer in Charge. |
| 40 | Providing and fixing of Stainless Steel 600 mm long towel rail , of approved quality and make, including cost of supply of all materials, labours, Screws and tools and all other charges etc., complete as directed by the Engineer in Charge. |
| 41 | Providing and fixing water supply fittings( Parryware,Hindware, plumber,) of approved quality and make with all necessary fixtures and specials of approved first quality brand/manufacturer, colour (ISI make) as per the following items including cost of all materials, labours, screws, tools & plants and all other charges etc complete, as approved by Engineer in charge.. |
| 42 | Providing and fixing CP Brass 15 mm dia tap ( Long body), of approved quality and make. |
| 43 | Providing and fixing 15 mm nominal dia CP Brass Single lever telephonic wall mixer of quality & make |
| 44 | Providing and fixing CP Brass 15 mm dia Two way tap with Health Faucet, of approved quality and make. |
| 45 | Providing and fixing CP Brass 15 mm dia Stopcock( concealed), of approved quality and make. |
| 46 | Providing and fixing CP 15 mm dia 230 mm CP shower arm, of approved quality and make. |
| 47 | Providing and fixing CP 150 mm diameter CP shower nose, of approved quality and make. |
| 48 | Providing and fixing CP 15mm CP angular valve, of approved quality and make. |
| 49 | Providing and fixing CP Brass 32 mm size Bottle Trap of approved quality and make. |
| 50 | Providing and fixing 15 mm dia Lead flexible Pipe for Geycer, of approved quality and make.. |
| 51 | Providing and fixing PTMT grating Circular type 125 mm nominal dia with 25 mm waste hole of approved quality and colour. |
| 52 | Providing and fixing PVC 110mm gully trap |
| 53 | Providing and fixing on wall face 110 mm diameter Rigid PVC rain water pipes conforming to IS : 13592 Type A, including cutting, jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, of approved quality and make including cost of all materials, labours, screws, scaffolding, tools & plants and all other charges etc complete, as directed by Engineer in charge. |
| 54 | 110 mm dia |
| 55 | 75 mm dia |
| 56 | Providing and fixing follwing PVC heavy duty accessories like Elbow, Tee, Bend, Reducers etc., of dia in 75 mm and 150 mm of Ory plast ,Hariplast,Truebore, Finolex, Nandi, Diamond make of first quality as approved with all required fixtures including cost of Supply of all materials,labours, scaffolding, tools, plants and all incidental charges etc., complete, as directed by Engineer in charge. |
| 57 | Coupler 75 mm |
| 58 | Coupler 110mm |
| 59 | Single tee with door75x75x75 mm |
| 60 | Single tee with door110x110x110 mm |
| 61 | 75 mm bend / offset |
| 62 | 110mm pvc bend/offset |
| 63 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - Nominal concrete 1:3:6 or richer mix (including equivalent design mix), including cost of Supply of all materials, labours, scaffolding, tools, plants and all incidental charges etc., complete, as directed by Engineer in charge. |
| 64 | Providing and laying of plain cement concrete 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) Including mixing laying, curing, consolidation excluding side shuttering etc., complete, including cost of supply of all materials, labours, scaffolding, curing, tools & plants and all other charges etc., complete, as directed by Engineer in charge. |
| 65 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge, including cost of supply of all labours, tools & plants, disposal, and all other charges etc., complete, as directed by Engineer in charge. |
| 66 | Drilling suitable holes in reinforced or Plain Cement Concrete with power driven drill machine to a minium depth of 100mm upto 200 mm in RCC beams, lintels, columns and slabs to introduce steel bars for sunshades/ balconies including fixing the steel bars in position using injectable mortar HIT(-RE 500 V4/500) epoxy resin anchor grout of approved make all complete as per direction of Engineer-In-Charge, including cost of supply of all materials (but excluding the cost of reinforcement), labours, tools & plants and all other charges etc., complete, as directed by Engineer in charge. |
| 67 | Extra for cutting reinforcement bars manually/ by mechanical means in R.C.C. or R.B. work (Payment shall be made on the cross sectional area of R.C.C. or R.B. work) as per direction of Engineer-in-charge, including cost of supply of tools, plants and other charges etc., complete, as directed by the Engineer in charge. |
