|
| 1 | Dismentalement Charges of LT line. |
| 2 | Dismentalement charges of ST poles 8/9Mtr. (with complete accessories.) |
| 3 | De-sagging of ACSR conductor 6/1/2.59mm. (Removal of conductor & De stringing only) |
| 4 | ERRECTION OF L.T LINE ON 8/9Mtr. Long S.T pole. |
| 5 | (i) Digging of pit, Laying of RCC muff,Drilling of holes in poles. Erection of pole,Erection of shackle insulator, filing of pit and ramming, Painting of pole. (Complete in all respect). |
| 6 | ERRECTION OF STAY SET |
| 7 | Digging of pit, fixing of stay rod, filling of pit, Nozzeling & Tighting.) Complete in all respect. |
| 8 | ERRECTION OF EARTHING SET |
| 9 | Digging of pit, fixing of GI wire to the earthing system, Filling of pit. |
| 10 | SAGGING OF ACSR CONDUCTOR 6/1/3.35mm (Single wire). |
| 11 | Laying of conductor, stringing & sagging, Binding with insulator (only). |
| 12 | Sagging of G.I Wire for earth wire. |
| 13 | MANNUAL CARRIAGE OF L.T LINE MATERIAL CONSIDERING AVERAGE DISTANCE 0.300K.M. |
| 14 | MATERIAL TO BE SUPPLIED BY CONTRACTOR (Subject to the non-availability of material at Divisional Store). |
| 15 | Prov.RCC Muffs (2000mm) with concrete filling. |
| 16 | Prov .Shakle Insulator (16KN) |
| 17 | Prov. D-Iron |
| 18 | Prov. Nuts & bolts. |
| 19 | Prov. Aluminium paint. |
| 20 | Prov. LT stay set. (i/c stay clamp) |
| 21 | Prov. support clamp |
| 22 | Prov. LT earthing set |
| 23 | Prov. GI wire (8SWG) for earth wire |
| 24 | Providing Egg Insulator. |
| 25 | Prov. stay Wire (7/3.15mm) |
| 26 | Prov. AI 50x50x6mm (for bracket 3mtr. Per Bracket) |
| 27 | Prov. Half Clamp (MS flat 50x6mm) 2no. Per bracket. |
| 28 | Prov. Full Clamp (MS flat 50x6mm) 2no. Per bracket. Please Enable Macros to View BoQ information |