| 1 | Name of Work:Construction of Rural Body Election Ballot Box storage Godown @ Kinathukadavu union office |
| 2 | Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with stand |
| 3 | CEMENT CONCRETE 1:4:8 mix using 40mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification. |
| 4 | Fillling in basement with conveyed gravel layers of not more than 15cm thick,well rammed, watered and compacted, complying with standard specification etc., complete. |
| 5 | Supplying and filling in foundation and basement and trenches with FILLING M.SAND in layers of not more than 15cm thick, well watered,rammed and consolidated complying with standard specification etc.,complete. |
| 6 | BRICK WORK in cement mortar 1:5 (One cement and five sand) using second class country bricks of size 23cm x 11cm x 7cm for the following including curing etc., complete complying with standard specifications. (Masonry projections wherever necessary for obtaining required elevation shall be done without extra cost). |
| 7 | Supplying and erecting CENTERING for sides and soffits including supports and strutting upto 3.29 m high for plane surfaces such as RCC SLABS, RECTANGULAR BEAMS, TEE or ELL BEAMS, LINTELS, BED BLOSKS. STAIRCASE WAIST and landing slabs, landing beams, canopy etc., in all floors with all cross bracings using mild steel sheets of size 90cm * 60cm and BG 10 stiffened with welded mild steel angles of size 25mm * 25mm * 3mm for boarding laid over countrywood joists of size 10cm * 6.50cm spaced at about 90cm centre to centre and supported by Casuarian props of 10cm to 13cm dia spaced at 75cm centre to centre etc., complete and as directed. |
| 8 | Rate for roof slab, lintel, beam |
| 9 | Supplying, fabricating and placing in position mild steel/Ribbed tor steel rods for all RCC works including cost of steel and binding wire also in all floors, complete complying with standard specfication. |
| 10 | Reinforced CEMENT CONCRETE 1:1.5:3 mix using 20mm machine crushed 20mm gauge hard broken granite stone jelly for all reinforced cement concrete works connected to this work excluding cenetering, shuttering and cost of reinforcement grills placed in position, but including laying, vibrating, curing and finishing, fixing fan clamps in the RCC floor and roof slab works wherever necessary and bearing surfaces of the wall at the sides and bottom of the slab, beams shall be finished smooth with cement mortar 1:3 (One cement and three sand ) and Kraft paper laid without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers. |
| 11 | Supply and applying putty 3mm thick including all labour charges etc |
| 12 | PLASTERING with cement mortar 1:5 (one cement and five sand)12mm thick in all floors complying with standard specifications. |
| 13 | Weathering course with best quality broken brick jelly of size 20mm uniform gauge in pure slaked lime (no sand to be listed) over the RCC roof slab in the proposition being brickjelly to lime 32:12:1/2 by volume and laid over into a single layer and cons |
| 14 | Finishing the top of the roof with one course of Machine PressedTiles of size 20 cm x 2 cm of approved quality laid in CEMENT MORTAR 1:3(One cement and three sand) 12 mm thick mixed with water proofing compound conforming to ISS by 2% weight of cement us including all charges etc. |
| 15 | Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers) |
| 16 | Supply and fixing of steel Door etc |
| 17 | Manufacturing, supplying and fixing in position of steel windows with the following specifications. Outer frames of windows made of \\"Z\\" section F7D of size 33 x 25 x 3mm at 1.419kg/m and mullion \\"J\\" section (F4B) of size 46 x 25 x 3mm at 2.28kg/m and shutter section of made of F7D of 33 x 25 x 3mm at 1.419kg/m as specified in IS 7452/1990. ach openable shutter should not exceed a width of 600mm to enable separate operations and easy maintanenance. The panel of the shutters to be covered with 18 gauge cold rolled sheet of superior quality and welded intact with shutter frames. Horizontal stiffeners using 18 x 5mm MS flat at 0,70kg/m at 3Nos. for each shutter and additional diagonal stiffeners of the same MS flats at all the four corners of each shutters to the suitable length welded to the shutters, for holding the CR sheets in position firmly. |
| 18 | PAINTING NEW IRON WORKS for doors, windows and Ventilators, Iron bars, Weldmesh, wiremesh, screen, steel bars, flats and other similar works etc., with TWO COATS of approved first quality of synthetic enamel paint over the existing red oxide primer in all floors. The rate is inclusive of cost of all materials and labour, brushes and scaffolding charges etc., complete complying with standard specification. (The paint to be used should be got approved by the engineer before use on work. |
| 19 | Distembering two coats with best approved oil bound distember including cost of painting priming coat over new plastered surface and conveyance of all materials to site and all labour charges |
| 20 | Interior / Exterior Emulsion Two coats over priming coat including cost and conveyance of all materials and labour charges etc complete. |
| 21 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \\"BB\\" for all works in this package} Please Enable Macros to View BoQ information |