| 68 | Supplying, cutting, straightening, bending, binding, placing in position Fe 500 grade steel reinforcement of HYSD tor steel/TMT bars of make SAIL/VIZAG Steel/RINL/TATA-TISCON/ JINDAL for R.C.C work at all heights as per drawing and as directed including cost of supply of binding wire of approved first quality & thickness, all materials, labour, tools and plants, scaffolding, transport, handling and all other charges etc. complete for all works. |
| 69 | Providing and fixing of Centering and shuttering including strutting, propping etc., and removal of form for Weather shed, Chajjas, corbels etc., including edges, inclusive of cost of supply of all materials, labours, scaffolding, tools, plants, all other incidental charges, etc., all complete and as directed by the Engineer in Charge. |
| 70 | Chipping of 75 mm average thickeness, unsound/weak concrete material from slabs, beams, columns etc. with manual Chisel and/ or by standard power driven percussion type or of approved make including tapering of all edges, making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes etc. and disposal of debris for all lead and lifts, including cost of supply of all materials, labours, scaffolding, tools, plants, all other incidental charges, etc., all complete and as directed by the Engineer in Charge. |
| 71 | Cleaning of reinforcement bars upto 12mm diameter from rust from the reinforcing bars to give it a total rust free steel surface by using alkaline chemical rust remover of approved make with paint brush and removing loose particles after 24 hours of its application with wire brush and thoroughly washing with water and allowing it to dry, including cost of supply of all materials, labours, scaffolding, tools, plants, all other incidental charges, etc., all complete and as directed by the Engineer in Charge. |
| 72 | Providing, mixing and applying bonding coat of approved adhesive on chipped portion of RCC as per specifications and direction of Engineer In-charge complete in all respect. SBR Polymer (@10% of cement weight) modified cementitious bond coat @ 2.2 kg cement per sqm of surface area mixed with specified proportion of approved polymer, including cost of supply of all materials, labours, scaffolding, curing, tools, plants, all other incidental charges, etc., all complete and as directed by the Engineer in Charge. |
| 73 | Reinforced cement concrete work |
| 74 | Providing and laying in position cement concrete of specified grade 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derivedfrom natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) including cost of supply of all materials, labours, scaffolding, curing, tools, plants, all other incidental charges, etc., all complete and as directed by the Engineer in Charge, excluding the cost of centering and shuttering - For all works up to plinth level : |
| 75 | Providing and laying Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources), including cost of supply of all materials, labours, scaffolding, curing, tools, plants, all other incidental charges, etc., all complete and as directed by the Engineer in Charge. |
| 76 | Raking out joints in lime or cement mortar and preparing the surface for re-pointing or replastering, including disposal of rubbish to the dumping ground, including cost of supply of all materials, labours, scaffolding, tools, plants, all other incidental charges, etc., all complete and as directed by the Engineer in Charge. |
| 77 | Flush pointing with cement mortar 1:3 (1 cement : 3 fine sand) mixed with 2% of integral water proofing compound by weight of cement for flat tile bricks on top of mud phaska, including cost of supply of all materials, labours, scaffolding, curing, tools, plants, all other incidental charges, etc., all complete and as directed by the Engineer in Charge. : |
| 78 | Demolishing brick tile covering in terracing including stacking of Demolishing brick tile covering in terracing including stacking of metres lead, including cost of supply of all materials, labours, scaffolding, tools, plants, all other incidental charges, etc., all complete and as directed by the Engineer in Charge. |
| 79 | Dismantling tile work for thickness of tiles 10 mm to 25 mm in floors and roofs laid in cement mortar including stacking material within 50 metres lead Hacking of CC flooring including cleaning for surface etc. complete as per direction of the Engineer-in-Charge. |
