| 1 | Earthwork in excavation for structures as per drawing and technical specification clause 305.1 including setting out construction of shoring and bracing ,removal of stumps and other deleterious materials and disposal upto all leads and lifts dressing of sides and bottom and backfilling in trenches with excaveted suitable materials as per MORD Specification directed by Engineer-In- Charge |
| 2 | Providing and laying concrete for plain /reinforced concret in open foundation complete as per drawings and technical specifications MORD clause 802, 803, 1202 &1203 including carriage of materials in all leads and lifts. a)P.C.C 1:4:8.(1 Cement :4 sand : 8 Agg. 40mm nominal Size) i/c carriage of material within all leads & lifts As per the direcion of Engineer In-Charge. |
| 3 | Providing and laying concrete for plain /reinforced concret in open foundation complete as per drawings and technical specifications MORD clause 802, 803,1202 &1203 including carriage of materials in all leads and lifts. a)P.C.C 1:3:6.(1 Cement :3 sand : 6 Agg. 20mm nominal Size) i/c carriage of material within all leads & lifts As per the direcion of Engineer In-Charge. |
| 4 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, stone screening /binding material to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading-1 as per Technical Specification Clause 405. by mechnically means using stone aggregate 90mm to 40mm (Ninety to forty milimeter size) including carriage of material with in all leads, lifts and as per the direction of Engineer-In-Charge. |
| 5 | Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of sand, compacting and proper embedding /laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand. within all leads & lifts as per direction of Engineer-in- Charge. (80 mm) eighty milimiter thick C.C. paver block of M-30 grade with approved color design and pattern |
| 6 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete including carriage of material with in all leads, lifts and as per the direction of Engineer-In-Charge. |
| 7 | Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. |
| 8 | Backfilling Granular materials behind abutment, wing wall and retaining wall complete as per drawings & technical specification Clause 1204.3.8 including carriage of materials in all leads, lifts.and as per the direction of Engineer-In- Charge |
| 9 | Providing and laying 100mm dia metre PVC pipe for wheep holes complete of approved quality Including carriage of material within all leads, lifts and as per the direction of Engineer-In- Charge |
| 10 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two ormore coat applied @ 0.90 ltr/ 10 sqm over an under coat of primer applied @ 0.80 ltr/ 10 sqm of approved brand and manufacture and as per the direction of Engineer-In- Charge Please Enable Macros to View BoQ information |