| 1 | Schedule A - Main block Ground floor |
| 2 | Main Entrance |
| 3 | Office |
| 4 | Manager Room |
| 5 | Corridor |
| 6 | Marketing Officers cabin & Marketing Section |
| 7 | Mktg. sub Store |
| 8 | Technical Officers Cabin |
| 9 | Dispatch dock & Corridor & Lift near |
| 10 | MIS Room |
| 11 | Conference Hall |
| 12 | Ghee Biscuit Production Area |
| 13 | Consumable storage area I |
| 14 | Consumable storage area between Panel board Room &Dosa batter Production Room |
| 15 | Finished Goods Store |
| 16 | Panel Board room |
| 17 | Old Stair case steps |
| 18 | Idli/Dosa Batter Production Area |
| 19 | Idli/Dosa Batter Ingredients Storage area |
| 20 | Idli/Dosa Batter Packing & Date Coding room |
| 21 | Deep freezer area |
| 22 | Milma Plus (Glass) Production area |
| 23 | Milma Plus (PP) Production area |
| 24 | Gulabjamun Production area |
| 25 | Milk reception dock & Corridor 1 |
| 26 | All curtains |
| 27 | All Chair Towels |
| 28 | All Glass frames |
| 29 | All windows and Doors |
| 30 | All Furniture |
| 31 | All Computers and Telephones |
| 32 | All Amirah’s |
| 33 | All tubes and fans |
| 34 | Glazed tiles |
| 35 | All Ceilings |
| 36 | All switch boards |
| 37 | Schedule B - Main Block First floor |
| 38 | Stair case 1 Landing and bottom area |
| 39 | Stair case 1 steps |
| 40 | Lift near milma plus |
| 41 | Store under milma plus |
| 42 | Stair case 2 Landing and bottom area |
| 43 | Stair case 2 steps |
| 44 | Stair case 3 Landing and bottom area |
| 45 | Stair case 3 steps |
| 46 | Changing room/Toilets Gents & Ladies |
| 47 | Peda Vat area |
| 48 | Peda Moulding Room |
| 49 | Peda packing & Flow wrap Area |
| 50 | Peda Drying Room I &II |
| 51 | Corridoor |
| 52 | Sugar storage area |
| 53 | Consumable store area |
| 54 | HMST tank area |
| 55 | Visitors Bay |
| 56 | Open terrace |
| 57 | ADO's cabin |
| 58 | All curtains |
| 59 | All Chair Towels |
| 60 | All Glass frames |
| 61 | All windows and Doors |
| 62 | All Furniture |
| 63 | All Computers and Telephones |
| 64 | All Amirah’s |
| 65 | All tubes and fans |
| 66 | Glazed tiles |
| 67 | All Ceilings |
| 68 | All switch boards |
| 69 | Schedule –C GHEE Block |
| 70 | Entrance |
| 71 | Corridor 1 |
| 72 | AE Cabin |
| 73 | APO Cabin |
| 74 | Toilets |
| 75 | Cream Reception Dock and its steps |
| 76 | Ghee Dispatch dock |
| 77 | Ghee filling room |
| 78 | Ghee Consumable store First Floor |
| 79 | Filled ghee stocking room I |
| 80 | Filled ghee stocking room II |
| 81 | Stair case steps |
| 82 | Stair case Area with landing |
| 83 | Corridor 2 |
| 84 | Microbiology Lab |
| 85 | QC Lab |
| 86 | Empty cans storage room |
| 87 | Ghee Manufacturing Hall |
| 88 | Outside Corridor |
| 89 | Open Terrace portion 1 |
| 90 | Open Terrace portion 2 |
| 91 | Solar Tank and Panel floor area |
| 92 | Solar Tank and Panels |
| 93 | All ceiling & walls of ghee block |
| 94 | All curtains |
| 95 | All Chair Towels |
| 96 | All Glass frames |
| 97 | All windows and Doors |
| 98 | All Furniture |
| 99 | All Computers and Telephones |
| 100 | All Amirah’s |
| 101 | All tubes and fans |
| 102 | Glazed tiles |
| 103 | All switch boards |
| 104 | ACP sheet - ventilators |
| 105 | Steps and platform of ghee processing block |
| 106 | Water cleaning of all Fibre furniture |
| 107 | Stair case - Hand rail |
| 108 | Outside stair case |
| 109 | Schedule -D-Amenity Block |
| 110 | Rest room for Men |
| 111 | Toilets for Men |
| 112 | Rest room for ladies |
| 113 | Toilets for ladies |
| 114 | Rest room for officers |
| 115 | Toilets for officers |
| 116 | Corridor |
| 117 | Stair case front area |
| 118 | Stair case steps and landing |
| 119 | Canteen surroundings |
| 120 | Open terrace |
| 121 | All ceiling &walls |
| 122 | All Curtains |
| 123 | All glass frames |
| 124 | All windows and doors |
| 125 | All furniture |
| 126 | All Amirah’s |
| 127 | All tubes ,fan, switch board |
| 128 | Glazed tiles |
| 129 | Front Glass and ACP sheet - ventilators |
| 130 | Schedule -E-Canteen Building |
| 131 | Dining Room including Hand Washing Area |
| 132 | Schedule -F-Milk Parlour Campus |
| 133 | Milk parlour cleaning |
| 134 | Schedule –G - Outside Campus |
| 135 | Security cabin I& II |
| 136 | Vehicle stand |
| 137 | Car Parking Area |
| 138 | Front side gate area |
| 139 | All Tar road and Pump house road |
| 140 | Drainage & Manhole |
| 141 | Outside Toilet - 2 no’s |
| 142 | Boiler house area |
| 143 | Ceiling, walls, of Boiler house |
| 144 | Main Consumable store 1 |
| 145 | Main Consumable store 2 |
| 146 | Main Consumable store 3 |
| 147 | Main Consumable store 4 |
| 148 | Generator room area |
| 149 | Generator, walls ,Ceiling |
| 150 | Chemical Shed |
| 151 | New Work shop |
| 152 | Marketing godown inside and its frontage |
| 153 | Pump House |
| 154 | Pressure filter room |
| 155 | Open well & surrounding |
| 156 | ETP area |
| 157 | Transformer Yard |
| 158 | HT Yard |
| 159 | Area Near Ghee residue tank |
| 160 | Air compressor area |
| 161 | All foot path area |
| 162 | Hard Parking area in ghee block |
| 163 | Front compound wall & surrounding |
| 164 | Scrap area near boiler house |
| 165 | New Water Sump area |
| 166 | Schedule (H to S) - General Cleaning Works |
| 167 | Washing and Ironing of Uniforms* |
| 168 | Washing and Ironing of Officers overcoat |
| 169 | Toilets & Bathroom |
| 170 | Removal of Ghee residue and other waste and feeding to biogas plant |
| 171 | Fountain cleaning |
| 172 | Over Head water tank cleaning |
| 173 | Vapour Hood and ducts cleaning |
| 174 | Complete campus freeing from weeds and grass - Back side of Dairy |
| 175 | All sorts of pipe lines in the plant |
| 176 | Solar Panels and its Tank Cleaning |
| 177 | Sintex Tank |
| 178 | Water Sump Please Enable Macros to View BoQ information |