| 80 | Providing and laying brick tiles of of approved quality over mumty roofs, grouted with cement mortar 1:3 (1 cement: 3 fine sand) mixed with 2% of integral water proofing compound of approved make and manufacturer by weight of cement, over 12 mm layer of cement mortar 1:3 (1 cement : 3 fine sand) and finished neat, including cost of supply of all materials, labours, scaffolding, curing, tools, plants, all other incidental charges, etc., all complete and as directed by the Engineer in Charge. |
| 81 | a)Application of Primer: Providing and applying one coat of epoxy based APCOFLOR HFP 130 or Equivalent (Certificate to be furnished by the firm and as approved) primer, apply the primer by using a Roller or Brush @ 150-200g/sqm consumption. If pinholes found, Filling with OPC mixed with epoxy primer Base +Hardener. Tentative mixing ratio would be 3:1 (Silica sand) and If the substrate has white patches, then apply a second coat of primer after 4 hours and before 6 hours of 1st application. b) Polyurethane Application: Supplying and applying High build elastomeric waterproofing coating based on pure, hydrophobic polyurethane, cold applied of spray / brush applied, membrane with an elongation of 550% and tensile strength of 2.5 N/mm2 as per ASTM D 2370, crack bridging ability of 2mm as per ASTM C1305, no leakage upto 7 bars of water pressure as per DIN 1048, shore A Hardness of min. 45 as per ASTM D 2240. The system includes final base preparation, primer application and applying Smartcare PU Magnum coating in two to three coats to achieve a min. thickness of 1.5mm, and the PU coating shall be extended to parapet walls FFLetc. complete as per product Manufacturer's specifications and directions for use. Note :- The work shall be carried out through authorized applicator only and the certificate of confirmation issued by the authorised applicator in this regard shall be submitted by the firm before commencement of work (Refer clause 11.40 of tender document). |
| 82 | Demolishing brick work In cement mortar manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead including cost of supply of all materials, labours, scaffolding, tools, plants, all other incidental charges, etc., all complete and as directed by the Engineer in Charge. |
| 83 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, in all kinds of soil, including cost of supply of all materials, labours, shoring, tools, plants, all other incidental charges, etc., all complete and as directed by the Engineer in Charge. |
| 84 | Providing and laying in position cement concrete of specified grade, excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources), including cost of supply of all materials, labours, scaffolding, tools, plants, all other incidental charges, etc., all complete and as directed by the Engineer in Charge. |
| 85 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:4 (1 cement : 4 coarse sand), including cost of supply of all materials, labours, scaffolding, tools, plants, simultaneously pointing and curing, all other incidental charges, etc., all complete and as directed by the Engineer in Charge. |
| 86 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :Cement mortar 1:4 (1 cement : 4 coarse sand), including cost of supply of all materials, labours, scaffolding, tools, plants, all other incidental charges, etc., all complete and as directed by the Engineer in Charge. |
| 87 | Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level. Cement mortar 1:3 (1 cement :3 coarse sand), including cost of supply of all materials, labours, scaffolding, tools, plants, all other incidental charges, etc., all complete and as directed by the Engineer in Charge. |
| 88 | Cutting holes up to 30x30 cm in walls including making good the same:With common burnt clay F.P.S. (non modular) bricks, including cost of supply of all materials, labours, scaffolding, tools, plants, all other incidental charges, etc., all complete and as directed by the Engineer in Charge. |
