| 1 | Dismantling of floor, hearth or wall tiling with cement mortar bedding, backing and dispose rubbish out off the premises complete all as specified and directed. |
| 2 | M&L non skid ceramic tiles colored tiles 7 to 8 mm thick area of each tile exceeding 0.18 sqm but not exceeding 0.38 sqm,in floor etc set and jointed in neat cement slurry and pointed in colour cement laid over and including 15mm thick cement mortar screed bed in CM (1:6) complete all as specified and directed. |
| 3 | M&L Viterified ceramic/Glazed tiles 10 mm thick square/rectangular light shade polished,area of each tiles exceeding 0.42 Sqm but Not exceeding 1.00 sqm,in floor etcb set and jointed with neat cement slurry and pointed with white cement mixed with pigment to match the colour of the tile including 15mm thick cement mortar screed bed in CM (1:6) complete all as specified and directed. complete all as specified and directed. |
| 4 | All as per ser Item No-3 here -in-before but on vertical surface as in dados/ skirting over 10mm thick rendering as backing coat in CM 1:4 complete complete all as specified and directed. |
| 5 | M&L glazed digital vitrified tiles (DVT) colour and shed as approved in vertical surface of size 450x300x7-8 mm thick with highlighter set and jointed in neat cement slurry and pointed in white or coloured cement to match the surface incl rendering 10mm thick in CM (1:4) and finished rough, complete all as spd & directed. |
| 6 | M&L for non-skid coloured ceramic Endura or similar approved industrial out door tiles 10mm thick, (square/rectangular), area of each tile exceeding 0.09 sqm but nexc 0.18 sqm, in floors etc. set & jointing in 3 kg neat cement slurry and pointed in white or coloured cement to match over and including 15mm thick screed bed or bedding layer of mortar in cement mortar (1:4) for laying floor finish,complete all as specified and directed. |
| 7 | S&F in repair 12 mm thick toughned glass door shutters of size area exc 1.50 Sqm but n exc 6 Sqm, including neccessary floor spring hydraulically regulated, otherside fixed on pivote. CP fiitings and fixtures, CP handles CP Locking arrangment, neccessary cuting & holes moulding and fixed in complete as specified and directed by Engr in Charge. |
| 8 | Grinding & polishing of existing flooring (Kota stone, white marble, green marble etc) by electric operated machine complete incl filling of joints with white cement mixed with pigment to match the floor including required polishing etc. complete all as specified and directed. |
| 9 | Dismantling Wall & ceiling boards any thickness, including frame work, cover fillets etc complete all as specified and directed. |
| 10 | S & F Gl frame work for step up and down designer seamless ceiling and wall lining comprising of Gl perimeter channnel 0.55 mm thick with two unequal flanges of 20 and 30 mm and web of 27 mm fixed to surrounding wall using nylon sleeves and screws at 450 mm centre to centre/intermediate channel 0.9 mm thick having two equal flanges of 15 mm each and web of 45 mm suspended from soffit at approx 900 mm centre to centre with Gl cleat and steel expansion fasteners with and including ceiling section (not exc 1.2 m length) of 0.55 mm thickness having kurled web of 50 mm and flange of 26 mm each with lips of 10.5mm fixed to the intermediate channel with connecting clips across the intermediate channel at 457 mm centre to centre and Hangers 6 mm dia. G.I. (upto 1200mm length) adjusting level fixed to roof slabs by means of ceilling cleats made out of G.I. flat 40 x 3 mm size 60mm long and expansion hold fasteners 12.5mm dia. 40mm long specing of hangers as per manufactures instructions complete in all respect as specified and directed. Note:- Entire work to be executed through authoried rep of manufacturer same shall be appeased by GE before incorporation in the work) |
| 11 | M & L for step up and down designer 10mm thick POP false ceiling (Gypsum anhydrous) & wall lining eleptical , half round or as approved design, shape & pattern fixed with screw including 2nd class HW fillets or metal frame work including GI wire mesh, Wire netting size of mesh 12 mm of galvanised steel wire 1.40mm dia fixed with tinned tacks of wire staples etc or as per manufacturers instructions including taping form work etc complete in all respect as specified and directed. |
| 12 | M&L for applying 3 mm thick water proofing wall care putty as in ceiling on gyp board/POP/RCC surface, rubbing and cleaning complete to get the surface even and smooth and applying two coats of OBD over a coat of primer including preparation of surfaces all as specified and directed. |
| 13 | Preparation of old surface after complete removal of existing treatment applying 1 mm thick wall care putty and making the surface smooth and applying two coat of oil bound distemper complete all as specified & directed.NOTE:- OBD shall be done with roller of required size instead of brush |
| 14 | M&L for preparation of old decorated plastered or unplastered surfaces of wall and applying two coats of oil bound distemper complete all as specified and directedNOTE:- OBD shall be done with roller of required size instead of brush |
| 15 | M&L two coats of oil bound distemper on surface of ceiling including preparation of old plastered previously treated surface complete all as spd and directed. |
| 16 | M&L for preparation of old decorated previously treated surfaces of wall by brooming down scrapping down smoke and efflorescent salts etc and applying one coat of white wash on walls complete all as specified and directed by Engineer-in-charge. |
| 17 | M&L for preparation of old decorated external wall surface by sand paper of required sizes , filling in wall care putty in potholes existing or created ,again sand papering thus making surface smooth and two coats of weather proofing interior acrylic emulsion paint complete all as specified and all as directed by Engineer in charge . Please Enable Macros to View BoQ information |
| 18 | M&L for preparation of old decorated external wall surface by sand paper of required sizes , filling in wall care putty in potholes existing or created ,again sand papering thus making surface smooth and two coats of weather proofing interior acrylic emulsion paint complete all as specified and all as directed by Engineer in charge . Please Enable Macros to View BoQ information |