| 1 | Earthwork in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan),including dressing of sides and ramming of bottoms, for all lift including getting out the excavated soil and disposal of surplus excavated soil as per direction of engineer in-change within a lead of 50m - all kinds of soil |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plith level - 1:5:10 (1 cement : 5 fine aggregate : 10 graded stone aggregate 40mm nominal size) |
| 3 | Providing and laying in position specified grade of reinforced cement concrete , excluding the cost of centering , shuttering , finishing and reinforcement - All work upto plinth level 1:1.5:3 (1cement : 1.5 fine aggregate : 3 graded stone aggregate 20 mm nominal size) |
| 4 | Reinforced cement concrete work in walls (any thickness) , including attached pilasters, buttresses , plinth and sting courses , fillets , columns , pillars , piers , abutments , posts and struts etc. upto floor five level excluding cost of centering , shuttering , finishing and reinforcement - 1:1.5:3 (1 cement : 1.5 fine aggregate :3 graded stone aggregate 20mm nominal size) |
| 5 | Reinforced cement concrete work in beams,suspended floors , roofs having slope up to 15 degree landings , balconies , shelves,chajjas, lintels, bands , plain window sills , staircases and spiral stair cases upto floor five level excluding the cost of centering ,shuttering, finishing and reinforcement , with 1:1.5:3(1 cement : 1.5 fine aggregate : 3 graded stone aggregate 20mm nominal size) |
| 6 | Centering and shuttering including strutting , propping etc and removal of form for - foundations, footings, bases of columns etc for mass concrete |
| 7 | Centring and shuttering including strutting, propping etc. and removal of form for : suspended floors, roofs, landings , balconies and access platform |
| 8 | Centering and shuttering including strutting , propping etc and removal of form for - Lintels , beams , plinth beams ,girders , bressumers and catilevers |
| 9 | Centering and shuttering including strutting , propping etc and removal of form for - Columns , Pillars , Piers , Abutments , Posts and Struts |
| 10 | Steel reinforcement for R.C.C.work including straightening , cutting , bending , placing in position and binding all complete upto plinth level - Thermo -Mechanically treated bars Fe -500D or more |
| 11 | Brick work with common burnt clay F.P.S (non modular ) bricks of class designation 3.5 in superstructure above plinth level upto floor five level in all shapes and sizes in - cement mortar 1:6 ( 1 cement : 6 fine aggregate) |
| 12 | Brick work with common burnt clay modular bricks of class designation 7.5 in foundation and plinth in - cement mortar 1:6 (1 cement : 6 fine aggregate) |
| 13 | 15mm cement plaster on the rough side of single or half brick wall of mix - 1:6 (1cement : 6 fine aggregate) |
| 14 | 12mm cement plaster of mix -1:4 ( 1 cement : 4 fine aggregate) |
| 15 | 6mm cement plaster of mix 1:3 (1 cement : 3 fine aggregate) |
| 16 | Applying priming coat with primer of approved brand and manufactrure having low (voc) volatile organic compound content with water thinnable cement primer and wall surface having voc content less than 50 grames/litre |
| 17 | Finishing with deluxe multi surface paint system for interiors and exteriors using primer as per manufacture's specification- Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of special primer applied @ 0.75 ltr/10sqm |
| 18 | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc., complete |
| 19 | Steel work welded in built up sections framed work , including cutting,hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required - in gratings, frames, guard bar, ladder, railings, brackets,gates and similar works |
| 20 | Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge |
| 21 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density - Using vibratory roller. (As per MoRTH specification, 4th Revision) |
| 22 | providing and applying primer coat with bitumen emulsion on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means. (As per MoRTH specification, 4th Revision) |
| 23 | Providing and laying bituminous macadam with hot mix plant of capacity not less than 40 -60 TPH using crushed aggregatesof specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 507.7 of MoRTH specification, 4th Revision, to achieve the desired compaction. - using grade II metal and bitumen - VG30 |
| 24 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg. per sqm. on the prepared bituminous / granular surface cleaned with mechanical broom. (As per MoRTH specification, 4th Revision) |
| 25 | Providing and laying semi-dense bituminous concrete with HMP of capacity not less than 40 - 60 TPH using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per clause 508 of MoRTH specification, 4th Revision, complete in all respects - Using grade-II material and using birumen - VG30 |
| 26 | Engaging front end loader (including operating staff and fuel)as per the direction of engineer -in-charge Please Enable Macros to View BoQ information |