| 89 | Constructing brick masonry manhole in cement mortar 1:4 ( 1 cement : 4 coarse sand ) with R.C.C. top slab with 1:1.5:3 mix (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size), foundation concrete 1:4:8 mix (1 cement : 4 coarse sand (zone-III) : 8graded stone aggregate 40 mm nominal size), inside plastering 12 mm thick with cement mortar 1:3 (1 cement : 3 coarse sand) finished with thick with cement mortar 1:3 (1 cement : 3 coarse sand) finished with floating coat of neat cement and making channels in cement concrete Inside size 90x80 cm and 45 cm deep including C.I. cover with frame (light duty) 455x610 mm internal dimensions, total weight of cover and frame to be not less than 38 kg (weight of cover 23 kg and weight of less than 38 kg (weight of cover 23 kg and weight of frame 15 kg) With common burnt clay F.P.S. (non modular) bricks of class designation 7.5, including cost of supply of all materials, labours, scaffolding, curing, tools, plants, all other incidental charges like pumping of water, shoring if any etc., all complete and as directed by the Engineer in Charge. |
| 90 | Providing and fixing Vitrified tiles, Glazed ceramic tiles for walls Dadoing, Decorative tiles Concept type design tiles Dadoing for washroom, Anti Skid tile flooring etc., are confirming to IS: 13753 of minimum thickness 10mm of approved make like (NITCO, Orient, Somany, Kajaria) or equivelent of of approved quality and make in all colour, Glazed tile of size 300mmX450mm & floor tiles 300 x 300mm after spreading & leveling with C.M. 1:3 of thick 20mm (avg) & pointing with white cement of approved quality admixture with colour pigment etc. as directed including supply of all labour, material , curing, tools& plants etc. complete. |
| 91 | Providing and laying vitrified floor 600X600 mm tiles in (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ sqm including grouting the joints with white cement and matching pigments etc., including cost of supply of all labours, materials, curing, tools& plants etc. complete as directed by the Engineer in Charge.. |
| 92 | Providing & fixing ceramic Antiskid tiles of approved 1st quality, size and colour (600 x 600mm /300X300mm), including grouting the joints with white cement and matching pigments etc., including cost of supply of all labours, materials, curing, tools & plants etc. complete as directed by the Engineer in Charge. |
| 93 | Providing and fixing Decorative concept design tiles for walls of bath room walls, toilets etc., (300mx450mm), of approved make and design, including grouting the joints with white cement and matching pigments etc., including cost of supply of all labours, materials, curing, tools & plants etc. complete as directed by the Engineer in Charge.. |
| 94 | Providing and fixing 18 mm thick gang saw cut, mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias, Verandah and steps and similar locations of required size, approved quality, shade, colour and texture laid over 20 mm thick base cement mortar 1:4 (1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. Providing edge moulding to 18 mm thick granite stone counters, Vaniti etc., including machine polishing to edge to give high gloss finish etc., as per design approved, including grouting the joints with white cement and matching pigments etc., including cost of supply of all labours, materials, curing, tools & plants etc. complete as directed by the Engineer in Charge. |
| 95 | Providing and fixing 18 mm thick granite gang saw cut, mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, etc., including grouting the joints with white cement and matching pigments etc., including cost of supply of all labours, materials, curing, tools & plants etc. complete as directed by the Engineer in Charge. |
| 96 | Providing edge moulding to 18 mm thick granite stone counters, Vaniti etc., including machine polishing to edge to give high gloss finish etc., complete as per design approved including grouting the joints with white cement and matching pigments etc., including cost of supply of all labours, materials, curing, tools & plants etc. complete as directed by the Engineer in Charge. |
| 97 | Extra for providing opening of required size & shape for wash basin/ kitchen sink in kitchen platform, vanity counter and similar location in marble/Granite / stone work, including necessary holes for pillar taps etc. including moulding, rubbing and polishing of cut edges etc. complete. |
| 98 | Extra for fixing marble/granite stone, over and above corresponding basic item, in facia and drops of width upto 150 mm with epoxy resin basedadhesive, including cleaning etc. complete. |
| 99 | Repairs to plaster 1: 4 (1 cement: 4 fine sand) SBR polymer (of approved make/brand) of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground,including cost of supply of all labours, materials, scaffolding, curing, tools & plants etc. complete as directed by the Engineer in Charge. |
| 100 | Providing 12 mm cement plaster finished with a floating coat of 1:3 (1 cement: 3 fine sand) neat cement of mix, including cost of supply of all labours, materials, curing, tools & plants etc. complete as directed by the Engineer in Charge. |
| 101 | Add for plaster drip course/ groove in plastered surface or moulding to R.C.C. projections, including grouting the joints with white cement and matching pigments etc., including cost of supply of all labours, materials, curing, tools & plants etc. complete as directed by the Engineer in Charge. |
| 102 | Providing and laying 60mm thick factory made cement concrete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50mm thick compacted bed of coarse sand, filling the joints with line sand etc. including cost of supply of all labours, materials, curing, tools & plants etc. complete as directed by the Engineer in Charge. |
| 103 | Cleaning of Septic Tank by removal of slugde mechanically and disposal of the same as directed as per the conditions, including cost of supply of all labours, materials, tools, transport, disposal, vehicle etc. complete as directed by the Engineer in Charge. |
| 104 | Cleaning of under ground sump, Over Head R.C.C. Tank (independent staging) including disposal of slit and rubbish, all as per direction of Engineer-in-Charge. The cleaning shall consist following operations:- (i)Tank shall be emptied of water by pumping & bottom shall be cleaned of silt and other deposits.(ii) Entire surface area of the sump shall then scrubbed thoroughly with wire brush etc. and pressure washed with water. (iii) Chlorination of RCC internal surface by liquid chlorine. (iv) The treated surface shall be dried using air jetting and all loose particles shall be removal from the surface.(v) Finally the surface shall be treated with ultraviolet radiation etc. as per direction of Engineer-in-Charge. The cost is inclusive of all materials, labours, tools, plants, other incidental charges if any etc., complete. |
| 105 | Making soak pit 2.5 m diameter 3.0 metre deep with 45 cm x 45 cm, including cost of supply of all materials, labours, tools, plants, all other incidental charges like pumping of water, shoring if any etc., all complete and as directed by the Engineer in Charge. |
| 106 | Making soak pit 2.5 m diameter 3.0 metre deep with 45 cm x 45 cm dry brick honey comb shaft with bricks and S.W. drain pipe 100 mm diameter, 1.8 m long complete as per standard design. With common burnt clay F.P.S. (non modular) bricks of class designation 7.5, including material and labour all complete as directed. |
| 107 | Filling in brick bats in Soak pit with approved first quality brokened bricks of 63 mm size etc., Supply of all materials, labours, tools and all other charges etc., Complete, by the Engineer in Charge. |
| 108 | Supplying and fixing C.I. cover without frame for manholes 455x610 mm rectangular C.I. cover (light duty) the weight of the cover to be not less than 23 kg, including supply of all materials, labours, tools, plants, fittings, other incidental charges if any etc., complete. |
| 109 | Disconnecting damaged overhead/terrace PVC water storage tank of any size from water supply line and removing from the terrace including shifting at ground level, including cost of all materials, labours, tools, plants, shifting from all heights and to any leads, other incidental charges if any etc., complete, as per direction of Engineer-in-charge. |
| 110 | Dismanling and disconnectiong old water supply PVC Blue Threded Line in allied buildings including disposal of unservicsable and stocking servicable material including cost of all materials, labours, scaffolding, tools, plants, shifting from all heights and to any leads, other incidental charges if any etc., complete, as per direction of Engineer-in-charge. |
| 111 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved, including cost of labour, materials, transport, disposal etc., complete, as per direction of Engineer-in-charge.. |
| 112 | Supply of prefabricated Portable EWC toilet block for single user shall be suitable for mounting on plain ground. The Superstructure and base shall be manufactured by using roto-molded process. The overall dimension of toilet shall be (910 mm (w) x 1075 mm (D) x 2060 mm (H)) plus or minus 10mm1.FLOOR / BASE: The floor/ base shall be double wall constructed ready-made base made out with Plastics material by roto-molded process. The PUF shall be filled in cavity between two walls for extra load bearing. The base shall be single peace molded with required outlets. Special handle shall be provided on two side of toilet block for easily shifting, loading and un-loading the whole block.2.Wall / Roof (Superstructure): The superstructure of toilet shall be One-piece molded Plastics walls and roof with single wall construction by Roto-molded process. The superstructure shall be fixed on Base with suitable fasteners. The air ventilator shall be provided in three side walls for cross air circulation. A special top cap shall also be fixed on top of toilet for natural light and air vent. The superstructure has many nos. of embossed ribs for better strength.3.DOOR SHUTTER: 20mm thick and 600mm width Single leaf shutter shall be made out with extruded PVC Section. The door shutter shall be provided with 1 No. aldrops at outside & 1 No. tower bolt in side for locking, and 100mm long handles shall also provide on both the sides4.SANITATION, PLUMBING & ELECTRICAL WORK: 1 No. White Ceramic EWC pot with plastics flush tank, 1 No. Drain hole,1 no. Tap connection with PVC Pipe & Plastics Tap, 1 No. Bulb Point with switch shall be provided inside the toilet. Outside plumbing works shall be paid separately. Any other works required for successful installation shall be inclusive and no additional claim in this regard shall be entertained. |
| 113 | Supply & Fixing of Bio septic tank 2000 Litre Specification: Capacity 2000 Ltr, Length 1200 MM, diameter 1200 MM, No of Man Hole : 2, Man hole 450 MM, including cost of all materials, labours, fittings, accessories, tools, equipments, machineries, plants etc., for installation complete as directed by Engineer in Charge. |
| 114 | Supplying of Prefabricated shelter shall be suitable for mounting on readymade concrete floor / pillars. The components shall be fabricated at factory for easy to assembly at site. (Handicap toilet) SPECIFICATION FOR PUF INSULATED PREFABRICATED CABIN. Size : 6*6*8 Ft(plus or minus 12 cm) M.S. Structure: The supported M.S. Structure like column, truss / portal truss, purlin, tie member etc. shall be made out with suitable size rolled / tube / folded sections. The structure shall be painted with One coat of red oxide as primer. Wall: The insulated walls shall be made of Sandwich panels. The sandwich panels shall be made out of 0.35mm thick Pre coated steel sheet on both side of PUF ( Polyurethane foam ). The total thickness of panel shall be 30mm. The panels are join together by tongue and groove method. (RAL 9002- WHITE COLOUR) Roof: The insulated Roof cladding shall be done with sandwich type panels. The panels shall be made out with 0.35 mm thick Pre coated Profile steel sheets at outer side and 0.35 mm thick Pre coated plain sheet at inner side of PUF ( Polyurethane foam ). Total thickness of roof panel shall be 30 mm. Suitable ridge shall be made out from Pre coated steel sheets. The roof shall have minimum projection of 0.3mm from the eaves wall and 0.15mm from the gable walls. (RAL9002 -WHITE COLOUR) Door : The door frame shall be made out with MS Folded section. The shutter shall be made out with Pre coated steel sheets both side of PUF. The door shutter shall be fixed with the door frame with hinges. The door shutter shall be provided with 1 No. aldrops at out side, 1 no. Tower bolts at the center inside and handles shall be provided on both the sides. The width of Door shall be 1mt. One No. of EWC of approved make. The cost is including cost of all materials not othersise specified, labours, fittings, accessories, tools, equipments, machineries, plants etc., for installation complete as directed by Engineer in Charge.Any other works required for successful installation shall be inclusive and no additional claim in this regard shall be entertained. The external plumbing works outside the bio-toilet shall be paid separately. |
| 115 | Providing and fixing stainless steel ( Grade 304) Schedule 40 railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in-charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.), including supply of all materials, labours, cutting, welding, tools, plants, fittings, other incidental charges if any etc., complete. |
| 116 | Fixing Door chowkhats in existing opening including embedding chowkhats in floors or walls cutting masonry for holdfasts, embedding hold fasts in cement concrete blocks of size 15 x 10 x 10 cm with cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size), painting two coats of approved wood preservative to sides of chowkhats and making good the damages to walls and floors as required complete, including cost of all materials, labours, shifting, handling, stacking, scaffolding, fittings, accessories etc., and disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge. |
| 117 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead :Of area 3 sq. metres and below, as required complete, including cost of all materials, labours, shifting, handling, stacking, scaffolding, etc., and disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge. |
| 118 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complet. Fixed to openings /wooden frames with rawl plugs screws etc.Fixed to openings /wooden frames with rawl plugs screws etc ( match with existing desgin ), as required complete, including cost of all materials, labours, shifting, handling, stacking, scaffolding, etc., and disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge. |
| 119 | Supplying and fixing in position at site of Granite Stone bench ( un polished/ matt finished) of 1.5m length slab for seating of thickness of Granite stone slab 65 mm to 75 mm thick with two side leg and back rest as per drawing/ photo image and as directed. cost including supply of all material, labours for Fabrication/ fixing at site loading and unloading transportation and tools and plants, etc. complete ad directed by Engineer in charge. (at locations as per drawing) |
| 120 | Painting with first quality synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on old work over a coat of ready mixed red oxide zinc chromate primer for children play equipment, existing 2 nos. of bio-toilets etc., available at the station. (Berger/ Asian brands) and approved colour, after scraping and cleaning the worn out paint and applying one coat of primer wherever required surface as directed, including supply of all materials, labour, scaffolding, tools and plants , rope, ladder, and all othercharges etc. complete as directed by Engineer in charge. |
| 121 | PART - B Horticulture and Gardening work Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared, including cost of all labours, machineries, tools, plants, disposal etc., complete as directed by the Engineer in Charge. |
| 122 | Ploughing the existing ground to a depth of 15 cm to 25 cm, softening of soil, weeding out and watering the same in All kinds of soil , including cost of all labours, machineries, tools, plants, disposal etc., complete as directed by the Engineer in Charge. |
| 123 | Clearing grass and removal of the rubbish up to a distance of 50 m outside, including cost of all labours, machineries, tools, plants, disposal etc., complete as directed by the Engineer in Charge. |
| 124 | Supplying and stacking of good earth at site including royalty and carriage upto 5 km lead complete (earth measured in stacks will be reduced by20% for payment), including cost of all materials, labours, machineries, tools, plants, transport, loading, unloading, stacking etc., complete as directed by the Engineer in Charge. |
| 125 | Supplying and stacking of well decayed cattle manure at site including royalty and carriage upto 05 k.m. lead complete (Cattle manure measured in stacks will reduced by 8% for Payment), including cost of all materials, labours, machineries, tools, plants, transport, loading, unloading, stacking etc., complete as directed by the Engineer in Charge. |
| 126 | Mixing earth and sludge or manure in the required proportion specified or including cost of all labours, machineries, tools, plants, stacking etc., complete as directed by the Engineer in Charge. |
| 127 | Spreading of sludge, including cost of all labours, machineries, tools, plants, stacking etc., complete as directed by the Engineer in Charge. |
| 128 | Spreading of sludge, dump manure and/or good earth in required thickness as per direction of officer-in-charge (cost of sludge, dump manure and/ or good earth to be paid separately, including cost of all labours, machineries, tools, plants, stacking etc., complete as directed by the Engineer in Charge. |
| 129 | Fine dressing of the ground, including cost of all labours, machineries, tools, plants, stacking, disposal etc., complete as directed by the Engineer in Charge. |
| 130 | Supplying vermi compost at site including cost of materials, labours and tranportation etc., Complete. (300Kg Vermi composit to be handed over to Light house incharge ), including cost of all materials, labours, machineries, tools, plants, transport, loading, unloading, stacking etc., complete as directed by the Engineer in Charge. |
| 131 | Providing and Edging with bricks laid dry length wise, including required excavation, refilling, consolidating with hand packing and spreading surplus earth neatly within a lead of 50 m : Common burnt clay F.P.S (non modular) bricks of Class designation 7.5, including cost of all materials, labours, tools, plants, transport, loading, unloading, stacking etc., complete as directed by the Engineer in Charge. |
| 132 | Anti termite treatment of lawn area through Chloropyriphose 20% E.C., 5 liter diluted in 995 liters water and applying solution @ 1.00 litre solution per sqm each application in lawn / bed area (two application) i/c cost of chemical) including cost of all materials, labours, machineries, tools, plants, transport, application etc., as per manufacturer's instructions, complete as directed by the Engineer in Charge. |
| 133 | Providing and laying lawn with Bermuda grass/ Mexican grass (as approved) as grass turf with earth 50mm to 60mm thickness of existing ground prepared with proper level and ramming withtools wooden (Dhurmos) and than rolling the surface with light roller make the surface smoothen and light waterning with sprinkler and maintenance for 30 days or more till the grass establish properly, as per direction of officer-in-charge before planting. including cost of all materials, labours, machineries, tools, plants, transport, loading, unloading, stacking, spreading, laying, watering etc., complete as directed by the Engineer in Charge. |
| 134 | Digging of pits in ordinary soil to depth of 30 x 30 x 45cm and filling the red earth mixed with vermi compost etc., .including cost of supply of all labours, materials, tools & plants, and all other charges etc.,complete, as directed by Engineer in charge. |
| 135 | Providing and planting border plants (In Two Rows) like Mini Ixora / Mini Tecoma / Mini Neerium / Ruslilia / Asparagus / Mini Acalypha etc., including forming trenches and filing with mixed earth and vermi compost etc., including cost of supply of all labours, materials, tools & plants, and all other charges etc.,complete, as directed by Engineer in charge. |
| 136 | Providing and planting Shrubs Golden Swarna Champa Plant / Furcuria / Cycas/ficus blackii/Ficus Panda Yellow etc., including cost of supply of all labours, materials, tools & plants, ,transportation and all other charges etc.,complete, as directed by Engineer in charge. |
| 137 | Providing and planting flowering shrubs like Ixora / Hibiscus / Neerium / Nandiavattai / Tecina and tree saplings like Cardia / cassia / bauhinia etc Including making pit and back filling red earth with vermi compost., as approved including cost of supply of all labours, materials, tools & plants, ,transportation and all other charges etc.,complete, as directed by Engineer in charge. |
| 138 | Supplying and positioning potted plants having ht. 60 cm to 75 cm with 4 to 6 branches like Croton Petra, Aglaonema Anjamanee, Areca palm, Chamaedorea elegans palm,Baby Croton (Codiaeum variegatum), Raphes palm,Bamboo Buddha valley etc in pots, as approved including cost of supply of all labours, materials, tools & plants, ,transportation and all other charges etc.,complete, as directed by Engineer in charge. |
| 139 | Providing, stacking, positioning and Displaying Cycus cirsnallis well developed with fresh & healthy 35 to 40 lush green leaves in 40 cm Cement Pot/ Plastic Pot as approved including cost of supply of all labours, materials, tools & plants, ,transportation and all other charges etc.,complete, as directed by Engineer in charge. |
| 140 | Supplying of good quality hose pipe of length 30mtrs. (one roll) of approved quality and make, including cost of Supply of all materials, transportation etc., Complete and handed over as per the directives of Engineer in charge (for gardening/watering purpose) |
| 141 | Providing and wartering of irrigation water through water tanker of Horticulture features i.e. lawn, tree, shrubs, hedge/edge, ground cover etc. at the site of work. Water tanker having 5000 lit. capacity with one labour for wateringi/c cost of water, filling of tanker, watering at site with all leads and lifts( two trips per week), as per the directives of the Engineer in charge on as and when required basis, including cost of supply of all labours, water, tools & plants, transportation and all other charges for watering etc.,complete, as directed by Engineer in charge. Please Enable Macros to View BoQ information |